№ lp_1_11707
File format: docx
Character count: 3626
File size: 629 KB
Form used for ordering UNICEF UK digital resources, such as e-learning for paediatricians, GPs, and audits, requiring user details and payment information for processing.
Year:
2025
Region / city:
UK
Topic:
Digital resources ordering
Document type:
Order form
Organization / institution:
UNICEF UK
Author:
UNICEF UK
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date issued:
01 July 2024
Source:
ECO
Subject:
Clutter Digital Data for ITU-R P-Series Recommendations – information on Corine Land Cover (CLC) 2018 data and workflow
Type of report:
New Feature
SEAMCAT version:
5.5.1
SEAMCAT component involved:
PMP, Terrain Profile, Clutter Profile
Background information:
STG#82 discussed on digital terrain model and Clutter Digital Data for ITU-R P-Series Recommendations. Document STG(24)010 elaborates on this topic and outline possible options and free sources found so far.
Description of the issue:
There are only a few databases of DLU (land cover) data that are freely available for different parts of the world. The creation of these datasets is primarily driven by understanding the vegetation usage across the area and therefore the classifications for different types of buildings does vary significantly as does their resolution.
CLC Country coverage:
Fig: Map view of CLC land cover raster data
File format:
geoTIFF *.tif
Size:
242.18 MB
Extent:
900000.000,900000.000 : 7400000.000,5500000.000
Width:
65000
Height:
46000
Data type:
Byte - Eight bit unsigned integer
Dimensions:
X: 65000 Y: 46000
Bands:
1
Origin:
900000,5.5e+06
Pixel Size:
100,-100
Coordinate Resolution:
100 meters
Coordinate system name:
EPSG:3035 - ETRS89-extended / LAEA Europe
Coordinate Units:
meters
Projection Method:
Lambert Azimuthal Equal Area
Clutter category:
Representative clutter height (m)
Water/sea:
0
Open/rural:
0
Suburban:
10
Urban/trees/forest:
15
Dense urban:
20
Proposal:
Review the information provided on the appropriate data maps and decide how to move forward regarding PMPs using terrain.
Suggested Priority:
Medium
Country:
United Republic of Tanzania
Project name:
Digital Tanzania Project
Document type:
Environmental and Social Commitment Plan
Abbreviation:
ESCP
Project ID:
P160766
Sector:
Information and communication technology
Implementing authority:
Ministry of Communication and Information Technology
Co-implementing authority:
President’s Office Public Service Management and Good Governance
Financing institution:
World Bank
Date:
April 22, 2021
Related frameworks:
Environmental and Social Management Framework; Resettlement Policy Framework; Stakeholders Engagement Plan; Labor Management Procedures; Vulnerable Groups Planning Framework
Monitoring frequency:
Quarterly
Scope:
Environmental and social risk management
Year:
2018
Region / City:
North Las Vegas, NV
Topic:
Digital Signage, Audio Visual Equipment
Document Type:
Combined Solicitation/Synopsis
Agency:
Department of Veterans Affairs
Author:
Susanne Christen
Target Audience:
Contractors, Suppliers
Period of Action:
September 24, 2018 - September 27, 2018
Approval Date:
September 24, 2018
Date of Changes:
N/A
Year:
2025
Region / City:
Central and Eastern Europe (CEE)
Subject:
Digital Invoice Finance, Trade Finance, SME Financing
Document Type:
Request for Expression of Interest
Organization:
International Finance Corporation (IFC)
Author:
International Finance Corporation (IFC)
Target Audience:
Consulting firms specializing in digital finance and trade asset origination
Effective Period:
March 13–14, 2025
Approval Date:
N/A
Modification Date:
N/A
Year:
2026
Region / City:
Accra
Topic:
Transport regulation, Digital system, Road safety
Document type:
News article
Author:
Eric Appah Marfo
Target audience:
General public
Approval date:
20 January 2026
Date of last update:
20 January 2026
Confidentiality Level:
BL - Restricted for internal use
TC ID / Revision:
00153898/C
Document Status:
Document Released
Document No.:
N/A
WBS code:
5.2 - RP3 Particle acceleration by lasers
PBS code:
E.E4.ELMA.4.5.4
Project branch:
Engineering & Scientific documents (E&S)
Document Type:
Specification (SP)
Position:
Senior researcher
Prepared by:
Senior researcher Valentina Scuderi
Reviewed By:
Daniele Margarone, Ladislav Půst, Pavel Bastl, Roman Kuřátko, Tomáš Laštovička, Veronika Olšovcová, Viktor Fedosov
Approved by:
Georg Korn
Revision History / Change Log:
D. Margarone, V. Scuderi, A. Kuzmenko
Date of Creation:
26.07.2017
Date of Last Modification:
22.08.2017
Change Description:
RSD draft creation, RSD update, formal update for approval
Introduction:
The Requirements Specification Document (RSD) details technical requirements and constraints for the Real-time Digital Oscilloscope to be purchased for the ELI Beamlines project.
