№ files_lp_4_process_1_50043
File format: docx
Character count: 59407
File size: 140 KB
Year:
2020
Event:
3GPP TSG-RAN WG4 Meeting #96-e
Type of document:
Meeting summary / email discussion report
Source:
Moderator (Apple Inc.)
Participants:
Nokia Japan, Apple Inc., NTT DOCOMO INC.
Agenda item:
4.2.2 FR2 UE RF requirements maintenance
Topics covered:
Regulatory Tx/Rx spurious emission limits, transmitter and receiver characteristics, WRC-19 impact, NS signaling structure
Document purpose:
Information and discussion summary
Relevant specifications:
NR_NewRAT_UE_RF_Part_2, TR38.817-01
Date of discussion:
August 17–28, 2020
Document format:
Electronic meeting summary
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Meeting:
3GPP TSG-RAN WG4 Meeting #96-e
Document number:
R4-20xxxxx
Agenda item:
7.3.5 & 7.3.6
Source:
Moderator (LG Electronics)
Title:
Email discussion summary for [96e][210] 5G_V2X_NRSL_RRM
Document for:
Information
Date:
17–28 Aug 2020
Working group:
TSG-RAN WG4
Related specifications:
38.133, 36.133
Related change requests:
R4-2010084, R4-2010085, R4-2011380, R4-2011053, R4-2011382, R4-2010037, R4-2010083, R4-2011054, R4-2011379
Companies involved:
LG Electronics, MediaTek, Huawei, HiSilicon, Qualcomm
Topics:
5G V2X NR sidelink RRM core requirements, performance requirements, interruption requirements, measurement accuracy, test cases
Communication format:
Electronic meeting and e-mail discussion
Technical scope:
Interruption to WAN, synchronization scenarios, LTE SL and NR SL switching, measurement accuracy, scheduling availability, test case planning
Year:
2020
Note:
Region / City
Document Type:
Meeting Summary
Author:
Moderator (Apple Inc.)
Year:
2020
Event:
3GPP TSG-RAN WG4 Meeting #96-e
Date:
17 August – 28 August 2020
Source:
Ericsson, T-Mobile US
Document type:
Technical Proposal
Standard:
TR 37.817-01-01
Agenda item:
10.1.2
Purpose:
Approval
Topics covered:
Carrier Aggregation configuration CA_n71(2A), channel bandwidths, UE co-existence, reference sensitivity
Frequency band:
n71
Technical area:
NR (New Radio), 5G
Authoring organization:
3GPP RAN4 Working Group
Year:
2020
Organization:
3GPP TSG RAN WG1
Document type:
Meeting report / Technical contribution
Source:
Moderator (NTT DOCOMO, INC.)
Agenda item:
7.2.12
Topic:
Aperiodic CSI-RS/TRS triggering with beam switching timing
Target audience:
RAN1 Working Group members
Date of meeting:
August 17–28, 2020
Decision status:
For discussion and decision
Reference documents:
R1-2004831, R1-2005162, R1-2005453
Year:
2025
Region / city:
Baku, Republic of Azerbaijan
Topic:
Telecommunication Development, ITU-D Projects, Resolutions Implementation
Document Type:
Official Report
Organization:
International Telecommunication Union (ITU)
Author:
Telecommunication Development Bureau
Target Audience:
ITU Member States
Period of validity:
2023–2025
Approval Date:
13 October 2025
Amendment Date:
Not provided
Year:
2020
Event:
TSG-RAN WG1 Meeting #102-e
Topic:
UL time and frequency synchronization for NR NTN
Document type:
Technical contribution / meeting report
Organization:
3GPP
Author:
Thales (moderator)
Contributors:
MediaTek, CATT, Ericsson, InterDigital, CMCC, ZTE, Apple, CAICT, Sony, LG Electronics
Target audience:
3GPP RAN1 working group members
Agenda item:
8.4.2
Sections:
Clarification on UE capability; UL timing synchronization; UL frequency synchronization; Serving satellite ephemeris; References
Scope:
NR NTN Rel-17 solutions
Date of meeting:
August 17–28, 2020
Meeting:
3GPP TSG-RAN WG4 Meeting #96-e
Document number:
R4-20xxxxx
Agenda item:
7.3.5 & 7.3.6
Source:
Moderator (LG Electronics)
Title:
Email discussion summary for [96e][210] 5G_V2X_NRSL_RRM
Document for:
Information
Date:
17–28 Aug 2020
Working group:
TSG-RAN WG4
Related specifications:
38.133, 36.133
Related change requests:
R4-2010084, R4-2010085, R4-2011380, R4-2011053, R4-2011382, R4-2010037, R4-2010083, R4-2011054, R4-2011379
Companies involved:
LG Electronics, MediaTek, Huawei, HiSilicon, Qualcomm
Topics:
5G V2X NR sidelink RRM core requirements, performance requirements, interruption requirements, measurement accuracy, test cases
Communication format:
Electronic meeting and e-mail discussion
Technical scope:
Interruption to WAN, synchronization scenarios, LTE SL and NR SL switching, measurement accuracy, scheduling availability, test case planning
Year:
2025
Region / city:
Baku, Republic of Azerbaijan
Topic:
Telecommunication Development
Document Type:
Administrative Document
Organization:
Telecommunication Development Bureau
Author:
Director, Telecommunication Development Bureau
Target Audience:
Conference participants
Action Period:
17–28 November 2025
Approval Date:
30 October 2025
Modification Date:
N/A
Organization:
3rd Generation Partnership Project (3GPP)
Group:
TSG RAN WG1
Meeting:
#102-e e-Meeting
Document Number:
R1-2007151
Agenda Item:
8.1.1
Source:
Moderator (Samsung)
Company:
Samsung
Title:
Moderator summary for multi-beam enhancement: EVM
Work Item:
Rel.17 NR FeMIMO
Frequency Range:
FR2 @ 30 GHz (baseline), applicable also to FR1
Simulation Type:
SLS (baseline), optional LLS
Scenarios:
Dense Urban, High Speed Train, Indoor
Channel Model References:
TR 38.802, TR 38.913, TR 38.901
Performance Metrics:
UE throughput CDF, average and 5% throughput, TCI state update signaling overhead, beam switching latency, RSRP distribution
Traffic Model:
Full buffer
UE Configuration:
Multi-panel UE (3 panels: left, right, back)
Antenna Configuration:
BS (4,8,2,2,2); UE (1,4,2)
Transmission Scheme:
Multi-antenna port transmission
Link Adaptation:
Based on CSI-RS
Intended Purpose:
Discussion and Decision
Year:
2025
Location:
Baku, Republic of Azerbaijan
Event:
World Telecommunication Development Conference 2025 (WTDC-25)
Organizing body:
Telecommunication Development Bureau
Conference body:
ITU-D
Document number:
WTDC-25/DT/1-E
Meeting:
Plenary Meeting
Date of document:
17 October 2025
Language:
English only
Document type:
Draft time management plan
Conference dates:
17–28 November 2025
Sessions included:
Plenary, High-Level Segment, WG-PL, COM1, COM2, COM3, COM4, COM5
Related events:
Global Youth Celebration, ITU-D 30+ Celebration Dinner, Host Country Welcome Reception
Status:
Evolving document updated regularly
Conference:
World Telecommunication Development Conference 2025
Organizing body:
International Telecommunication Union – Telecommunication Development Sector (ITU-D)
Bureau responsible:
Telecommunication Development Bureau
Meeting type:
Plenary Meeting
Document symbol:
WTDC-25/INF/1-E
Date of document:
12 November 2025
Conference venue:
Baku, Republic of Azerbaijan
