№ lp_1_2_49275
File format: docx
Character count: 4711
File size: 24 KB
This document provides guidelines on the design, construction, and removal of cofferdams for construction projects in water bodies, including environmental and safety requirements for contractors.
Year:
2009
Region / City:
Victoria, Australia
Subject:
Construction of Cofferdams
Document Type:
Technical Specification
Organization / Institution:
Department of Transport
Author:
Department of Transport
Target Audience:
Contractors, Engineers, and Construction Personnel
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Jurisdiction:
Commonwealth of Kentucky
Legal Basis:
Kentucky Administrative Regulations (KAR 603 2:015 Sections 9–10); Kentucky Revised Statutes (KRS 13B.140; Chapter 13B)
Document Type:
Draft specification and administrative claims process timeline
Subject:
Construction contract claims for adjustments and disputes
Related Forms:
TC 63-32 Notice of Changed Condition/Disagreement; TC 63-33 Acknowledgement of Notice of Changed Condition/Disagreement; TC 63-34 Final Release; TC 63-44 Final Inspection and Formal Acceptance Report of Completed Construction
Responsible Parties:
Contractor; Section Engineer; Resident Engineer; Director of the Division of Construction; District T.E.B.M.; Cabinet
Procedural Deadlines:
7 days; 10 days; 30 days; 60 days; 90 days
Applicable Provisions:
Subsection 104.02; Subsection 104.03; Subsection 109.04
Dispute Resolution Mechanisms:
Administrative review; informal conference; mediation; administrative hearing; Circuit Court
Year:
2021
Region / city:
Waterloo
Topic:
Social and Environmental Sciences Research
Document type:
Course syllabus
Institution:
University of Waterloo
Instructor:
Prof. Juan Moreno-Cruz
Target audience:
Students of the course
Period of validity:
Winter 2021
Approval date:
Not specified
Modification date:
Not specified
Contextual description:
Course syllabus detailing research methods in the social and environmental sciences, including expectations, deliverables, and readings.
Year:
2026
Region / City:
West Virginia
Subject:
Property Valuation, Agriculture, Government Organization
Document Type:
Bill
Organization / Institution:
West Virginia Legislature
Author:
Senators Thorne, Rucker, and Hamilton
Target Audience:
Legislative Members, Government Officials, Public Officials
Effective Period:
2026
Approval Date:
February 6, 2026
Amendment Date:
February 6, 2026
Year:
2026
Region / City:
Massachusetts, USA
Subject:
Special Education, Student Behavior Support, School Safety
Document Type:
Regulatory Standard
Issuing Authority:
Board of Elementary and Secondary Education
Sections Included:
18.01–18.06
Last Amended:
June 2025
Effective Date:
August 17, 2026
Target Audience:
Administrators and staff of approved day and residential special education programs
Scope:
Policies and procedures for daily care, facility requirements, and behavior support, including use of restraint and separation
Legal References:
603 CMR 46.00, 102 CMR 3.00, M.G.L. c. 123, 104 CMR 27.12, 104 CMR 28.05
Year:
2026
Region / City:
Massachusetts
Theme:
Education, Special Education, Regulations
Document Type:
Regulatory Guidance
Organization:
Department of Elementary and Secondary Education
Author:
Board of Elementary and Secondary Education
Target Audience:
School Districts, Special Education Schools, Collaboratives
Period of Action:
From August 17, 2026
Date of Approval:
June 2025
Date of Amendments:
June 2025
Year:
2010
Region / City:
Strasbourg
Subject:
Human Rights
Document Type:
Judgment
Organ / Institution:
European Court of Human Rights
Author:
Lech Garlicki, Nicolas Bratza, Giovanni Bonello, Ljiljana Mijović, Päivi Hirvelä, Ledi Bianku, Nebojša Vučinić, Lawrence Early
Target Audience:
Legal professionals, Human Rights researchers
Period of Validity:
Final as of 28/06/2010
Date of Approval:
12 January 2010
Date of Changes:
28/06/2010
Note:
Year
Topic:
EIFS, Wall Systems
Document Type:
Technical Specification
Organization / Institution:
Sika Corporation US
Target Audience:
Design professionals, architects, engineers
Description:
A technical specification for the Channeled Adhesive CI Design Wall System with MaxGrip Veneer Adhesive, outlining design, installation, and material requirements.
