№ files_lp_4_process_3_064059
File format: docx
Character count: 3696
File size: 47 KB
Official procurement document detailing the submission requirements, specifications, and administrative rules for bidding on an air release valve by the Zamboanga City Water District under a small value negotiated procurement.
Year:
2021
Region / City:
Zamboanga City
Document Type:
Request for Quotation
Procurement Type:
Negotiated Procurement (Small Value)
Prepared by:
Zamboanga City Water District
Responsible Committee:
Bids and Awards Committee
Delivery Period:
30 Calendar Days upon receipt of NTP/P.O.
Warranty Period:
3 months for expendable supplies
Price Validity:
120 Calendar Days
Approved Budget for the Contract (ABC):
PHP 20,892.00
Submission Deadline:
September 23, 2021, 2:00 P.M.
Contact:
BAC Secretariat, [email protected], Tel. (062) 991-1556 local 8127
Required Documents:
Mayor’s/Business Permit, Philgeps Registration, Omnibus Sworn Statement
Item Specification:
25mmØ Air Release Valve, Cast Iron body and cover, ISO 9001 certified manufacturer
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Date and Time of Report:
13 January 2022, 6PM
Incident Date:
16 November 2021
Region:
Region IX
Provinces:
Zamboanga del Sur; Zamboanga Sibugay
Hazard Type:
Flooding
Cause of Incident:
Intertropical Convergence Zone (ITCZ)
Affected Population:
11,381 families; 56,727 persons
Affected Barangays:
65
Displaced Population:
1,029 families cumulatively; 457 families currently displaced
Damaged Houses:
1,019 (2 totally damaged; 1,017 partially damaged)
Cost of Assistance Provided:
₱6,196,103.62
Implementing Agency:
Department of Social Welfare and Development (DSWD)
Field Office:
DSWD Field Office IX
Prepared by:
Aaron John B. Pascua
Released by:
Leslie R. Jawili
Source Agencies:
DSWD-DROMIC; DSWD-DRMB; DSWD-NRLMB; DOST-PAGASA
Document Type:
Disaster situation report
Organization:
Zamboanga City Water District
Document type:
Request for Quotation Form
Procurement method:
Negotiated Procurement (Small Value)
City:
Zamboanga City
Country:
Philippines
Prepared date:
July 9, 2021
PR number:
21-0054
PR date:
March 24, 2021
Submission deadline:
July 15, 2021, 2:00 P.M.
Procurement subject:
Lumber, hardware materials, C.I. materials, G.I. materials, brass materials, air release valve, PE tubing and pressure gauge
Delivery period:
30 calendar days upon receipt of Purchase Order
Warranty period:
3 months for expendable supplies after acceptance
Price validity:
120 calendar days
Delivery location:
Property Section, ZCWD Motorpool, Pasonanca, Zamboanga City
Payment terms:
No COD
Procurement regulation reference:
Republic Act 9184 and its Implementing Rules and Regulations
Committee:
Bids and Awards Committee
Committee chairperson:
Valerie Gay Y. Gutierrez
Year:
2021
Region / City:
Zamboanga City
Document Type:
Procurement Request / Quotation Form
Issuing Organization:
Zamboanga City Water District
Date Prepared:
05/26/2021
Purchase Request Number:
21-0056
Bid Submission Deadline:
06/01/2021, 2:00 P.M.
Delivery Period:
15 Calendar days upon receipt of Purchase Order
Approved Budget Cost:
PHP 236,542.22
Payment Terms:
NO COD
Warranty Period:
3 Months for expendable supplies
Contact Information:
Tel. (062) 991-1556-57, Email: [email protected]
Additional Requirements:
Mayor’s/Business Permit, Philgeps Registration, compliance with RA 9184
Year:
2021
Region / City:
Zamboanga City, Philippines
Document Type:
Request for Quotation (RFQ)
Procurement Type:
Negotiated Procurement (Small Value)
Organization:
Zamboanga City Water District
Prepared by:
Michael Angelo M. Carbon
Contact Information:
Tel. (062) 991-1556-57, Email: [email protected]
Purchase Request Number:
21-0102 (Lot 1)
Date Prepared:
09/29/2021
Submission Deadline:
10/05/2021, 2:00 PM
Delivery Period:
30 calendar days upon receipt of Purchase Order
Warranty Period:
3 months for expendable supplies
Approved Budget for Contract (ABC):
PHP 3,927.00
Required Bid Documents:
Mayor’s/Business Permit, Philgeps Registration, Omnibus Sworn Statement
Delivery Point:
Property Section, ZCWD Motorpool, Pasonanca, Zamboanga City
Year:
2021
City:
Zamboanga City
Country:
Philippines
Organization:
Zamboanga City Water District
Department:
Bids and Awards Committee
Document Type:
Request for Quotation Form
Procurement Method:
Negotiated Procurement (Small Value Procurement)
PR Number:
21-0102 (Lot 5)
PR Date:
August 19, 2021
Date Prepared:
September 29, 2021
Submission Deadline:
October 05, 2021, 2:00 P.M.
