№ lp_2_3_20560
File format: docx
Character count: 63756
File size: 4536 KB
Year:
2023
Region / city:
Ha Noi, Viet Nam
Subject:
Wireless Power Transmission
Document type:
Report
Organization:
APT Wireless Group (AWG)
Author:
APT Wireless Group (AWG)
Target audience:
APT member countries, industry professionals, regulatory bodies
Period of validity:
Not specified
Approval date:
May 2023
Date of changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
N/A
Topic:
Wireless Power Transfer, Energy Control
Document Type:
Proposed Draft Text
Organization / Institution:
IEEE
Author:
Ian Bajaj, Yinan Qi, Sanket Kalamkar
Target Audience:
IEEE 802.11 Task Group members
Period of Validity:
N/A
Approval Date:
2025-07-28
Revision Date:
N/A
Edition:
February 2016
Report Number:
APT/AWG/REP-62(Rev.1)
Adopted by:
19th Meeting of APT Wireless Group
Meeting Date:
2–5 February 2016
Meeting Location:
Chiang Mai, Thailand
Source:
AWG-19/OUT-15
Organization:
Asia Pacific Telecommunity (APT)
Working Group:
APT Wireless Group (AWG)
Task Group:
Task Group on Wireless Power Transmission (TG-WPT)
Related Body:
ITU-R SG1 WP 1A
Subject:
Wireless Power Transmission (WPT)
Scope:
Technologies, terminology, standardization, frequency bands, regulatory issues, and co-existence studies
Geographical Coverage:
APT member countries
Referenced Report:
Report ITU-R SM.2303-0
Document Type:
Technical report
Year:
2023
Region / City:
Europe
Topic:
Maritime Mobile Service, WPT, Radio Regulations
Document Type:
Liaison Statement
Organization:
ETSI
Author:
Holger Butscheidt
Target Audience:
CEPT/ECC-WGFM, CEPT/ECC-WGSE, TGMARINE members, ETSI Technical Officers
Period of validity:
Not applicable
Approval Date:
31/03/2023
Date of changes:
Not applicable
Year:
2022
Event:
3GPP TSG RAN WG1 #108-e e-Meeting
Date:
February 21 – March 3, 2022
Source:
Moderator (CATT)
Title:
Moderator summary #1 on enhancements of beam management for multi-TRP
Agenda Item:
8.1.2.3
Document Type:
Discussion and Decision
Participants:
Qualcomm, LGE, CMCC, Xiaomi, Lenovo, Motorola Mobility, Intel, TCL, Sony, OPPO, Apple, ZTE, Samsung, MTK, vivo, Spreadtrum, CATTA, FutureWei
Topics Covered:
Beam measurement/reporting, L1-SINR reporting, CSI-RS configuration, TRP-specific BFR, M-TRP beam failure recovery
Standards Referenced:
3GPP 38.214
Document Scope:
Issues and proposals on enhancements for beam management in multi-TRP scenarios
Year:
2023
Region / City:
Australia
Topic:
Road Safety
Document Type:
Technical Specification
Organization / Institution:
Department of Transport and Planning
Author:
Department of Transport and Planning
Target Audience:
Contractors, Engineers, Manufacturers
Period of Validity:
Not specified
Approval Date:
24 July 2023
Date of Last Revision:
Not specified
Confidentiality Level:
PU - Public
Document Status:
Document Released
Document Type:
Specification (Requirements Specification Document)
Product Category:
RSD Product Category B
Facility:
ELI Beamlines
Location:
Experimental Hall E1
Tender Code:
TP25_039
OBS Code:
88
Document Branch:
Engineering & Scientific Documents
Authors:
Mateusz Rebarz; Aleksei Kuzmenko
Prepared By:
Mateusz Rebarz
System Engineer:
Aleksei Kuzmenko
Reviewed By:
Birgit Plötzeneder; Jakob Andreasson; Lucie Kaletusová; Ondrej Hort; Radek Toman; Veronika Olšovcová; Viktor Fedosov; Vojtěch Gaman
Approved By:
Jakob Andreasson
Date of Creation:
18 June 2025
Date of Last Modification:
27 June 2025
Keywords:
Steering mirror mounts; beam position detectors; closed-loop controller
Scope:
Functional, performance, design, delivery, safety, and quality requirements for an in-vacuum laser beam stabilisation system
