№ lp_2_1_04734
File format: docx
Character count: 4015
File size: 29 KB
An industry position paper outlining the proposal for standardizing and publishing cost estimates for system upgrades triggered by developers, with a focus on improving transparency and consistency.
Year:
2022
Region / City:
N/A
Topic:
Industry Position Paper on Cost Estimates for System Upgrades
Document Type:
Industry Position Paper
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Industry professionals, utilities
Validity Period:
N/A
Approval Date:
2022-05-19
Amendment Date:
N/A
Note:
Contextual Description
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
United States
Topic:
Cost Estimation, Program Management
Document Type:
Standard Process
Organization:
Air Force Life Cycle Management Center (AFLCMC)
Author:
AFLCMC/FZC
Target Audience:
AFLCMC personnel, program managers, cost estimators
Period of Validity:
Ongoing annual process
Approval Date:
20 March 2025
Date of Changes:
20 March 2025
Note:
Agency
Appendix A:
Base Estimate
Appendix B:
Base Schedule
Appendix C:
Risk Dashboards
Year:
Not specified
Region / City:
Not specified
Subject:
Industry Trends, Market Sizing
Document Type:
Lesson Plan
Organization / Institution:
Wadhwani Foundation
Author:
Not specified
Target Audience:
Students
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
United States
Topic:
Project Risk Management
Document Type:
Guide
Organization / Institution:
Florida Department of Transportation (FDOT)
Author:
Tim Brock
Target Audience:
Project Managers, FDOT Employees
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / City:
South Miami, Florida
Topic:
Zoning Amendment, Urban Planning
Document Type:
Ordinance
Authority/Institution:
City of South Miami
Author:
Mayor and City Commission of the City of South Miami
Target Audience:
Local businesses, city officials, urban planners
Effective Date:
Unknown
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2012
Region / City:
United States
Subject:
Special Supplemental Nutrition Program for Women, Infants and Children
Document Type:
Report
Agency / Organization:
Food and Nutrition Service (FNS)
Author:
Not specified
Target Audience:
State and local agencies, including Indian Tribal Organizations and US Territories
Period of validity:
Annual
Approval Date:
Not specified
Date of changes:
Not specified
Year:
2024 – 2026 Term
Region / City:
Greenwich, Connecticut
Subject:
Board of Estimate and Taxation Operations and Policies
Document Type:
Reference Book
Organization / Institution:
Board of Estimate and Taxation, Town of Greenwich
Author:
Not specified
Target Audience:
Members of the Board of Estimate and Taxation
Period of Effect:
2024 – 2026
Approval Date:
Not specified
Date of Amendments:
Revised September 2024
Year:
Not specified
Region / City:
Not specified
Theme:
Heat pump systems, performance estimation
Document type:
Consultation response form
Organization / Institution:
MCS (Microgeneration Certification Scheme)
Author:
Not specified
Target audience:
Stakeholders involved in heat pump system performance estimation
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Year:
2025-26
Region / City:
Western Riverside County
Subject:
Biological Monitoring, Species Conservation
Document Type:
Work Plan and Cost Estimate
Agency:
Western Riverside County Regional Conservation Authority (RCA)
Author:
Unknown
Target Audience:
Environmental scientists, program administrators, conservationists
Period of Effectiveness:
FY 2025-26
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Massachusetts, Boston
Subject:
Transportation Planning, Consultant Services
Document Type:
Guideline
Organization:
Massachusetts Department of Transportation (MassDOT)
Author:
Massachusetts Department of Transportation
Target Audience:
Consultants working with MassDOT
Effective Period:
Ongoing
Approval Date:
January 2024
Revision Date:
January 2024
Note:
Contextual Description
Year:
2026
Region / City:
Washington State
Topic:
Estimation methodology and project assumptions
Document Type:
Estimation Guide
Author:
WSDOT
Target Audience:
Estimating teams, project managers, engineers
Period of Validity:
Until project completion
Approval Date:
N/A
Amendment Date:
N/A
Estimate Date:
Month and Year
Construction Start Date:
Month and Year
Estimating Processing Software:
Excel or other
Estimate available in Excel format:
Yes
Database for cost estimate:
Sources
Method of Measurement:
Field, CADD, Scaling
Scope:
Bridge, building demolition, hazardous materials, storm water regulation, noise walls
Estimate Type:
Parametric, Deterministic, Risk-Based
Project Type:
New project or upgrade
New Structures Required:
Yes
Existing Structures Modified:
Yes
Exclusions:
Local agencies’ payments for damage during detours
Risks:
Base course quantity increase, unsuitable cut material
Estimate Quality Assurance:
Reviewed and reconciled
Reconciliation:
Differences with previous estimate explained
Context:
The document outlines the basis for estimating project costs, including assumptions, exclusions, risks, and reconciliation for cost estimation procedures in Washington State projects.