Subject:
Procurement of PVC Materials
Items Included:
PVC bends and PVC pipes Class 150 with rubber ring
Approved Budget Cost (ABC):
P 64,303.26
Delivery Period:
30 Calendar Days upon receipt of Notice to Proceed or Purchase Order
Warranty Period:
3 months for expendable supplies after acceptance
Price Validity:
120 Calendar Days
Delivery Location:
Property Section, ZCWD Motorpool, Pasonanca, Zamboanga City
Payment Terms:
No COD
Contact Office:
BAC Secretariat
Contact Telephone:
(062) 991-1556 local 8127
Contact Person:
Mr. Aaron O. Mas
Prepared By:
Michael Angelo M. Carbon
Position:
Chairperson, Bids and Awards Committee
Year:
2016
Region / City:
Dapitan City, Zamboanga del Norte
Subject:
Construction, Bidding
Document Type:
Invitation to Bid
Author:
Philippine Ports Authority, PMO-Zamboanga del Norte
Target Audience:
Contractors, Bidders
Period of Validity:
April 18, 2016 - May 11, 2016
Date of Approval:
April 18, 2016
Amendment Date:
N/A
Scope:
Construction of port office and facilities
Completion Time:
240 Calendar Days
Bid Security:
Required
Publications:
Philippine Star, April 18, 2016
Additional Notes:
Pre-Bid Conference on April 26, 2016
Note:
Year
Topic:
Valve Exercising, Water Distribution System
Document Type:
Standard Operating Guideline
Organization / Institution:
American Water Works Association (AWWA)
Target Audience:
Water utilities, maintenance staff
Year:
2016
Region / City:
Livermore, CA
Topic:
Contracting, Task Orders, VA Services
Document Type:
Proposal Request
Institution / Organization:
Department of Veterans Affairs
Author:
Contracting Specialist/Officer, Ferdinand Gawaran
Target Audience:
Contractors holding MATOC contracts with VISN 21
Effective Period:
March 9, 2016 (date of site visit and proposal conference)
Approval Date:
March 9, 2016
Date of Changes:
None
Year:
2026
Region / city:
N/A
Topic:
Valve Outlets for Various Gases
Document Type:
Technical Listing
Organization / Institution:
Compressed Gas Association
Author:
N/A
Target Audience:
Industries dealing with gas supply and safety standards
Period of validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Note:
Context description
Year:
2022
Region / City:
Not specified
Subject:
Cardiology
Document Type:
Standard Operating Procedure
Organization / Institution:
Cardio-Respiratory Department
Author:
Not specified
Target Audience:
Cardio Respiratory Department, Cardiology subspeciality
Period of Effect:
From March 2022
Approval Date:
16th March 2022
Date of Issuance:
March 2022
Next Review Date:
March 2024
Note:
Year
Context:
Technical specifications for a bypass pump control valve including its components, operation, and maintenance requirements.
Note:
Year
Approvals:
UL – Underwriters Laboratories Listed, File/Control Number: EX16369. Special System Water Control Valves, Deluge Type (VLFT).
Quality Assurance:
The control valve shall be tested prior to shipment. The standard test shall include a functional stroke test and pressure and leak test of valve body, seat, fitted pilots and accessories. The control valve shall be covered by a minimum three (3) year warranty against defects in materials and workmanship.
Main Valve:
The main valve shall be a Singer 106-PG-UL single chamber, diaphragm actuated, full port model.
Pilot Controls:
The booster pilot shall be a non-adjustable, normally open, Singer Model 82-PR-UL pilot.
Context:
Technical specifications and details for the operation and maintenance of the Singer Model 106–EPDV A-10506A Electric/Pneumatic Operated Deluge Valve, including construction materials, approvals, and maintenance requirements.
Year:
2022
Note:
Region / city
Topic:
Nasal valve collapse, radiofrequency treatment
Document type:
Medical Procedure Description
Organization / institution:
HERC
Target audience:
Medical professionals
Approval date:
November 2022
Contextual description:
A medical document outlining the procedure code 30469 for repairing nasal valve collapse using low-energy, temperature-controlled radiofrequency treatment, detailing evidence and payer policies.
Year:
2017
Manufacturer:
Xylem Inc.
