№ files_lp_3_process_9_51179
File format: docx
Character count: 3237
File size: 59 KB
Official administrative review form establishing the required information, assessment criteria, and authorization process for independent evaluation of minor air traffic management equipment modifications by the Military Aviation Authority.
Document Title:
Air Traffic Management Equipment Minor Modification Review
Form Number:
Form 1430
Subject:
Air Traffic Management Equipment Minor Modifications
Related Regulation:
RA 3134
Applicable Standard:
DEF STAN 00-972
Responsible Authority:
Military Aviation Authority (MAA) Certification Division
Sector:
Air Traffic Management
Document Type:
Official Review and Approval Form
Scope:
Minor Modifications Not Subject to Release into Service Process
Sections:
Project Reference; Points of Contact; Modification Details; Authority for Change
Approval Authorities:
Crown Servant Engineering Authority; MAA SME; Release to Service Authority
Submission Method:
Email Submission
Contact Email:
[email protected]
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
5 Sept 2013
Location:
Lisbon
Event Type:
Workshop
Organizers:
Sébastien Peyrard (Chair), Angela Dappert (Minutes)
Participants:
Mark Jordan, Stina Degerstedt, Eld Zierau, Tamara Leuenberger, Anna Henry, Kakha NADIRADZE, Courtney C. Mumma, Tsutomu Shimura, Rui Castro, Thomas Bähr, Juha Lehtonen, Helena Patrício, Beth Delaney, Janet Delve, Inge Hofsink, Hélder Silva, David Allen, Pauline Sinclair, Kathryn Cassidy, Eduardo Pablo Giordanino, Maria Patricia Prada, Titia van der Werf, Eliska Pavlaskova, Tomasz Parkola, Rafael Antonio, Walter Allasia, David Anderson, Angela Di Iorio
Topic:
PREMIS implementation and updates
Organizational Units:
National Library of Sweden, National Library of France, University of Bern, Tate, Artefactual Systems, OCLC, The Royal Library of Denmark, University of Buenos Aires, TIB, CSC - IT Center for Science Ltd.
Preservation Models Discussed:
PREMIS 3.0, PREMIS Data Model, PREMIS OWL ontology
Target Audience:
Digital preservation professionals
Duration:
14:30 to 19:30
Language:
English
Year:
2024
Region / City:
Online
Theme:
Committee reports, updates, conference, finances, membership
Document Type:
Meeting Minutes
Organization:
APCSW
Author:
Committee Members
Target Audience:
Members of APCSW
Effective Period:
March 8th, 2024
Approval Date:
March 8th, 2024
Changes Date:
None
Year:
2026
Region / City:
Northeast Texas
Subject:
Welding
Document Type:
Course Syllabus
Institution:
Northeast Texas Community College
Author:
Braden Jones
Target Audience:
Students enrolled in WLDG-1430
Period of Validity:
Spring 2026
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014
Organization:
U.S. Department of Veterans Affairs
Office:
Strategic Acquisition Center
Type of Document:
Request for Information (RFI) Amendment
Solicitation Number:
VA119-14-I-0190
Amendment Number:
A00001
Response Deadline:
June 27, 2014, 12:00 PM EST
Contact Person:
Lance Belcher
Contact Email:
[email protected]
Additional Contact:
Shirelle Taliaferro, [email protected]
Survey Management:
Monterey Consultants, Inc.
Survey URL:
www.mcix.com/ECOMM
Location of Performance:
Fredericksburg, VA
Year:
2017
Region / City:
North Little Rock, AR, USA
Type of Document:
Contract Amendment / Modification
Administered By:
Department of Veterans Affairs, Chief, A&MM (90C/NLR)
Issued By:
Department of Veterans Affairs, Central Arkansas Veterans HCS
Contract Number:
598-17-105
Solicitation Number:
VA256-17-B-0485
Effective Date:
08-25-2017
Purpose:
Add specifications and drawings, update bid schedule
Project Title:
Correct Legionella Problems with Modifications to the Water Distribution System
Delivery Schedule:
See attached documents
Contractor:
[Name not specified in the document]
Year:
2013
Region / City:
Hines, IL, United States
Document Type:
Contract Amendment / Modification
Issuing Agency:
Department of Veterans Affairs
Contracting Officer:
Patricia Gibson-Anderson
Contractor:
Not specified
Effective Date:
August 19, 2013
Proposals Due Date:
September 11, 2013
Subject:
Great Lakes TCA Site Visit Responses and Documentation
Attached Documents:
Questions and answers from TCA site visit August 30, 2013; TCA May–July 2013; TCA detailed formulary; 1-dimensional barcode
Year:
2017
Region / City:
Eatontown, NJ
Subject:
Technology Acquisition
Document Type:
Performance Work Statement (PWS)
Organization / Institution:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Contractors and vendors in technology and IT services
Period of Validity:
Not specified
Approval Date:
May 19, 2017
Date of Changes:
Not specified
End Date:
Not specified
Additional Information:
Task Order PWS Version 1.0
Year:
2023
Region / city:
Durham
Topic:
Public Rights of Way, Footpath Diversion
Document Type:
Order
Issuing Authority:
Secretary of State for Environment, Food and Rural Affairs
Author:
Claire Tregembo BA(Hons) MIPROW
Target Audience:
Local Authorities, Stakeholders in Urban Planning, Public Rights of Way Users
Effective Period:
Not specified
Approval Date:
16 January 2026
Modification Date:
17 November 2023
Year:
2013
Region / City:
Washington, D.C.
