№ lp_1_2_09376
File format: docx
Character count: 7116
File size: 744 KB
This document provides technical specifications and details about the Hi Delta® - Type WH Water Heaters, including various models and performance characteristics.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Type of Document:
Technical Specification
Subject:
High-efficiency gas domestic water heaters
Standards Compliance:
ASME Section IV (HLW), DOE 10 CFR Part 431, UL 795, ANSI/NSF 372
Manufacturer:
AERCO International, Inc.
Warranty:
10-year limited warranty for pressure vessel and heat exchanger, 2-year control panel, 18-month other components
Target Audience:
Architects, Engineers, Contractors
Submission Requirements:
Product data, shop drawings, test reports, operation and maintenance data, ASME certification
Installation:
Concrete base coordination, flue vent sizing, piping configuration
Performance Parameters:
Input/output capacity, GPH/GPM, turndown ratio, NOx emissions, internal storage limits, temperature setpoints
Note:
Year
Theme:
Gas control systems for fire pits, grills, and heaters
Document Type:
Technical specification
Organization / Institution:
ISIMET
Target Audience:
Engineers, contractors, and safety professionals in the gas and heating systems industry
Note:
KW
Organization / Institution:
INDEECO
Target Audience:
Engineers, architects, and technical specialists
Year:
2014
Region / city:
Austria
Topic:
Electric Water Heaters
Document Type:
Specification
Organization / institution:
ECOTHERM
Author:
Not specified
Target audience:
Not specified
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2012
Region / City:
Austria
Topic:
Electrical Appliances
Document Type:
Technical Specification
Organization / Institution:
ECOTHERM
Author:
Not specified
Target Audience:
Professionals in construction and electrical engineering
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2009
Region / City:
Not specified
Subject:
Gas-fired unit heaters
Document Type:
Technical Specification
Agency / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, engineers
Validity Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014
Region / City:
Austria
Topic:
Electric water heaters and related accessories
Document type:
Technical specification
Organization / Institution:
ECOTHERM
Author:
Not specified
Target audience:
Professionals in construction and plumbing industries
Effective period:
Ongoing
Approval date:
Not specified
Date of changes:
Not specified
Year:
Not specified
Region / City:
Fayetteville, Arkansas
Country:
United States
Organization:
Veterans Health Care System of the Ozarks (VHSO)
Document Type:
Statement of Work (SOW)
Project Identifier:
564-20-516
Subject:
Replacement and installation of domestic hot water heaters
Equipment Brand:
Patterson Kelley (PK)
Facilities Affected:
Mechanical 1127-02; Mechanical PC 105; Mechanical PC 043; Mechanical Steam L220A-21
Scope:
Demolition of existing heaters, installation of new PK Compact Water Heaters, piping modifications, insulation, BACnet integration, and system testing
Contractor Responsibilities:
Provide management, supervision, labor, equipment, tools, supplies, parts, and related services
Safety Requirement:
Safety designated as the contractor’s highest priority
Information Technology Security:
Certification and Accreditation requirements not applicable
Automation System Integration:
BACnet communication connected to existing building automation system with graphical displays
Testing and Commissioning:
Final operational testing demonstrated to COR and VA Engineering staff
Period of Performance:
75 calendar days
Work Coordination:
Job site work and utility outages coordinated with Contracting Officer’s Representative (COR)
Operating Conditions:
Work outside normal hours performed by contractor without additional government cost
Year:
2019
Region / City:
Des Moines, IA
Subject:
Construction and Replacement of Water Heaters
Document Type:
Government Solicitation / Contract Offer
Issuing Agency:
Department of Veterans Affairs, Network 23 Contracting Office
Project Number:
636A6-19-312
NAICS Code:
236220
Business Set-Aside:
Service Disabled Veteran Owned Small Business (SDVOSB)
Estimated Contract Value:
$100,000–$250,000
Site Visit Date:
July 10, 2019
Bid Submission Deadline:
August 1, 2019, 01:00 PM CT
Point of Contact:
Christopher Wynn, [email protected]
Performance Period:
Start and completion dates to be specified in award notice
Year:
2020
Location:
Building 927, CERN
Subject:
Electrical insulation testing of quench heaters
Document type:
Test report
Prepared by:
Jaromir Ludwin, Mateusz Bednarek, Friedrich Lackner, Francois-Olivier Pincot, Roberto Lopez
Reviewed by:
TBD
Approved by:
TBD
Recipients:
[List of persons to whom the document is sent]
Tested equipment:
MBHDP201 magnet, quench heaters YT210OL and YT211OR
Target voltage:
20 kV
Fault identification:
YT210OL, YT211OR
Test setup:
High-voltage power supply, Megger insulation tester
Breakdown voltages:
11.2 kV, 11.965 kV
Coil grounding:
Verified
Revision history:
Initial version 2020-09-04
Year:
2023
Note:
Region / City
Theme:
Plastics industry, Heating technology
Document type:
Product description
Organization:
HASCO
Target audience:
Industrial professionals, Plastics manufacturers
Year:
2017
Catalog Number:
3500.97B
Division:
23 52 33.13
Type of Document:
Technical specification
Manufacturer:
Raypak, Inc.