Purpose:
The document defines the functional, performance, safety, and quality requirements for the Oscilloscope.
Scope:
The Oscilloscope specifications include performance standards, interface needs, power supply compatibility, safety, and delivery requirements.
Terms, Definitions and Abbreviations:
AC, BW, CA, Ch, CPU, DC, ELI, GND, pts, RMS, RSD, USB, WXGA
References to standards:
This document permits alternatives to specified standards if they are equivalently proven by the supplier.
Functional, Performance and Design requirements:
Includes minimum specifications for bandwidth, vertical resolution, sample rate, memory, sensitivity, and accuracy of the Oscilloscope.
Interface requirements:
Specifies connectivity options such as Ethernet and USB, and software compatibility with Windows 7.
Power supply:
The Oscilloscope is compatible with a wide range of AC input voltages and has specified power consumption limits.
Delivery requirements:
Delivery of the Oscilloscope must be managed by the Supplier to the ELI Beamlines final destination.
Safety Requirements:
Supplier must provide a Declaration of Conformity or equivalent documentation for compliance with EU regulations.
Quality Requirements:
The Supplier must provide user manuals, calibration certificates, and proof of outgoing checks, as well as ensure non-conformance control and warranty repair procedures.
Note:
Year
Subject:
Digital Skills
Document Type:
Educational Plan
Organization / Institution:
Pearson Edexcel
Target Audience:
Learners
Year:
2025
Region / City:
Nairobi, Kenya
Theme:
Gender-based violence, Digital security
Document Type:
Official statement
Institution:
Government of Kenya
Author:
Government of Kenya
Target Audience:
International organizations, policymakers, public
Period of Validity:
Ongoing
Approval Date:
October 15, 2025
Date of Amendments:
October 15, 2025
Note:
Year
Year:
2026
Region / city:
Victoria
Topic:
Literacy, numeracy, and digital support in vocational education and training
Document type:
Implementation guide
Agency / institution:
Department of Jobs, Skills, Industry and Regions
Author:
State of Victoria
Target audience:
TAFE and dual-sector universities, Adult and Community Education (ACE) providers, Skills First students
Period of validity:
From 1 January 2026
Approval date:
10 November 2025
Date of changes:
N/A
Document type:
Information notice
Regulation:
EU Data Act (Regulation (EU) 2023/2854)
Manufacturer:
ABB
Organization:
ABB Limited
Organization address:
Oldends Lane, Stonehouse, Gloucestershire, GL10 3TA, United Kingdom
Connected product category:
Digital pH/ORP and chlorine sensors
Connected products:
100 GP-D (APS122); 100 ULTRA-D (APS132); 500 PRO-D (APS522); 700 ULTRA-D (APS732); 700 M-D (APS752); 500 X-D (APS552); ChloroStar Sensor (ACL420)
Product connectivity:
Transmitters; wired digital and analog interfaces; wireless Bluetooth
Type of product data (direct access):
Measurement data; diagnostic logs; calibration data; manufacturing and configuration data
Product data formats (direct access):
CSV; XML; ABB native format; PDF
Estimated data volume (direct access):
Approximately 1–5 MB per hour
Data generation frequency:
Continuous, real time
Data retention period (direct access):
30 to 180 days
Type of product data (indirect access):
Configuration backups; fault logs; service interaction notes
