Provides step-by-step instructions and technical requirements for connecting new distributed generation and energy storage systems up to 5 MW to utility distribution networks, including application, review, testing, and acceptance procedures.
Year:
2024
Region / City:
New York State, USA
Topic:
Energy Infrastructure / Interconnection
Document Type:
Regulatory Guideline
Issuing Authority:
New York State Public Service Commission
Target Audience:
Distributed generation and energy storage system applicants, utility companies
Scope:
Interconnection of new distributed generation and energy storage systems 5 MW or less
Effective Date:
February 1, 2024
Application Portal:
Interconnection On-Line Application Portal (IOAP)
System Capacity Limit:
5 MW AC maximum
Review Process:
Standardized interconnection requirements and application procedures
Compliance:
Equipment certification, testing, and operational standards
Cost Responsibility:
Applicants responsible for utility interconnection costs
Process Monitoring:
Department of Public Service staff oversight
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Region / city:
West Virginia
Topic:
Solar Energy, Wholesale Energy Generation
Document Type:
Legislative Rule
Organization / Institution:
Public Service Commission of West Virginia
Target Audience:
Entities seeking siting certificates for solar EWG facilities
Year:
2023
Region / City:
Baton Rouge, Louisiana
Topic:
Hazardous Waste Management
Document Type:
Guidance Document
Organization:
Louisiana Department of Environmental Quality
Author:
Louisiana Department of Environmental Quality
Target Audience:
Large Quantity Generators of Hazardous Waste, Environmental Services Personnel
Effective Period:
Ongoing
Approval Date:
August 31, 2023
Amendment Date:
N/A
This document provides guidance on the closure of central accumulation areas by large quantity generators of hazardous waste in accordance with Louisiana Administrative Code (LAC) 33:
V.1015.B.8.
Year:
2023
Region / City:
South Africa
Subject:
Energy / Embedded Generators
Document Type:
Checklist
Organization / Institution:
SALGA, AMEU
Author:
Not specified
Target Audience:
Municipalities, Embedded Generator stakeholders
Effective Period:
February 2023
Approval Date:
February 2023
Modification Date:
February 2023
Note:
Year
Subject:
Procurement / Supply / Maintenance of Generators
Document Type:
Form
Organization / Institution:
UNHCR
Target Audience:
Bidders / Contractors
Period of Validity:
60 days
Context:
A form for submitting financial offers related to the supply, delivery, installation, and maintenance of generators for a project.
Year:
2019
Region / City:
Maine
Subject:
Hazardous Waste Management
Document Type:
Legal Text
Organization:
Maine Department of Environmental Protection
Author:
Maine Department of Environmental Protection
Target Audience:
Businesses, Waste Generators, Environmental Protection Agencies
Effective Period:
Ongoing
Approval Date:
July 1, 2019
Amendment Date:
N/A
Section Number:
49-929
Jurisdiction:
State level
Subject:
Hazardous waste regulation
Type of Source:
Statute
Responsible Authority:
Department
Administering Official:
Director
Registration Requirement:
Annual registration
Registration Validity:
One year from date of registration
Fees:
$1,500 plus $2 per ton for treatment, storage and disposal facilities; $200 for transporters; $300 for large quantity generators; $100 for small quantity generators
Revenue Allocation:
Water Quality Assurance Revolving Fund
Purpose of Fund Use:
Administration of the registration program
Referenced Sections:
49-930; 49-282
Year:
2024
Region / City:
Australia
Topic:
Energy Market Regulation
Document Type:
Application Form
Organization / Institution:
Australian Energy Market Operator Ltd (AEMO)
Author:
Australian Energy Market Operator Ltd (AEMO)
Target Audience:
Registered participants in the National Electricity Market (NEM)
Effective Period:
From June 3, 2024
Approval Date:
Not specified
Date of Changes:
Not specified
Document Purpose:
This application form is for the transition of registered generators and customers to an Integrated Resource Provider (IRP) in the NEM.
Year:
2023
Region / City:
Chongqing
Topic:
Nuclear Energy, Fusion Systems, Neutron Sources
Document Type:
Research Report
Organization:
FDS Consortium, International Academy of Neutron Science (Chongqing) Co., Ltd.
