№ lp_1_2_34523
File format: docx
Character count: 4278
File size: 110 KB
Guidance and procedural reference for preparing and submitting Multi-Site Design Documents for GHG projects under the ACR Standard.
Year:
2023
Document Type:
GHG Project Plan Appendix
Organization:
American Carbon Registry (ACR)
Version:
1.1
Date Published:
2023-12-01
Scope:
Multi-Site GHG Projects
Project Approach:
Aggregated or Programmatic Development Approach (PDA)
Validation Status:
Subject to validation and public disclosure
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Note:
Region / City
Topic:
Data and Safety Monitoring, Clinical Trials, Study Reporting
Document Type:
Instruction Sheet, Report Template
Organization / Institution:
NIAMS
Target Audience:
Investigators, Study Team Members, Data Managers, Study Statisticians, Monitoring Body
Contextual Description:
Instruction sheet for preparing data and safety monitoring reports for multi-site clinical studies.
Year:
2020
Note:
Region / City
Topic:
Clinical Research
Document Type:
Guideline
Organization / Institution:
National Institute of Arthritis and Musculoskeletal and Skin Diseases
Target Audience:
Researchers, Clinical Trial Coordinators, Investigators
Form number:
CER-NGER-015
Version:
1.0
Date of issue:
7 January 2025
Jurisdiction:
Australia
Regulatory framework:
National Greenhouse and Energy Reporting Regulations 2008
Scheme:
National Greenhouse and Energy Reporting Scheme
Related mechanism:
Safeguard Mechanism
Type of document:
Regulatory nomination form
Issuing authority:
Clean Energy Regulator
Subject matter:
Nomination of multi-site cement production facilities
Eligible activities:
Cement production attributable to Portland cement clinker
Reporting period applicability:
Activities conducted on or after 1 July 2023
Approval deadline:
30 June of the relevant financial year
Submission methods:
Post and email
Target entities:
Operators of multi-site cement production businesses
Administrative purpose:
Facility nomination and variation of existing nominations
Year:
2023
Document type:
Pre-audit checklist
Program:
Chain of Custody certification
Standard referenced:
MSC Chain of Custody Standard: Default Version
Related standard:
ASC Chain of Custody Standard
Issuing organization:
Marine Stewardship Council
Copyright holder:
Marine Stewardship Council
Version:
2.1
Official language:
English
Intended users:
Single-site and multi-site organisations handling certified seafood
Certification scope:
MSC and ASC certified seafood products
Content focus:
Purchasing, identification, segregation, labelling, and promotion of certified products
Status:
Guidance document
Publication source:
MSC website
Year:
2020
Note:
Region / City
Topic:
Clinical Trials, Closeout Procedures
Document Type:
Procedure Guidelines
Organization / Institution:
NIAMS
Target Audience:
Researchers, Clinical Trial Coordinators, IRB Members, Study Site Personnel
Document type:
Administrative form
Subject area:
Human subjects research oversight
Regulatory context:
Institutional Review Board reliance and authorization
Applicable research type:
Collaborative multi-site research involving human subjects
Institution:
Campbell University
Responsible office:
Campbell IRB Office
Jurisdiction:
United States
Intended use:
Notification and coordination of IRB oversight
Related process:
IRB application and reliance agreement determination
Form status:
Not an IRB application
Source type:
Institutional administrative record
Year:
2017
Region / City:
United States
Topic:
Clinical Research, Multi-Site Clinical Trials
Document Type:
Manual, Guidelines
Organization / Institution:
National Institute of Arthritis and Musculoskeletal and Skin Diseases (NIAMS)
Author:
NIAMS
Target Audience:
Researchers, Clinical Trial Coordinators
Period of Action:
October 2017 and onwards
Approval Date:
October 2017
Date of Modifications:
Not specified
Year:
Not specified
Region / City:
United States
Topic:
Medical research protocols, ethics
Document type:
Protocol Addendum
Institution:
United States Army Medical Research and Development Command (USAMRDC)
Author:
Not specified
Target audience:
Research institutions, ethics committees
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Date:
March 31, 2025
Place:
Zurich, Switzerland
Company:
ABB Ltd
Division:
Smart Buildings Division, Energy Distribution Business Line
Product:
ABB Ability™ InSite Energy Pro
Platform Type:
Cloud-based energy management platform
Technology Partner:
AWS
Related Standard:
ISO 50001
Event:
Hannover Fair (March 31 – April 4, Hall 15, Stand D76)
Industry Sector:
Energy management and electrification
Target Audience:
Building owners, developers, energy managers of multi-dwellings and mid-sized commercial properties