System Components:
Piezo-actuated steering mirror mounts; real-time beam position detectors; beam stabilisation controller
Verification and Acceptance:
Factory Acceptance Test and on-site verification at ELI Beamlines
Year:
2023
Region / City:
Chicago, USA
Theme:
AI/ML for beam management
Document Type:
Discussion and Decision
Organization:
3GPP TSG RAN WG1
Author:
Samsung
Target Audience:
Industry professionals and companies in wireless communication technology
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2022
Edition:
September 2022
Document number:
APT/AWG/REP-122
Type of document:
Survey report
Subject:
Radio frequency beam wireless power transmission
Technology area:
Wireless power transmission
Organization:
Asia-Pacific Telecommunity
Working group:
APT Wireless Group
Adopting body:
30th Meeting of APT Wireless Group
Adoption date:
September 2022
Meeting location:
Bangkok, Thailand
Geographical scope:
Asia-Pacific region
Source document:
AWG-30/OUT-03
Related organizations:
ITU-R, IEC TC 100, CISPR
Frequency bands discussed:
920 MHz, 2.4 GHz, 5.7 GHz, 24 GHz, 61 GHz
Participating administrations:
Iran, Myanmar, Japan, Indonesia, China, Cambodia, Thailand, Korea
Survey basis:
Questionnaire responses from APT members
Survey focus:
Market demand, commercialization status, regulatory status, frequency allocation, compatibility with radiocommunication services
Year:
2021
Region / city:
Global
Topic:
Beam Management
Document Type:
Meeting Contribution
Organization:
3GPP
Author:
Moderator (InterDigital, Inc.)
Target Audience:
Participants of the 3GPP RAN WG1 meeting
Period of validity:
Not specified
Approval Date:
Not specified
Date of amendments:
Not specified
Year:
2023
Region / City:
USA
Subject:
Beam Time Request, NASA, Space Radiation Program
Document Type:
Policy Guidelines
Institution:
NASA, Brookhaven National Laboratory
Author:
NASA Space Radiation Program
Target Audience:
Principal Investigators, Researchers, Laboratory Personnel
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Authors:
Kasra Rouhi; Hamid Rajabalipanah; Ali Abdolali
Affiliations:
School of Electrical Engineering, Iran University of Science and Technology, Tehran, Iran; Applied Electromagnetic Laboratory, School of Electrical Engineering, Iran University of Science and Technology, Tehran, Iran
Corresponding author:
Ali Abdolali
Email:
[email protected]
Institution:
Iran University of Science and Technology
Laboratory:
Applied Electromagnetic Laboratory
Subject area:
Graphene-based metasurfaces; Terahertz wave-front shaping; Orbital angular momentum beams
Document type:
Supplementary information
Components:
External biasing circuit; EM coupling analysis; Circuit model of binary meta-atoms; IFFT-based far-field analysis; Phase gradient MGBM examples; Focused OAM beam generation; Reflection phase maps and chemical potential distributions; Effects of biasing lines
Materials:
Graphene; Al2O3; polysilicon; Au/Cr contacts
Frequency range:
Terahertz (THz)
Device type:
Multi-bit graphene-based bias-encoded metasurface (MGBM)
Control method:
DC gate voltages (Vg1, Vg2); FPGA-based programming
Physical mechanisms:
Fowler–Nordheim tunneling; Field effect in graphene; Electron scattering and relaxation mechanisms
Year:
2024
Region / City:
Guangzhou, Guangdong Province, China
Topic:
Hepatocellular carcinoma, postoperative radiation therapy
Document Type:
Research article
Organization / Institution:
The Third Affiliated Hospital of Sun Yat-sen University, Qilu Hospital, Shandong University, The First Affiliated Hospital, Guangzhou Medical University