Author:
Chao Liu
Target Audience:
Researchers in nuclear energy, fusion technology, and neutron science
Period of Activity:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2020
Region / city:
Wales, United Kingdom
Topic:
Emissions Monitoring
Document type:
Compliance Assessment Report
Organization / Institution:
Natural Resources Wales
Author:
Geraint Harris
Target audience:
Operators, Regulatory Authorities
Period of validity:
Not specified
Approval date:
22/01/2020
Amendment date:
Not specified
Year:
Not specified
Subject:
Maintenance Service
Document Type:
Prior Information Notice (PIN)
Organization / Institution:
King Facilities Management (KFM)
Author:
Not specified
Target Audience:
Potential suppliers for maintenance service
Validity Period:
1 year
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2025
Region / City:
Southern California
Topic:
Distributed Generation Deliverability
Document Type:
Application
Author:
Southern California Edison
Target Audience:
Distributed Generation Facility Owners, Utility Operators
Period of Validity:
Until April 15, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Description:
Application for deliverability status submission for distributed generation facilities seeking interconnection to investor-owned utility distribution facilities under ISO Tariff Section 40.4.6.3.
Year:
2026
Region / City:
United States
Subject:
Military Training, Civil Support, HAZMAT, Antiterrorism, Leadership
Document Type:
Course Description
Organization:
U.S. Army, U.S. Department of Defense
Author:
N/A
Target Audience:
Military Personnel, Federal Employees, International Military Students
Period of Action:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
FY1998
Region / city:
VA Facilities
Subject:
Low Voltage Communications Systems
Document Type:
Technical Specification
Organization:
Department of Veterans Affairs
Author:
Spec Writer
Target Audience:
Contractors, Spec Writers, VA Facilities Management
Effective Period:
FY1998–FY2000
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2026
Region / City:
N/A
Theme:
Power monitoring, System migration
Document type:
Technical guide
Organization:
Schneider Electric
Author:
N/A
Target audience:
System administrators, IT professionals
Action period:
N/A
Approval date:
N/A
Modification date:
N/A
Year:
2023
Region / City:
Alberta
Topic:
Distributed Energy Resources, Utility Standards
Document Type:
Guide
Organization / Institution:
FortisAlberta
Author:
Chris Mateo, P.Eng., Kevin van Popta, P.Eng.
Target Audience:
Utility workers, engineers, and industry professionals
Period of Validity:
Not specified
Approval Date:
2023 / 12 / 12
Modification Date:
Not specified
Year:
2022
Region / City:
Georgia, Atlanta
Subject:
Distributed Energy Resource Program, Energy Tariffs
Document Type:
Commission Order
Organization / Institution:
Georgia Public Service Commission
Author:
Georgia Public Service Commission
Target Audience:
Commercial and Industrial Customers
Period of Validity:
Pilot Program
Approval Date:
January 17, 2023
Modification Date:
N/A
Year:
2021
Region / City:
Ethiopia
Theme:
Energy, Electrification, Rural Development
Document Type:
Stakeholder Engagement Plan
Organization / Institution:
Ethiopian Electric Utility
Author:
Ethiopian Electric Utility
Target Audience:
Stakeholders in the energy sector, local communities, government, and private sector partners
Period of Validity:
January 2021 – ongoing
Approval Date:
January 2021
Date of Changes:
Not specified
Document type:
User manual
Model name:
1K-DHM-event
Version:
2.12
Date:
October 27, 2015
Authors:
Yasuto Tachikawa; Tomohiro Tanaka
Institution:
Department of Civil and Earth Resources Engineering, Kyoto University
Location:
Kyoto, Japan
Scientific field:
Hydrology; hydrological modeling
Model type:
Distributed hydrological model
Theoretical basis:
Kinematic wave theory
Programming language:
C++
Supported operating systems:
Microsoft Windows; Linux
Spatial resolution:
30 second grid
Geographic coverage:
Asia
Topographic data source:
HydroSHEDS digital elevation and flow direction data
Forcing data type:
Hourly gridded rainfall or runoff generation data
Associated software:
hydroshed2topo
Year:
2013
Region / City:
-
Topic:
Software Quality Assurance
Document Type:
Plan
Organization / Institution:
DMM Team
Author:
Ahmed Osman, Shailesh Shimpi, Isaac Pendergrass, Tom Mooney
Target Audience:
DMM project team
Validity Period:
-
Approval Date:
6/1/2013
Revision Date:
6/1/2013
Note:
Revision History
Approval:
Stuart Faulk, 4/28/2013
Context:
Distributed software quality assurance plan for the DMM project, defining quality standards, testing strategies, and documentation for team collaboration.
Year:
2020
Region / City:
Not specified
Topic:
Distributed Control System
Document Type:
Specification
Organization / Institution:
Rockwell Automation
Author:
Rockwell Automation
Target Audience:
Engineers, system integrators, and industry professionals involved in control system design and implementation
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified