№ files_lp_4_process_3_132483
File format: docx
Character count: 43375
File size: 145 KB
Summary of email discussions and proposals regarding increasing the maximum UE output power for carrier aggregation (CA) and dual connectivity (DC) in NR, including suggested CRs, power class modifications, and per-band signaling considerations.
Year:
2022
Region / City:
International / Virtual Meeting
Subject:
NR uplink power limits for CA and DC
Document Type:
Meeting summary / Technical report
Organization:
3GPP TSG-RAN WG4
Author:
Moderator (Qualcomm Incorporated)
Target Audience:
3GPP members and contributing companies
Period:
February 21 – March 3, 2022
Approval Date:
Not specified
Revision Date:
Not specified
Contributing Companies:
InterDigital Finland Oy, Apple, Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell, ZTE Corporation, Xiaomi
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Note:
Region / City
Topic:
NR SRS carrier switching
Document Type:
Discussion
Organization:
3GPP
Author:
Qualcomm Incorporated
Target Audience:
RAN1 and RAN2 groups
Year:
2020
Event:
TSG-RAN WG1 Meeting #102-e
Topic:
UL time and frequency synchronization for NR NTN
Document type:
Technical contribution / meeting report
Organization:
3GPP
Author:
Thales (moderator)
Contributors:
MediaTek, CATT, Ericsson, InterDigital, CMCC, ZTE, Apple, CAICT, Sony, LG Electronics
Target audience:
3GPP RAN1 working group members
Agenda item:
8.4.2
Sections:
Clarification on UE capability; UL timing synchronization; UL frequency synchronization; Serving satellite ephemeris; References
Scope:
NR NTN Rel-17 solutions
Date of meeting:
August 17–28, 2020
Organization:
3rd Generation Partnership Project (3GPP)
Group:
TSG RAN WG1
Meeting:
#102-e e-Meeting
Document Number:
R1-2007151
Agenda Item:
8.1.1
Source:
Moderator (Samsung)
Company:
Samsung
Title:
Moderator summary for multi-beam enhancement: EVM
Work Item:
Rel.17 NR FeMIMO
Frequency Range:
FR2 @ 30 GHz (baseline), applicable also to FR1
Simulation Type:
SLS (baseline), optional LLS
Scenarios:
Dense Urban, High Speed Train, Indoor
Channel Model References:
TR 38.802, TR 38.913, TR 38.901
Performance Metrics:
UE throughput CDF, average and 5% throughput, TCI state update signaling overhead, beam switching latency, RSRP distribution
Traffic Model:
Full buffer
UE Configuration:
Multi-panel UE (3 panels: left, right, back)
Antenna Configuration:
BS (4,8,2,2,2); UE (1,4,2)
Transmission Scheme:
Multi-antenna port transmission
Link Adaptation:
Based on CSI-RS
Intended Purpose:
Discussion and Decision
Document Type:
Meeting Report
Organization:
3GPP TSG RAN WG1
Date:
August 17–28, 2020
Reference ID:
R1-200abcd
Scope:
CSI enhancements for MTRP and FR1 FDD reciprocity
Frequency Range:
FR1
Duplex Mode:
FDD
Scenario:
Dense Urban Macro
Antenna Configuration:
gNB 16–32 ports, UE 2–4 RX
Evaluation Metrics:
Throughput and CSI feedback overhead
MIMO Scheme:
SU-MIMO / MU-MIMO with rank adaptation
Channel Modeling:
FDD DL/UL reciprocity, Options 1 and 2
Companies Participating:
19 companies including VIVO, Samsung, Ericsson, Nokia, Apple, Huawei/HiSi
Organization:
3rd Generation Partnership Project
Working Group:
TSG-RAN WG4
Meeting:
#102-e
Document number:
R4-22XXXXX
Meeting type:
Electronic Meeting
Date:
21 February – 03 March 2022
Agenda item:
10.14
Source:
Moderator (MediaTek Inc.)