Product Model:
CB, MC
Component Material:
Lead-free brass, 304 Stainless Steel
Pressure Rating:
300-400 PSIG
Temperature Range:
-4°F to 250°F (-20°C to 121°C)
Certification:
NSF/ANSI-372, AB1953, CSA
Applicable Regulations:
Vermont 152S, Maryland House Bill HB372, Senate Bill S.3874
Installation Instructions:
Manufacturer’s guidelines
Maintenance:
Requires submittal of maintenance materials
Warranty:
Minimum $5,000,000 product liability insurance
Related Standards:
ANSI, ISO
Target Audience:
HVAC professionals
Period of Use:
Ongoing
Date of Approval:
January 2017
Description:
Technical specifications for the Bell & Gossett Circuit Setter Plus calibrated balance valve Model CB and Model MC, including installation and maintenance guidelines.
Year:
2021
Region / city:
International
Theme:
Pressure equipment, safety valves
Document type:
Technical datasheet
Organization / institution:
TÜV Internacional, Grupo TÜV Rheinland
Author:
Not specified
Target audience:
Industry professionals, engineers
Period of validity:
Indefinite
Approval date:
Not specified
Date of amendments:
Not specified
Year:
Not specified
Manufacturer:
VAG USA, LLC
Model:
GA Industries CHECKtronic® Pump Control Valve GA-CKTR-SPEC Rev B
Type of document:
Technical specification
Material standards:
ASTM A126 Class B, ASTM A536 Grade 65-45-12, 316 stainless steel, UHMWPE
Pressure rating:
Class 125 (3”-12”: 200 PSI, 14”-24”: 150 PSI), Class 250 (300 PSI)
Actuation:
Multi-turn electric motor actuator meeting AWWA C542
Options:
Externally adjustable spring, controlled closure upon power failure
Components:
Main valve, electric motor actuator, SPDT limit switch, manual override
Assembly:
Factory assembled and tested
Quality certification:
ISO-9001
OMB Control Number:
2137-0631
Regulatory Framework:
Paperwork Reduction Act; 49 CFR 192.383(e)(4)
Issuing Authority:
PHMSA, Office of Pipeline Safety (PHP-30)
Responsible Agency:
Federal agency overseeing pipeline safety
Document Type:
Regulatory notice and customer notification language
Subject:
Right to request installation of an excess flow valve (EFV)
Applicability:
Natural gas customers with new, replaced, or existing service lines
Estimated Burden:
Approximately 1 hour per response
Mandatory Status:
Responses to this information collection are mandatory
Submission Address for Comments:
Information Collection Clearance Officer, PHMSA, 1200 New Jersey Avenue, SE, Washington, D.C. 20590
Year:
2023
Region / City:
Liverpool, UK
Topic:
Veterinary Cardiology
Document Type:
Research Article
Organization / Institution:
University of Liverpool, Institute of Veterinary Science
Authors:
Siddharth Sudunagunta, Julie Hamilton-Elliott, Joanna Dukes-McEwan
Target Audience:
Veterinary professionals, researchers in veterinary cardiology
Period of Action:
2010-2018
Date of Approval:
N/A
Date of Amendments:
N/A
Year:
2021
Region / City:
Australia
Topic:
Transcatheter Mitral Valve Repair (TMVr)
Document Type:
Legislation
Organization / Institution:
Health Insurance (Section 3C General Medical Services—Transcatheter Mitral Valve Repair) Determination
Author:
Medical Services Advisory Committee (MSAC)
Target Audience:
Interventional cardiologists, cardiothoracic surgeons, healthcare providers
Period of Action:
From 01 July 2021
Approval Date:
01 July 2021
Date of Changes:
01 July 2021
Manufacturer:
Honeywell
Product Family:
VBN / VBF / VB6 Control Ball Valves
Section:
23 09 00
Division:
Instrumentation and Control for HVAC
Document Type:
Technical specification
Application:
HVAC systems
Valve Types:
2-Way, 3-Way, 6-Way Control Ball Valves
Valve Sizes:
½ inch to 6 inches
Connection Type:
Threaded (fNPT), ANSI Class 125 flanged
Pressure Ratings:
Up to 600 psi depending on model
Temperature Rating:
Up to 250°F (121°C)
Standards:
ISO 9001, ANSI/ASME Class IV, UL Recognized, CSA Certified
Control Types:
Two-position, floating, proportional (2–10 Vdc, 4–20 mA)
Basis-of-Design:
Honeywell VBN / VBF / VB6
Submission Requirements:
Substitution Request Form with third-party flow testing documentation
Cycle Life:
Minimum 60,000 full-stroke cycles (proportional); 100,000 cycles (two-position)