Location:
Oxnard, CA, USA
Product:
Delta Limited® copper finned-tube water heaters
Standards and Certifications:
ANSI Z21.10.3/CSA 4.3, ASME Section IV, ISO 9001, ASME HLW Stamp, National Board Listed
Warranty:
Five-year limited, ten-year Cupro-nickel heat exchanger, twenty-year thermal shock
Energy Performance:
Minimum 83.1% thermal efficiency
Fuel Type:
Gas-fired
Controls:
Safety shutdown system, Hot Surface Ignition, LED diagnostics
Piping and Installation Requirements:
Compatible with left or right hand plumbing and electrical configuration
Target Audience:
Building engineers, contractors, and specifiers
Year:
1981
Agency:
Federal Aviation Administration, Department of Transportation
Document Type:
Airworthiness Directive
Applicable Models:
STEWART-WARNER Combustion Heaters Series 8240, 8253, 8259, 8472
Regulation:
14 CFR Part 39, Amendment 39-4102
Effective Date:
May 8, 1981
Required Actions:
Inspection every 250 hours; overhaul every 1000 hours
Scope:
Aircraft certified in all categories
Compliance:
Mandatory
Year:
1960s
Company Type:
Family-owned
Location:
Oklahoma City, OK, USA
Industry:
Manufacturing / Industrial Heating Equipment
Product Type:
Indirect Fired Heaters, Water Bath Heaters, Salt Bath Heaters
Thermal Efficiency:
70–85%
Capacity Range:
50M–30MM BTU/Hr
Application:
Oil and Gas Field Heating, Industrial Process Heating
Contact:
[email protected]
Facility:
9000 S. Sunnylane Road, Oklahoma City, OK 73165
Phone:
(405) 677-6676
Fax:
(405) 670-3270
Year:
2009
Region / City:
Chapel Hill, North Carolina
Topic:
Fraternity Policies and Conduct
Document Type:
Code of Conduct
Organization / Institution:
Delta Kappa Epsilon
Author:
Delta Kappa Epsilon
Target Audience:
Members of Delta Kappa Epsilon
Effective Period:
Ongoing
Approval Date:
October 27, 2009
Date of Last Review:
Annual
Date of Amendments:
Reviewed annually by DKE Judicial Board
Year:
2025
Region / City:
Vinton, LA
Theme:
Beef Quality Assurance Awards
Document Type:
Award Nomination Guidelines
Target Audience:
Cattle producers, Beef Quality Assurance program participants
Effective Period:
October 1, 2024 – January 5, 2025
Approval Date:
N/A
Amendment Date:
N/A
Context:
Document outlining the nomination and selection process for the 2025 Louisiana Beef Quality Assurance (BQA) Awards, detailing application requirements and criteria for judging nominees in the beef industry.
Year:
2009
Region / City:
University of North Carolina at Chapel Hill
Theme:
Code of Conduct, Academic Standards, Fraternity Guidelines
Document Type:
Bylaws
Organization / Institution:
Delta Kappa Epsilon (Beta Chapter)
Author:
Delta Kappa Epsilon (Beta Chapter)
Target Audience:
Active members, alumni, parents, friends, and guests of Delta Kappa Epsilon
Period of validity:
Indefinite
Approval Date:
October 27, 2009
Revision Date:
Annually reviewed
Year:
2025
Region / city:
Can Tho City, Viet Nam
Field:
Climate Resilience, Environmental Protection, Water Management
Document Type:
Internship Opportunity
Organization:
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Target Audience:
Students and graduates in natural science, climate and environment, and related fields
Duration:
6 months
Approval Date:
Not specified
Change Date:
Not specified
Note:
Year
Subject:
Leadership, Membership, Student Affairs
Document Type:
Guidelines
Organization:
Omicron Delta Kappa National Leadership Honor Society
Target Audience:
Undergraduate juniors and seniors, graduate students, faculty, alumni
Context Description:
Application guidelines for Omicron Delta Kappa National Leadership Honor Society detailing the required leadership achievements across various campus life phases.
Year:
2017
Region / City:
Texas
Subject:
Health Preprofessional Honor Society
Document Type:
Bylaws
Organization:
Alpha Epsilon Delta
Author:
Not specified
Target Audience:
Students and faculty of the chapter
Period of validity:
Indefinite
Approval Date:
10/8/2017
Date of Changes:
Not specified