№ files_lp_3_process_7_081929
File format: docx
Character count: 13106
File size: 29 KB
This document provides a checklist for inspecting gas furnaces, including thermostat checks, furnace location and accessibility, venting requirements, and safety barriers.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2017
Region / City:
Madison, Wisconsin
Topic:
Procurement
Document Type:
Request for Bid
Institution:
University of Wisconsin - Madison
Author:
Purchasing Services
Target Audience:
Vendors
Effective Period:
From 03/27/17 to 04/10/17
Approval Date:
03/27/17
Modification Date:
None
Bid Number:
17-0064
Bid Submission Deadline:
04/10/17, 2:00 PM CDT
Award Notification:
Post-bid evaluation
Description:
Request for bids for the supply of a water-cooled horizontal tube furnace, detailing the terms, conditions, and instructions for submission, including bidder qualifications and performance requirements.
Year:
2025
Region / City:
Cowden
Topic:
Planning Application
Document Type:
Planning Application
Institution:
Wealden District Council
Author:
Wealden District Council
Target Audience:
General Public
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / City:
Japan
Subject:
Ironmaking technology
Document Type:
Technical description
Institution:
Museum / Takadono workshop
Author:
Not specified
Target Audience:
Visitors, researchers
Construction Depth:
3–5 meters
Materials:
Stone, charcoal, ash
Maintenance:
Occasional, semi-permanent structure
Year:
2026
Region / City:
Georgia
Topic:
Natural Gas Competition, Deregulation, Regulatory Affairs
Document Type:
Data Request
Organization / Institution:
Georgia Public Service Commission
Author:
Georgia Public Service Commission Staff
Target Audience:
Regulatory Affairs Counsel, Energy Companies
Period of Validity:
July 1, 2025 - September 30, 2025
Approval Date:
N/A
Date of Modifications:
N/A
Year:
2026
Type of Document:
Technical Specification
Subject:
High-efficiency gas domestic water heaters
Standards Compliance:
ASME Section IV (HLW), DOE 10 CFR Part 431, UL 795, ANSI/NSF 372
Manufacturer:
AERCO International, Inc.
Warranty:
10-year limited warranty for pressure vessel and heat exchanger, 2-year control panel, 18-month other components
Target Audience:
Architects, Engineers, Contractors
Submission Requirements:
Product data, shop drawings, test reports, operation and maintenance data, ASME certification
Installation:
Concrete base coordination, flue vent sizing, piping configuration
Performance Parameters:
Input/output capacity, GPH/GPM, turndown ratio, NOx emissions, internal storage limits, temperature setpoints
Year:
2024
Region / City:
Gainesville, GA
Topic:
Gas Supply Plan
Document Type:
Data Requests
Agency / Institution:
Georgia Public Service Commission
Author:
Staff of the Georgia Public Service Commission
Target Audience:
Liberty Utilities (Peach State Natural Gas)
Effective Period:
2024-2025
Approval Date:
N/A
Amendment Date:
N/A
Year:
2018
Region / City:
Hong Kong, Singapore, Vietnam
Topic:
LNG Procurement, Risk Management
Document Type:
Report
Organization:
The World Bank, The Lantau Group
Author:
The Lantau Group
Target Audience:
Government, Industry Stakeholders, Energy Sector Professionals
Period of validity:
N/A
Approval Date:
15 December 2018
Date of modifications:
N/A
Year:
2025
Region / City:
Georgia, USA
Type of document:
Data Request / Regulatory Filing
Issuing authority:
Georgia Public Service Commission
Recipient:
Walton EMC
Subject:
Residential natural gas rates and customer service charges
Period covered:
July 1, 2025 – September 30, 2025
Deadline for response:
February 13, 2026
Filing format:
Electronic submission in Word and Excel
Note:
Year
Region / City:
Midland, Texas
Theme:
Oil & Gas Permit Application
Document Type:
Surface Location Acknowledgment Form
Agency / Organization:
City of Midland
Target Audience:
Surface Owners
Contextual Description:
A legal document confirming the acknowledgment of a proposed oil and gas well location and its operational details by a surface owner, outlining compensation, restoration, and operational conditions.
