№ lp_1_34891
File format: docx
Character count: 18747
File size: 99 KB
This document provides a detailed methodology for calculating individual awards within the context of a Disaster Recovery Buyout Program, specifically addressing scenarios that involve multiple housing assistance programs.
Year:
2023
Region / City:
Iowa
Topic:
Disaster Recovery Buyout Program
Document Type:
Methodology
Agency:
U.S. Department of Housing and Urban Development
Author:
Iowa Economic Development Authority
Target Audience:
CDBG-DR grantees, local governments, housing program administrators
Period of Application:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
Not specified
Region / city:
Not specified
Subject:
Chemistry, Solubility Equilibria
Document type:
Educational text
Author:
Not specified
Target audience:
Students of chemistry, possibly in higher education
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Note:
Year of report
Jurisdiction:
Florida
Regulatory framework:
Florida Administrative Code Chapter 62-210 and 62-213
Type of document:
Regulatory reporting form and instructions
Issuing authority:
Department of Environmental Protection, Division of Air Resource Management
Form number:
DEP Form No. 62-210.900(5)
Subject matter:
Air pollutant emissions reporting
Facility type:
Air pollutant emitting facilities
Applicability:
Title V sources and specified non-Title V sources
Reporting deadline:
April 1 following the reporting year
Fee coverage:
Title V source emissions fees
Certification requirement:
Owner or responsible official certification
Reporting scope:
Facility information, emissions units, emissions data, fee calculation
Year:
2025
Region / city:
GB
Theme:
Interconnector Capacity, Energy Market, Compensation Methodology
Document Type:
Call for Input
Organization:
NESO
Author:
NESO
Target Audience:
Industry stakeholders
Period of validity:
Until end of 2025
Approval Date:
August 18, 2025
Date of Amendments:
Not specified
Year:
2023
Region / City:
US
Topic:
Invoice, VAT Calculation
Document Type:
Invoice
Organization / Institution:
Contoso
Target Audience:
Businesses
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2020
Region / City:
Colorado
Theme:
Garnishment, Exempt Earnings Calculation
Document Type:
Legal Form
Organization / Institution:
Court
Author:
N/A
Target Audience:
Judgment Debtor, Garnishee
Effective Period:
Until November 1, 2020, unless extended
Approval Date:
N/A
Date of Changes:
N/A
Note:
Year
Topic:
FTE Calculation
Document Type:
Instructional Guide
Institution / Organization:
Council on Occupational Education (COE)
Target Audience:
Educational Institutions
Year:
2020
Region / City:
Addis Ababa, Ethiopia
Theme:
Consultancy Services, SAP Travel Management
Document Type:
Request for Expression of Interest
Organization / Institution:
African Union Commission
Author:
African Union Commission
Target Audience:
Consultants from African Union Member States
Period of Action:
Not specified
Approval Date:
21st July 2020
Modification Date:
Not specified
Note:
Year
Year:
2025
Region / city:
Massachusetts
Subject:
Accounting and financial calculations for affordable housing developments
Document type:
Report
Organization:
Executive Office of Housing and Livable Communities
Author:
Independent Accountant
Target audience:
Owners, Subsidizing Agency, Executive Office of Housing and Livable Communities, Town of [location]
Period of validity:
As of [Date]
Approval date:
[Date]
Date of changes:
[Date]
Year:
2022
Region / City:
Beijing, China
Topic:
Neutronics, Fusion Energy, Tritium Breeding Ratio
Document Type:
Research Paper
Organization / Institution:
CAEP Software Center for High Performance Numerical Simulation, Institute of Applied Physics and Computational Mathematics
Authors:
Xin Wang, Rui Li, Yuanguang Fu, Guiming Qin, Li Deng, Xueming Shi
Target Audience:
Researchers and Engineers in Fusion Energy
Period of Action:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Acknowledgement:
Sponsored by National MCF Energy R&D Program (No. 2022YFE03160001)
Note:
References
Li Deng, Gang Li, Bao-Yin Zhang, et al., A High Fidelity General Purpose 3-D Monte Carlo Particle Transport Program JMCT 3.0, Nuclear Science and Techniques, 33:
108 (2022)
Wang, X., Li, JL., Wu, Z. et al., CMGC:
A CAD to Monte Carlo Geometry Conversion Code, NUCL SCI TECH 31, 82 (2020)
Year:
2020
Region / City:
Oregon
Subject:
Roadway Engineering
Document Type:
Draft
Organization / Institution:
Oregon Department of Transportation
Author:
Unknown
Target Audience:
Engineering professionals
Period of validity:
Not specified
Approval Date:
3/30/2020
Modification Date:
Not specified
Context:
This document is a draft calculation book for roadway engineering design, outlining required and optional design standards and specifications for review.