Authors:
Gao-Yuan Yang, Zhi-Wei He, Yong-Chang Tang, Feng Yuan, Ming-Bo Cao, Yu-Peng Ren, Yu-Xuan Li, Xiao-Rui Su, Zhi-Cheng Yao, Mei-Hai Deng
Target Audience:
Medical researchers, clinicians specializing in oncology and hepatobiliary surgery
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Revision:
December 9, 2023
Date of Acceptance:
January 9, 2024
Funding:
The Science and Technology Plan Project of Guangzhou, National Natural Science Foundation Cultivation Project of The Third Affiliated Hospital of Sun Yat-sen University, Natural Science Foundation of Guangdong Province, CSCO-Roche Joint Cancer Research Fund
Year:
2026
Region / City:
Not specified
Theme:
Lighting and electrical installations
Document type:
Technical specification
Organization:
Not specified
Author:
Not specified
Target audience:
Electricians, contractors, and designers
Validity period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Note:
Context description
Manufacturer:
Maxxit
Website:
www.maxxitgroup.com
Product Name:
Tignum
Section Number:
09 54 26
Section Title:
Specialty Wood Ceilings
Division:
Division 9 – Finishes
Document Type:
Technical Specification
Product Type:
Wood Baffle and Beam Ceiling and Wall System
Standards Referenced:
ASTM A641; ASTM C423; ASTM C635; ASTM C636; ASTM E84; ASTM E580; ASTM E795; CAN/ULC-S102; AWI Architectural Woodwork Quality Standards; CISCA Ceiling Systems Handbook; CISCA Wood Ceilings Technical Guidelines
Warranty:
One-year limited warranty from date of installation
Installation Requirements:
Compliance with CISCA recommendations, manufacturer’s written instructions, approved shop drawings, and local building codes
Environmental Conditions:
Installation between 50°F (10°C) and 86°F (30°C); relative humidity between 25% and 55%; interior applications only
Submittals Required:
Product data; material samples; shop drawings; reflected ceiling plans; perimeter conditions
Extra Materials:
2.0 percent additional full-size wood baffles and suspension components
Year:
2025–2030
Region / City:
Marlborough, Worcester County, Massachusetts
Organization:
UMass Memorial Health (UMMH)
Facility:
Proton Therapy Center at Marlborough
Document Type:
Application Response / Capacity and Policy Explanation
Subject:
Proton Beam Unit Capacity and Coverage with Evidence Development (CED) Paradigm
Operational Hours:
14 hours per day, Monday through Friday
Days of Operation per Year:
250
Projected Daily Capacity:
30 treatments
Projected Monthly Capacity:
600 treatments
Projected Annual Capacity:
7,200 treatments
Average Treatment Time per Patient:
30 minutes (Year 1); 25 minutes (Years 2–3)
Estimated Annual Radiation Treatments:
4,320 (Year 1); 7,200 (Years 2–3)
Estimated Patient Volume (New Starts):
180 (Year 1); 300 (Years 2–3)
Average Treatments per Patient:
24
Total Estimated Treatment Minutes:
129,600 (Year 1); 180,000 (Years 2–3)
Policy Framework:
ASTRO Model Policy and Medicare Local Coverage Determination (LCD) L35075
Coverage Model:
Coverage with Evidence Development (CED)
Clinical Trial Participation:
Participation in IRB-approved clinical trials and multi-institutional registries; planned investigator-initiated trials
Payor Mix:
54.9% Medicare (projected)
Coverage Groups:
Group 1 (medically necessary indications); Group 2 (CED-qualified indications)
Year:
2023
Region / City:
Global
Theme:
User Manual, LED lighting
Document Type:
Technical Documentation
Organization:
MARK PRO
Author:
MARK PRO
Target Audience:
Professional users
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A