Year:
2025
Document type:
Eligibility assessment form
Subject:
Code manager licence for the Gas Network Code
Regulatory authority:
Gas and Electricity Markets Authority
Supporting body:
Office of Gas and Electricity Markets
Jurisdiction:
United Kingdom
Related codes:
Uniform Network Code; Independent Gas Transporters’ Uniform Network Code
Purpose:
Assessment of eligibility and expression of interest for the code manager role
Target audience:
Organisations invited to apply for a code manager licence
Guidance referenced:
Guidance on Code Manager Selection
Guidance publication date:
16 May 2025
Submission method:
Email
Contact email:
[email protected]
Legal context:
Companies Act 2006
Scope:
Organisational information, licensing status, industry code participation, declarations of understanding and interest
Project title:
Assistance to the Republic of Kazakhstan in fulfilling international obligations to reduce greenhouse gas emissions by reducing the carbon footprint of electricity suppliers for the leading technology company Bitfury
Project ID number:
Not specified
Country:
Kazakhstan
Implementing partner:
Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan
Responsible partner:
United Nations Development Programme
Partner organization:
Bitfury Holding B.V.
Start date:
December 12, 2019
End date:
December 31, 2021
Project approval bodies:
UNDP; Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan
Thematic area:
Climate change mitigation; greenhouse gas emissions; forestry and carbon sequestration
International framework:
Paris Agreement; Kyoto Protocol
Total budget:
USD 2,068,222
Funding sources:
Bitfury Phase I and II; Government of Kazakhstan (in-kind); UNDP (in-kind)
Gender marker:
GEN1
Related SDG:
UN Sustainable Development Goal on forest restoration and climate action
Type of source:
International development project documentation
Year:
2021
Date:
20 August 2021
Version:
1.0
Document type:
User guide
Industry:
Aerospace industry
Topic:
Scope 3 greenhouse gas emissions
GHG scope:
Scope 3
Emission categories:
Purchased Goods & Services; Capital Goods
Methodological basis:
GHG Protocol Corporate Value Chain (Scope 3) Accounting and Reporting Standard
Organization:
International Aerospace Environmental Group (IAEG)
Working group:
IAEG Work Group 3
Purpose:
Voluntary accounting and reporting of greenhouse gas emissions
Geographical scope:
Aerospace industry value chain
Copyright holder:
International Aerospace Environmental Group (IAEG)
Status:
Informational document, not a standard
Approval date:
20 August 2021
Intended users:
Aerospace and defense companies and value chain partners
Period covered:
Not specified
Year:
2025
Region / City:
Global
Topic:
Energy / Transformer Maintenance
Document Type:
Course Syllabus
Institution:
EON Reality Inc
Author:
EON Reality Inc
Target Audience:
Energy Technicians, Maintenance Professionals, Transformer Maintenance Specialists
Certification:
EON Integrity Suite™ Certification
Standards:
IEEE, ASTM, IEC
Duration:
Not specified
Date of Approval:
10/31/2025
Last Updated:
Not specified
Year:
2025
Region / City:
United States
Topic:
Natural Gas Pipelines, Energy Regulation
Document Type:
Notice of Proposed Rulemaking
Agency:
Federal Energy Regulatory Commission
Author:
Federal Energy Regulatory Commission
Target Audience:
Industry professionals, regulatory bodies, and energy sector stakeholders
Period of Validity:
Not specified
Approval Date:
October 16, 2025
Amendment Date:
Not specified
Note:
Year
Year:
2025
Region / jurisdiction:
California, United States
Program:
Gas Research and Development Program
Funding opportunity ID:
GFO-24-501
Issuing authority:
California Energy Commission
Document type:
Grant funding opportunity solicitation
Subject area:
Gas transition, energy system decarbonization, applied energy research
Target sectors:
Residential and commercial buildings
Funding focus:
Applied research on gas decommissioning, electrification, and lower-carbon gas alternatives
Relevant budget plans:
Gas R&D Budget Plan FY 2021–2022; Gas R&D Budget Plan FY 2022–2023
Application components:
Executive summary, project narrative, scope of work, schedule, budget, compliance and declarations
Evaluation process:
Two-stage application screening and scoring
Policy context:
Long-Term Gas Planning and integrated energy planning in California
Year:
2024
Region / City:
USA
Topic:
Environmental Impact Assessment, Supply Chain
Document Type:
Report
Organization / Institution:
Wesley Ingwersen
Author:
Wesley Ingwersen
Target Audience:
Researchers, Environmental Scientists, Policymakers, Industry Professionals
Period of Validity:
2022
Approval Date:
July 5, 2024
Revision Date:
July 5, 2024
Year:
2023
Region / City:
South Portland, Maine
Subject:
Stormwater management
Document Type:
Inspection Report
Institution:
City of South Portland
Author:
Not specified
Target Audience:
Inspectors, City Officials
Period of Validity:
Annual
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2017
Region / City:
Canada
Subject:
Occupational Health and Safety, Workplace Safety
Document Type:
Inspection Checklist
Organization:
WorkSafeBC
Author:
WorkSafeBC
Target Audience:
Employers, Qualified Personnel
Effective Period:
N/A
Approval Date:
October 2017
Amendment Date:
N/A