Year:
2023
Region / City:
North America
Topic:
Market Settlements
Document Type:
Guide
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Market participants
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
Guide outlining the calculation methods and charge types for market settlements across day-ahead and real-time periods in energy markets.
Year:
2009
Region / City:
N/A
Topic:
Post Operations Processor calculations
Document Type:
Guide
Author:
N/A
Target Audience:
Market participants involved in settlement calculations
Effective Period:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2025
Region / city:
Southeast Europe
Topic:
Energy regulation, capacity calculation
Document type:
Explanatory note
Organization:
Agency for the Cooperation of Energy Regulators (ACER)
Author:
TSOs
Target audience:
Energy regulators, transmission system operators (TSOs), and stakeholders
Period of validity:
2025
Approval date:
May 2025
Date of changes:
N/A
Year:
1985
Region / City:
Maine
Topic:
Public employee retirement
Document Type:
Legislative chapter
Organ / Institution:
Maine Public Employees Retirement System
Author:
Maine Public Employees Retirement System
Target Audience:
Public employees of Maine
Period of Validity:
Ongoing, subject to amendments
Approval Date:
September 1, 1985
Date of Amendments:
February 24, 1987; August 11, 1987; November 4, 1989; April 17, 1990; November 9, 1991; March 18, 1992; May 30, 2010; November 4, 2019
Effective Date:
September 1, 1985
Date of Non-Substantive Corrections:
October 2, 1996
Year:
2023
Month:
January
Subject area:
Diabetes foot care
Topic:
Hospital activity and amputation indicators
Document type:
Technical document
Geographic scope:
England
Institution:
National Cardiovascular Intelligence Network
Data sources:
Hospital Episode Statistics; National Diabetes Audit; Quality and Outcomes Framework
Population:
Adults aged 18 years and over
Time period covered:
Aggregated financial years 2018/19–2020/21
Methodology:
Indicator definitions and direct age standardisation
Update history:
Methodological changes since December 2021
Intended use:
Statistical reporting and profile interpretation
Contact information:
[email protected]
Year:
2020-2022
Region/City:
Winston-Salem, NC
Theme:
Disadvantaged Business Enterprise (DBE) Program, Transportation
Document Type:
Methodology Document
Organization/Agency:
City of Winston-Salem, Winston-Salem Transit Authority, Winston-Salem Urban Area Metropolitan Planning Organization
Author:
Marlene Davis, DBE Liaison, Title VI Coordinator
Target Audience:
Local Government, Transportation Agencies, DBE Firms
Period of Validity:
FY 2020 – FY 2022
Approval Date:
August 2020
Date of Changes:
None listed
Version:
1.0
Author:
{{config.author.name}}
Author Email:
{{config.author.email}}
Date:
{{config.generation_date.name}}
Features Count:
{{design.features_count.value}}
Sample Rows Count:
{{result.train_set.sample_rows_count.value}}
Selected Algorithm:
{{result.chosen_algorithm.name}}
Backend:
{{design.backend.name}}
Project Link:
{{config.project.link}}
Output File:
{{config.output_file.name}}
DSS Version:
{{config.dss.version}}
Environment:
{{config.environment.name}}
Training Date:
{{result.training_date.name}}
Year:
2025
Region / City:
N/A
Topic:
Drinking Water Quality Assurance, Compliance Calculation
Document Type:
Methodology
Institution:
N/A
Author:
N/A
Target Audience:
Drinking water suppliers
Period of Validity:
1/07/2024 - 30/06/2025
Approval Date:
N/A
Date of Changes:
N/A
Year:
2025
Region / city:
GB
Theme:
Interconnector Capacity, Energy Market, Compensation Methodology
Document Type:
Call for Input
Organization:
NESO
Author:
NESO
Target Audience:
Industry stakeholders
Period of validity:
Until end of 2025
Approval Date:
August 18, 2025
Date of Amendments:
Not specified