Title (as provided):
Email discussion summary for [102-e][222] NR_UE_pow_sav_enh
Document for:
Information
Related Work Item:
NR_UE_pow_sav_enh (Rel-17)
Related Specifications:
RLM/BFD relaxation, RRM requirements
Contributing Companies:
CMCC; Ericsson; MediaTek Inc.; Qualcomm, Inc.; Apple; vivo
Technical Scope:
UE Power Saving Enhancements including RLM/BFD relaxation and RRM performance requirements
Discussion Rounds:
1st round (scope and options); 2nd round (issue conclusions)
Feature Table Reference:
Rel-17 feature table entry for Support of RLM/BFD relaxation
Type of Document:
Meeting summary and technical discussion report
Year:
2020
Organization:
3GPP TSG RAN WG1
Meeting Number:
102-e
Source:
Moderator (Samsung)
Document Type:
Meeting Report / Technical Discussion
Agenda Item:
8.7.1.2
Topics Covered:
TRS/CSI-RS for idle/inactive UEs, clarification proposals, RS types, functional discussion
Phase:
Phase II discussion
Contributors:
Huawei, HiSilicon, Panasonic, DOCOMO
Discussion Period:
August 17–28, 2020
Decision Status:
For discussion/decision
Target Audience:
3GPP working group members
Year:
2022
Region / City:
Electronic Meeting
Topic:
UE Power Saving Enhancements
Document Type:
Meeting Summary
Organization:
3GPP TSG-RAN WG4
Author:
Moderator (MediaTek Inc.)
Target Audience:
3GPP TSG-RAN WG4 Participants
Period of Effect:
February 21, 2022 – March 03, 2022
Approval Date:
Not Provided
Modification Date:
Not Provided
Organization:
3rd Generation Partnership Project
Working Group:
3GPP TSG‑RAN WG4
Meeting:
3GPP TSG‑RAN WG4 Meeting #102‑e
Meeting format:
Electronic Meeting
Meeting period:
21 February – 03 March 2022
Agenda item:
10.14
Topic:
NR UE Power Saving Enhancements
Document type:
Email discussion summary
Document status:
Information
Source:
Moderator (MediaTek Inc.)
Technical domain:
Telecommunications Engineering / 5G NR
Related technical areas:
Radio Resource Management (RRM), Radio Link Monitoring (RLM), Beam Failure Detection (BFD)
Related release:
3GPP Release 17
Companies contributing:
China Mobile Communications Corporation, Ericsson, MediaTek Inc., Qualcomm, Apple Inc., vivo
Referenced document:
R2-2201989 LS to RAN4 on RLM/BFD relaxation for ePowSav
Primary subject:
UE capability signaling and measurement relaxation mechanisms for RLM and BFD in NR power saving features
Agenda subtopics:
General and work plan; UE measurements relaxation for RLM/BFD; RRM performance requirements
Year:
2022
Meeting:
3GPP TSG-RAN WG4 Meeting #102-e
Date:
21 February – 03 March 2022
Agenda item:
10.14
Organization:
3GPP TSG-RAN Working Group 4
Source:
Moderator (MediaTek Inc.)