Year:
2026
Location:
USC Campus, Los Angeles, California, USA
Subject:
Construction, Concrete Estimation
Document Type:
Instructional Guide / Estimate Packet
Organization:
DPR Construction
Intended Audience:
Construction estimators and self-perform work teams
Components:
Take-off instructions, unit cost selection, critical thinking exercises, optional bonus question
Referenced Materials:
Structural drawings, specifications, Concrete Estimate spreadsheets, mix design file
End Date or Period:
Preconstruction phase
Date Published:
2026
Year:
2026
Region / City:
United States
Topic:
Geothermal Energy, Low-Temperature Geothermal Systems
Document Type:
Research Paper
Organization / Institution:
National Renewable Energy Laboratory (NREL)
Author:
Michelle Mullane, Michael Gleason, Kevin McCabe, Meghan Mooney, Timothy Reber, Katherine R. Young
Target Audience:
Researchers, energy professionals, policymakers
Period of Action:
N/A
Approval Date:
N/A
Date of Modifications:
N/A
Year:
2026
Region / City:
Hamstreet
Theme:
Healthcare, Dispensary Services
Document Type:
Informational Announcement
Organization / Institution:
Hamstreet Dispensary
Author:
Hamstreet Dispensary
Target Audience:
Patients of Hamstreet Dispensary
Effective Period:
From January 2026
Approval Date:
January 2026
Modification Date:
Not specified
Year:
2018
Region / City:
North Las Vegas, NV
Topic:
Digital Signage, Audio Visual Equipment
Document Type:
Combined Solicitation/Synopsis
Agency:
Department of Veterans Affairs
Author:
Susanne Christen
Target Audience:
Contractors, Suppliers
Period of Action:
September 24, 2018 - September 27, 2018
Approval Date:
September 24, 2018
Date of Changes:
N/A
Year:
2017
Country:
United States
State:
California
Cities:
Livermore; Menlo Park
Issuing agency:
Department of Veterans Affairs
Contracting office:
Network Contracting Office 21
Program:
VISN 21 Multiple-Award Task Order Contract
Type of document:
Task Order Proposal Request
Procurement form:
Standard Form 1442
Solicitation number:
VA261-17-B-0490
Contract type:
Multiple-Award Task Order Contract
Project scope:
Fiber infrastructure upgrade
Facilities:
VA Palo Alto Health Care System
Site visit dates:
April 27, 2017; April 28, 2017
Eligible offerors:
VISN 21 MATOC contract holders
Contact person:
Contracting Officer Ferdinand Gawaran
Performance period Livermore:
20 days after notice to proceed
Performance period Menlo Park:
10 days after notice to proceed
Year:
2026
Software:
Financial Transaction Manager (FTM)
Version:
4.0.6.0_iFix5 / 4.0.7.0
Platform:
RedHat OpenShift Cluster 4.16+
Type:
Technical upgrade and rollback guide
Audience:
System administrators, DevOps engineers
Prerequisites:
Backup of database and persistent volumes, administrator permissions, available secrets and certificates
Methods:
Command Line Interface (OC-CLI), Graphical User Interface (OCP-GUI)
Components:
IBM FTM API Operator, ACE Operator, MQ, Database migration, ConfigMaps
Year:
2015
Region / City:
California
Subject:
Medical Equipment Maintenance
Document Type:
Request for Proposal
Organization / Institution:
Judicial Council of California
Author:
Not specified
Target Audience:
Medical device manufacturers
Validity Period:
From May 14, 2015, to June 10, 2015 (estimated)
Approval Date:
May 14, 2015
Amendment Date:
Not specified