Year:
2023
Region / City:
USA
Topic:
Wall Systems
Document Type:
Specification
Organization / Institution:
Sika Corporation US
Author:
Sika
Target Audience:
Designers, Engineers, Contractors
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / City:
United States
Theme:
Construction, Masonry Surfacing, Building Materials
Document Type:
Specification
Organization / Institution:
Sika Corporation US
Author:
Sika Corporation
Target Audience:
Designers, Architects, Contractors
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
Technical specification for the installation and design of the Senergy Adhered Veneer Surfacing system on concrete and masonry units, providing detailed guidelines for substrates, system joints, and technical performance standards.
Year:
2026
Type of Document:
Technical Specification
Subject:
High-efficiency gas domestic water heaters
Standards Compliance:
ASME Section IV (HLW), DOE 10 CFR Part 431, UL 795, ANSI/NSF 372
Manufacturer:
AERCO International, Inc.
Warranty:
10-year limited warranty for pressure vessel and heat exchanger, 2-year control panel, 18-month other components
Target Audience:
Architects, Engineers, Contractors
Submission Requirements:
Product data, shop drawings, test reports, operation and maintenance data, ASME certification
Installation:
Concrete base coordination, flue vent sizing, piping configuration
Performance Parameters:
Input/output capacity, GPH/GPM, turndown ratio, NOx emissions, internal storage limits, temperature setpoints
Year:
2021
Region / City:
Queensland
Theme:
Retirement Villages
Document Type:
Prospective Costs Document
Organization:
Retirement Village Operators
Author:
Not specified
Target Audience:
Prospective Residents
Period of Action:
From April 2021
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2005
Region / City:
Strasbourg
Theme:
Human rights, property law
Document type:
Court ruling
Authority:
European Court of Human Rights
Author:
European Court of Human Rights
Target audience:
Legal professionals, scholars
Period of validity:
N/A
Date of adoption:
15 November 2005
Date of revision:
30 August 2007
Year:
Not specified
Region / city:
Not specified
Topic:
Zoning laws, land use regulations
Document type:
Legal text
Authority:
Not specified
Author:
Not specified
Target audience:
Legal professionals, urban planners, municipal authorities
Effective period:
Not specified
Date of approval:
Not specified
Date of amendments:
Not specified
Context description:
This legal text outlines specific conditions and exceptions under zoning ordinances related to existing structures, uses, and permits in the context of subdivision planning and amendments.
Document type:
Construction specification
Specification section:
235216
Subject:
Gas-fired fire-tube condensing boilers
Fuel type:
Natural gas, propane, dual fuel
Capacity range:
0.75–6.0 MMBTU/hr
Manufacturer basis of design:
AERCO International Inc.
Product series:
Benchmark Boiler Series
Control system:
Edge [ii] control
Applicable standards:
ASME Boiler and Pressure Vessel Code Section IV; NFPA 70; UL 795; AHRI; ASHRAE/IESNA 90.1; DOE 10 CFR 430 Appendix N
NOx emission limits:
9 ppm or 20 ppm corrected to 3% O₂ depending on model
Warranty terms:
Pressure vessel lifetime and limited component warranties
Intended application:
Hydronic hot water heating systems
Year:
2021
Region / city:
United States
Subject:
Toxic Substance Control Act, Test Order
Document Type:
Regulatory Document
Organization / institution:
Environmental Protection Agency (EPA)
Author:
Environmental Protection Agency
Target Audience:
Manufacturers, processors, and related stakeholders
Period of validity:
Ongoing
Approval Date:
December 2020
Modification Date:
Not specified
This document outlines the requirements and procedures for issuing a Test Order under the Toxic Substance Control Act (TSCA) Section 4, specifically targeting 6:
2 fluorotelomer sulfonamide betaine for manufacturers and processors in the U.S.
Year:
2023
Region / City:
Jurupa Valley, California
Topic:
Economic development subsidies, transient occupancy tax, development agreements
Document Type:
Statement of information
Organization / Institution:
City of Jurupa Valley
Author:
Not specified
Target Audience:
General public, stakeholders involved in the development project
Period of Validity:
2023-2043
Approval Date:
September 7, 2023
Amendment Date:
Not specified
Contextual Description:
A statement detailing the economic development subsidies for the proposed development agreement related to the District at Jurupa Valley, including information on public funding, job creation, and tax revenue projections.