Participating organizations:
CMCC; Ericsson; MediaTek Inc.; Qualcomm, Inc.; vivo
Topic:
NR UE Power Saving Enhancements
Technical scope:
RLM/BFD relaxation mechanisms and UE measurement requirements
Related correspondence:
Incoming LS from RAN2 (R2-2201989) on RLM/BFD relaxation for ePowSav
Document type:
Email discussion summary
Work items:
NR_UE_pow_sav_enh feature definition for Release 17
Technical areas:
Radio Resource Management; UE capability signaling; power saving mechanisms
Key concepts:
RLM relaxation; BFD relaxation; SSB-based measurements; CSI-RS-based measurements; beam failure recovery
Proposed feature scope:
UE capability for relaxation of RLM and/or BFD measurements with per-UE granularity and optional capability signaling
Discussion process:
Two-round email discussion covering scope, options, and issue resolution
Year:
2022
Event:
3GPP TSG-RAN WG4 Meeting #102-e
Date:
February 21 – March 3, 2022
Location:
Electronic meeting
Agenda item:
9.35
Source:
Qualcomm Incorporated
Contributors:
InterDigital Finland Oy, Apple, Huawei, HiSilicon, Ericsson, Nokia, Nokia Shanghai Bell, ZTE Corporation, Xiaomi
Document type:
Meeting summary / Technical discussion
Work item:
RP-212622
Objective:
Increase maximum output power for CA and DC
Target submission:
RAN #95e
Proposals included:
Power class adjustments, per-band signaling, LUT method, sum method
Technical scope:
NR uplink, inter-band CA, DC configurations
Year:
2020
Organization:
3GPP TSG RAN WG1
Document Type:
Meeting report / Discussion paper
Region:
International
Author / Moderator:
Samsung
Target Audience:
3GPP member companies
Agenda Item:
8.7.1.2
Discussion Phases:
Phase I, Phase II, Phase III
Topics Covered:
TRS/CSI-RS usage for idle/inactive UEs, proposals for clarification, RS types, functionalities
Date of Meeting:
August 17–28, 2020
Year:
2020
Event:
3GPP TSG RAN WG1 #102-e
Date:
August 17–28, 2020
Document Type:
Meeting contribution
Topic:
TRS/CSI-RS configuration for idle/inactive UEs
Source:
Moderator (Samsung)
Audience:
3GPP RAN WG1 members
Phase:
Phase II discussions
Agenda Items:
8.7.1.2
Proposals Discussed:
TRS/CSI-RS transmission for idle/inactive UEs, availability notification, signaling methods
Companies Involved:
Samsung, Apple, Panasonic, Sony, Ericsson, DOCOMO, Huawei, Intel, Nokia, Qualcomm, ZTE, Spreadtrum, MediaTek, CMCC, Futurewei, HiSilicon
Year:
2022
Region / city:
Global
Theme:
Power saving enhancements in UE
Document Type:
Meeting Summary
Organization:
3GPP TSG-RAN WG4
Author:
MediaTek Inc.
Target Audience:
Industry professionals, engineers, and organizations working on UE power saving enhancements
Period of validity:
February – March 2022
Approval Date:
21 February 2022
Revision Date:
N/A
Year:
2022
Event:
3GPP TSG RAN WG1 #108-e e-Meeting
Date:
February 21 – March 3, 2022
Source:
Moderator (CATT)
Title:
Moderator summary #1 on enhancements of beam management for multi-TRP
Agenda Item:
8.1.2.3
Document Type:
Discussion and Decision
Participants:
Qualcomm, LGE, CMCC, Xiaomi, Lenovo, Motorola Mobility, Intel, TCL, Sony, OPPO, Apple, ZTE, Samsung, MTK, vivo, Spreadtrum, CATTA, FutureWei
Topics Covered:
Beam measurement/reporting, L1-SINR reporting, CSI-RS configuration, TRP-specific BFR, M-TRP beam failure recovery
Standards Referenced:
3GPP 38.214
Document Scope:
Issues and proposals on enhancements for beam management in multi-TRP scenarios
Year:
2023
Location:
Athens, Greece
Subject:
3GPP RAN2 LTM RRC configuration
Document type:
Technical progress report
Organization:
3GPP TSG-RAN WG2
Author:
Ericsson
Intended audience:
RAN2 members, telecom engineers
Meeting number:
121
Discussion topics:
Reference configuration, LTM candidate configuration, RRC procedures, UE actions, configuration application options
Organization:
Illinois Municipal Retirement Fund (IMRF)
Document Type:
Request for Proposal (RFP)
Subject:
Procurement of a multi-factor based U.S. small capitalization equity index provider
Asset Size:
$47.9 billion (as of December 31, 2022)
Geographic Scope:
Illinois, United States
Beneficiary Group:
Employees of local government in Illinois (excluding the City of Chicago and Cook County)
Chief Investment Officer:
Angela Miller-May
RFP Issue Date:
February 17, 2023
Inquiry Deadline:
February 24, 2023
Proposal Submission Deadline:
March 17, 2023
Anticipated Finalist Identification:
By April 21, 2023
Submission Method:
E-mail to [email protected]
Regulatory Context:
Illinois Freedom of Information Act; Illinois Pension Code Section 1-113.21
Services Required:
Delivery of index data, methodology documentation, corporate actions handling, rebalance notifications, performance data, and data to authorized third parties
Contract Term:
No fixed timeline; terminable at IMRF’s discretion
Quiet Period:
February 17, 2023 until selection or conclusion of process
Document Type:
Course Modification Proposal Form
Course Prefix and Number:
ECH 4012
Course Title:
Organizing and Managing the Learning Environment
Academic Level:
Undergraduate
Governing Body:
Undergraduate Curriculum Council
Department:
Teacher Education Program
Institutional Committees:
Department Curriculum Committee; College Curriculum Committee; Office of Assessment
Department Curriculum Committee Chair:
Joanna Grymes
Department Chair:
Ronald Towery
College Dean:
Lance G. Bryant
Undergraduate Curriculum Council Chair:
Mary Elizabeth Spence
College Curriculum Committee Chair:
Wayne Wilkinson
Approval Dates:
February 28, 2020; March 2, 2020; March 8, 2020; March 11, 2020
Proposed Effective Term:
Fall 20
Course Description:
Techniques of classroom management, theories of discipline, and positive behavior guidance; admission to the Teacher Education Program required
Prerequisites:
TE 2013; ECH 2013; ECH 2023; ECH 2033; ECH 3013; ECH 3043; ECH 3053; ECH 3063; ECH 3073; ECH 3083; ECH 3004; RDNG 3203; ELSE 3643
Corequisites:
RDNG 4403; ECH 4013; ECH 4023; ECH 4043
Course Frequency:
Irregular
Modification Details:
Change of prerequisite from ECH 2003 to TE 2013; change of course offering to irregular
Justification:
Course retained from a previous program and maintained in case of licensure changes
Contact Person:
Joanna Grymes ([email protected]
Note:
; 8430)
Year:
2022
Meeting:
3GPP TSG-RAN WG2 #117-e
Meeting Type:
Electronic meeting
Meeting Period:
21 February – 3 March 2022
Agenda Item:
4.1
Document Number:
R2-2203572
Source:
Ericsson (Rapporteur)
Contact Person:
Emre A. Yavuz ([email protected]
Note:
)
Organization:
3GPP TSG-RAN WG2
Topic:
NB-IoT R15, 2 HARQ processes and HARQ RTT timer
Related Documents:
R2-2203480; R2-2203486; R2-2203495; R2-2203496
Document For:
Discussion, Decision
Scope:
Discussion of whether correction is needed and work on the related CRs
Intended Outcome:
Report and revised CRs if needed
Deadline:
24 February 2022 12:00 UTC
Type of Document:
Technical meeting report and discussion paper
Title:
Advanced Energy Design Guide for Multifamily Buildings: Achieving Zero Energy
Document type:
Peer review draft and review form
Series:
Advanced Energy Design Guide (AEDG)
Subject:
Zero energy multifamily building design
Organizations:
ASHRAE; AIA; IES; USGBC; U.S. DOE
Committee:
AEDG-MF Project Committee
Review stage:
90% Technical Refinement Draft
Review period:
February 22, 2020 – March 1, 2020
Submission deadline:
March 2, 2020, 12:00 PM EST
Submission method:
E-mail to [email protected]
Intended audience:
Peer reviewers and technical experts
Status:
Non-consensus document; not an ASHRAE standard or guideline
Contact information required:
Name, company/organization, phone number, e-mail address
Form sections:
General remarks; Specific remarks by chapter and line number
Year:
2026
Organization:
Chichester Cathedral
Position:
Assistant Verger
Location:
Chichester, UK
Application Deadline:
23 February 2026, 9:00am
Interview Date:
2 March 2026
Type of Document:
Job application form
Target Audience:
Job applicants
Requirements:
Right to work in the UK, Disclosure of unspent criminal convictions
Submission Method:
Email to [email protected]
Instructions:
Complete all sections including personal details, referees, education, employment history, supporting statement, and declaration