Contact:
[email protected]
Address:
Affolternstrasse 44, 8050 Zurich, Switzerland
Year:
2026
Region / City:
Not specified
Subject:
Research Study Coordination and IRB Communication
Document Type:
Template / Protocol Guide
Institution:
Multiple participating institutions
Authors:
Not specified
Target Audience:
Research study teams, IRB personnel
Effective Period:
Duration of the study
Key Roles:
Reviewing IRB POC, Lead Study Team Representative, Relying Site POC, Relying Site Study Team Representative
Responsibilities:
Conflict of Interest management, study team training, local considerations, IRB application and review, consent form management, continuing review, reportable events, closure reports
Communication Channels:
Email, institutional portals, direct contact
Year:
Not specified
Region / City:
Not specified
Subject:
Human Research Protection, Institutional Review Board
Document Type:
Procedure
Organization / Institution:
Rutgers University
Author:
Not specified
Target Audience:
Principal Investigators, IRB Administrators, Reliance Administrators, External Institution Research Teams
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2025
Institution:
West Virginia University
Document type:
Investigator Manual
Scope:
Participating Site (pSite) responsibilities for Human Research under a single IRB
Audience:
Research investigators and study staff
Regulatory framework:
Federal human research protections and local institutional policies
Required training:
Human research protections training for all study personnel
Submission system:
WRAP SmartForms
Approvals:
sIRB approval and local institutional approvals
Responsible party:
Lead study team and pSite investigator
Key procedures:
Consent documentation, ongoing reporting, site-specific study management
Note:
Year
Note:
Year
Topic:
EIFS, Wall Systems
Document Type:
Technical Specification
Organization / Institution:
Sika Corporation US
Target Audience:
Design professionals, architects, engineers
Description:
A technical specification for the Channeled Adhesive CI Design Wall System with MaxGrip Veneer Adhesive, outlining design, installation, and material requirements.
Document type:
Technical approval schedule
Appendix:
Appendix A
Subject area:
Structural design standards
Infrastructure type:
Highway bridges and structures
Standards framework:
Eurocodes and UK National Annexes
Jurisdiction:
United Kingdom
Responsible role:
Designer
Referenced standards bodies:
British Standards Institution, CEN
Applicable disciplines:
Structural engineering
Scope of documents:
Basis of design, actions on structures, concrete structures, steel structures
Revision status:
Revisions current as of 23 July 2024
Validity period:
Various standards valid until 30 March 2028
Superseding standards:
Referenced where applicable
Associated guidance:
CD 350
Year:
2021
Region / City:
United States
Topic:
Educational Assessment
Document Type:
Guide
Organization:
George Mason University Training and Technical Assistance Center (GMU TTAC)
Author:
Ratzlaff, J., Sekinger, M., Martin, C.
Target Audience:
Educators, Stakeholders in IEP process
Period of Validity:
Ongoing
Approval Date:
2021
Date of Modifications:
Not specified
Note:
Year
Region / City:
Redmond
Topic:
Urban design standards, building design, compliance checklist
Document type:
Checklist
Organization / Institution:
City of Redmond
Target audience:
Applicants, Planning Staff
Year:
2024
Region / City:
Not specified
Topic:
User interface design specifications
Document Type:
Design Specification
Organization / Institution:
UXG
Author:
Not specified
Target Audience:
SSA developers, analysts, validation staff, project team members
Period of Validity:
Not specified
Approval Date:
1/12/2024
Modification Date:
3/29/2024
Year:
2018
Jurisdiction:
Australia
Document Type:
Vehicle Standard
Governing Body:
Department of Infrastructure, Regional Development and Cities
Author:
Andrew Broad, Assistant Minister to the Deputy Prime Minister
Legal Basis:
Motor Vehicle Standards Act 1989
Effective Date:
7 December 2018
Applicability:
Category LEP, LEG, M and N vehicles from 1 July 2019 for new models
Amendments:
Alternative standards recognized under UN Regulation No. 14 and ISOFIX systems
Sections:
Legislative Provisions, Function, Applicability, Definitions, Requirements, Exemptions and Alternative Procedures, Alternative Standards, Appendix A
Year:
2010
Region / City:
Washington, DC
Theme:
Patient Safety, Healthcare Facilities
Document Type:
Directive
Institution:
Veterans Health Administration
Author:
Department of Veterans Affairs
Target Audience:
Healthcare professionals, facility administrators
Period of Action:
2010-2014
Approval Date:
June 28, 2010
Amendment Date:
Not specified