Conference dates:
17–28 November 2025
Language:
English only
Priority area:
Action Plan, Regional Initiatives and ITU-D Study Group Questions
Related resolutions:
WTDC Resolutions 17 and 71 (Rev. Kigali, 2022); PP-22 Resolutions 169, 205 and 209 (Rev. Bucharest, 2022)
Subject:
Membership growth, diversification and engagement in ITU-D and the evolving role of the private sector
Reporting period:
January 2023 – August 2025
Target audience:
Member States, Sector Members, Associates, Academia, regulators and private sector representatives
Expected action:
WTDC invited to note the document
Meeting:
3GPP TSG-RAN WG4 Meeting #96-e
Working Group:
3GPP TSG-RAN WG4
Document Number:
R4-201xxxx
Agenda Items:
7.1.2; 7.1.2.1; 7.1.2.2; 7.1.1.3
Source:
Moderator (Qualcomm Incorporated)
Contributing Companies:
Qualcomm Incorporated; MediaTek Inc.; Apple Inc.; Skyworks Solutions Inc.; Ericsson; Huawei; HiSilicon
Related Contributions:
R4-2009934; R4-2009942; R4-2010273; R4-2010344; R4-2010497; R4-2010585; R4-2010586; R4-2010671; R4-2011330; R4-2011344; R4-2011345
Subject:
NR-U UE RF requirements
Frequency Bands Discussed:
5 GHz; 6 GHz; n46; n96; n97
Technical Scope:
TX and RX requirements; MPR; A-MPR; ACLR; CA bandwidth classes; LO leakage; mask measurement procedures
Document For:
Information
Date:
17–28 August 2020
Format:
Electronic Meeting Summary
Year:
2020
Meeting:
3GPP TSG-RAN WG4 Meeting #96-e
Format:
Electronic Meeting
Dates:
August 17–28, 2020
Agenda item:
7.1.2
Source:
Moderator (Qualcomm Incorporated)
Document type:
Meeting summary
Purpose:
Information
Subject:
NR-U UE RF requirements and related Change Requests
Related specifications:
3GPP Rel-16
Organizations involved:
Qualcomm Incorporated, Nokia, MediaTek, Charter Communications Inc, Huawei, AT&T, Intel, LG Electronics, Ericsson
Approval process deadline:
5pm UTC September 4, 2020
Technical topics:
Channelization, REFSENS for 6 GHz band, A-MPR, SU for 20 MHz with 60 kHz SCS, in-band and out-of-band blocking, transmit ON/OFF time mask, carrier aggregation
Regulatory reference:
FCC NPRM R&O
Standardization context:
Coordination considerations with IEEE and WiFi Alliance
Year:
2020
Meeting:
3GPP TSG RAN WG1 #102-e
Agenda item:
8.11.1
Title:
FL summary#1 for AI 8.11.1 SL evaluation methodology update for power saving
Document number:
R1-20xxxxxe
Source:
Moderator (LG Electronics)
Organization:
3GPP TSG RAN WG1
Document type:
Meeting contribution
Purpose:
Discussion and decision
Discussion format:
Email discussion
Submission period:
August 17–28, 2020
Related specification:
TR38.840
Topic:
Sidelink evaluation methodology and power consumption model assumptions
Companies involved:
NTT DOCOMO; LG Electronics; Fujitsu; vivo; Ericsson; Huawei; HiSilicon; Apple; Futurewei
Technical scope:
Reference configuration, SCS, system bandwidth, PSCCH symbols, modulation order, TX/RX antenna ports
Year:
2020
Organization:
3GPP TSG RAN WG1
Meeting Number:
102-e
Source:
Moderator (Samsung)
Document Type:
Meeting Report / Technical Discussion
Agenda Item:
8.7.1.2
Topics Covered:
TRS/CSI-RS for idle/inactive UEs, clarification proposals, RS types, functional discussion
Phase:
Phase II discussion
Contributors:
Huawei, HiSilicon, Panasonic, DOCOMO
Discussion Period:
August 17–28, 2020
Decision Status:
For discussion/decision
Target Audience:
3GPP working group members
Year:
2020
Event:
3GPP TSG-RAN WG2 Meeting #111-e
Meeting Format:
Electronic meeting
Meeting Period:
Aug. 17 – Aug. 28, 2020
Organization:
3rd Generation Partnership Project (3GPP)
Working Group:
TSG-RAN WG2
Session Chair Organization:
InterDigital
Document Type:
Meeting report and technical discussion summary
Release:
Rel-16
Technical Topics:
NR-U (NR-based access to unlicensed spectrum), Power Saving, 2-step RACH, IIoT, Small Data
Specifications Referenced:
3GPP TS 38.300, 38.321, 38.331
Work Item:
NR_unlic-Core
Contributing Companies:
Nokia, Ericsson, Qualcomm, Huawei, ZTE, Samsung, Mediatek, LG Electronics, ASUSTeK, Vivo, Google, CATT, Intel, Lenovo, Sanechips, Nokia Shanghai Bell
Document Identifier:
R2-2008124
Related Discussions:
Email discussions AT111e [501]–[507]
Primary Activities:
Review of change requests (CRs), clarification of specifications, coordination of email discussions, and documentation of agreements
Year:
2020
Meeting:
3GPP TSG-RAN2 Meeting #111-e
Dates:
17–28 August 2020
Agenda Item:
6.16 NR Other
Organization:
3rd Generation Partnership Project (3GPP) TSG-RAN2
Source Organization:
Ericsson
Contributing Companies:
Qualcomm; OPPO; LG Electronics
Document Type:
Technical meeting contribution / discussion report
Technical Domain:
5G NR MAC and RRC protocol specifications
Related Specifications:
3GPP TS 38.321; 3GPP TS 38.331; 3GPP TS 38.213
Topic:
Secondary DRX corrections and clarification of DRX group behavior
Purpose:
Discussion and decision on proposed Change Requests (CRs)
Scope:
Review of CRs R2-2007062, R2-2007370, R2-2007486, R2-2007258, R2-2007890
Discussion Method:
Email discussion in two phases (agreement on parts, then CR approval)
Phase 1 Comment Deadline:
20 August 2020, 12:00 CEST
Phase 2 Comment Deadline:
27 August 2020, 12:00 CEST
Subject Area:
Discontinuous Reception (DRX) behavior with multiple DRX groups in NR
Year:
2025
Location:
Prague, Czech Republic
Topic:
6G sensing and ISAC study
Document type:
Meeting summary / Technical contribution
Organization:
3GPP TSG-RAN WG4
Authors:
Moderator (ZTE), Samsung, CMCC, CATT
Agenda item:
8.1
Use cases:
UAVs, humans, vehicles, AGVs
Technical focus:
Sensing performance, interference analysis, TDM/FDM methods, KPI evaluation
Frequencies considered:
FR1, FR2
Sensing modes:
Monostatic, Bistatic, Multistatic
Year:
2024
Location:
Hefei, Anhui, China
Topic:
NR duplex evolution, Sub-band Full Duplex (SBFD)
Document type:
Meeting report / Summary
Organization:
3GPP TSG-RAN WG4
Author:
Moderator (Samsung)
Intended audience:
RAN working group participants
Agenda item:
6.20.4
Meeting number:
112bis
Frequency range:
FR1 and FR2-1
Related work items:
RP-234035, RP-240789, R4-2413514
Year:
2024
Location:
Maastricht, Netherlands
Meeting:
3GPP TSG-RAN WG4 #112
Agenda item:
8.1.3
Source:
Moderator (Samsung)
Document type:
Technical meeting summary
Subjects:
High Power UE (HPUE), Carrier Aggregation (CA), NR_ENDC, PC1.5, intra-band and inter-band UL CA, RF requirements
Contributors:
Apple, Samsung, Skyworks Solutions Inc., Meta Ireland, Ericsson, LG Electronics, Xiaomi, Nokia, vivo, Qualcomm, Huawei, ZTE Corporation, CHTTL, OPPO, NTT DOCOMO
Target audience:
3GPP participants and related technical stakeholders
Period:
19–23 August 2024
Date of creation:
2024-08-19