Product data formats (indirect access):
TXT; CSV; XML; PDF
Estimated data volume (indirect access):
Up to 10 MB per service session
Data collection frequency (indirect access):
During support events, firmware updates, or calibration checks
Storage location (indirect access):
ABB technician systems; ABB secure SharePoint
Retention period (indirect access):
Up to 24 months
Data access request method:
ABB support channels; ABB privacy website
Year:
2025
Region / City:
Ontario
Theme:
Geospatial Data, Lidar, Digital Terrain Model
Document Type:
User Guide
Organization:
Ministry of Natural Resources
Author:
Geospatial Ontario
Target Audience:
Data users, GIS professionals
Period of Validity:
Ongoing
Approval Date:
2025-09-09
Date of Changes:
2025-09-09
Year:
2023
Publication date:
2023-03-21
Type:
Whitepaper
Organization:
Industry IoT Consortium
Authors:
Claude Baudoin; Erin Bournival; Chuck Byers; Abhijeet Kelkar; Howard Kradjel; Alfred Strauch; Daniel Young; Bassam Zarkout
Topic:
Digital transformation
Domain:
Industrial Internet of Things
Focus:
Digital Transformation Enablers
Related frameworks:
Industrial Internet Reference Architecture (IIRA)
Industry scope:
Industrial and enterprise systems
Source:
Industry IoT Consortium
Year:
2025
Region / City:
Arlington, Virginia, USA
Topic:
Medical Imaging, Obstetrics
Document Type:
Standard Supplement
Organization:
DICOM Standards Committee
Author:
N/A
Target Audience:
Healthcare professionals, medical imaging specialists
Period of Validity:
N/A
Approval Date:
July 10, 2025
Date of Changes:
N/A
Year:
2025-2026
Region / City:
Las Vegas
Field:
Education, Journalism & Media Studies
Document Type:
Academic Catalog
Institution:
University of Nevada, Las Vegas
Author:
Graduate College
Target Audience:
Graduate students in Journalism & Media Studies
Period of Validity:
2025-2026 academic year
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual Description:
Academic catalog outlining the Master of Arts degree requirements and plan of study for Journalism & Media Studies with a focus on Strategic Digital and Social Media.
Year:
2023
Region / City:
Wales
Topic:
Environmental protection, Permit approval
Document Type:
Decision document
Organization:
Natural Resources Wales
Author:
Not specified
Target Audience:
Regulatory authorities, stakeholders in environmental management
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2019
Region / City:
Wales
Subject:
Environmental Permitting
Document Type:
Decision Document
Agency / Institution:
Natural Resources Wales
Author:
Natural Resources Wales
Target Audience:
Operators and Environmental Agencies
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Note:
7/8/2016
Year:
2016
Region / City:
Not specified
Topic:
Gender bias in student evaluations of teaching (SETs), race/ethnicity bias, bias against women in academia
Document Type:
Annotated bibliography
Institution:
Not specified
Author:
Shari Stone-Mediatore
Target Audience:
Researchers, educators, academic professionals
Period of Action:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014
Region / City:
Zimbabwe
Theme:
Climate Change, Water Resources
Document Type:
Issues Paper
Organization:
World Bank
Author:
World Bank
Target Audience:
Government, Policymakers, Water Resources Planners
Period of Action:
Not specified
Approval Date:
April 25, 2014
Date of Amendments:
Not specified