Topic:
Foreign-Trade Zones (FTZ) Application
Document Type:
Instruction Sheet
Agency / Institution:
U.S. Department of Commerce, International Trade Administration
Author:
FTZ Staff
Target Audience:
Corporations and grantees applying for FTZ designation
Period of Action:
N/A
Approval Date:
March 2013
Amendment Date:
N/A
Note:
Study Summary 1.1 Please provide a brief summary of the study in the table below. A complete description of the study with detailed information should be provided in the body of the protocol. For sections not applicable to the study, mark them as N/A. Study Title Study Design Primary Objective/Purpose Secondary Objective(s)/Purposes Research Intervention(s) ClinicalTrials.gov NCT # Study Population Sample Size Study Duration for individual subjects Study Specific Abbreviations/ Definitions
Background 3.1 Provide the scientific or scholarly background for, rationale for, and significance of the research based on the existing literature and how will it add to existing knowledge. :
this section should be limited to only information directly related to the research questions and objectives. Do not include your full dissertation proposal. 3.2 Describe any relevant preliminary data (e.g. pilot data).
Procedures Involved 5.1 Describe and explain the study design. 5.2 Please select the methods that will be employed in this study (select all that apply):
☐ Audio/Video Recording ☐ Psychophysiological Recording ☐ Behavioral Interventions ☐ Record Review - Educational ☐ Behavioral Observations and Experimentations ☐ Record Review - Employee ☐ Deception ☐ Record Review- Medical ☐ Focus Groups ☐ Record Review - Other ☐ Interviews ☐ Specimen Collection or Analysis ☐ Investigational Medical Device – (e.g. Medical Mobile Applications) ☐ Surveys and/or Questionnaires ☐Psychometric Testing ☐ Other Social-Behavioral Procedures Provide a description of all research procedures being performed and when they are performed. (Upload any surveys, questionnaires, interview scripts, focus group scripts, debriefing scripts, psychometric tests, stimulus materials, intervention manuals, and data collection forms on the Local Site Documents page in the IRB application.) 5.3 Describe the procedures or interventions that are going to be conducted as part of the research project, but that would have been conducted anyway, even if the research was not occurring (i.e. standard of care procedures, activities that would occur in a classroom). 5.4 Describe the procedures performed to lessen the probability or magnitude of risks of items selected in 5.2.5. 5 If accessing or collecting existing data, describe: The data that will be collected during the study (e.g. demographics, medical history, etc.). Attach the data capture sheet(s) on the Local Site Documents page in the IRB application. How the data will be obtained, including how you have the authority to access the data. The source or location of the data (e.g. USF Epic, TGH Epic, Hillsborough County School records, CANVAS records, publicly available databases, etc.). 5.6 If collecting and/or analyzing biological specimens, describe: How the biological specimens will be or have been collected. How the biological specimens will be stored. How long the biological specimens will be stored. How the biological specimens will be used. The laboratories that will be used. Whether the collected biological specimens will undergo genetic testing. If so, indicate if this study is part of a Genome Wide Association Study (GWAS) and whether the data will be forwarded to the NIH dbGaP. 5.7 If there are plans for long-term follow-up (once all research related procedures are complete), what data will be collected during this period.
Data and Specimen Storage for Future Research 6.1 If data or specimens will be banked for future research studies, describe where the data or specimens will be stored, how long it/they will b:
the process to request a release, approvals required for release, who can obtain data or specimens, and the data to be provided with specimens.
Year:
2014
Region / City:
All States
Subject:
Loan Modification Agreement
Document Type:
Legal Agreement
Author:
Fannie Mae
Target Audience:
Lenders, Borrowers
Effective Period:
Ongoing
Approval Date:
1/01 (rev. 4/14)
Modification Date:
6/06 (posted 10/3/06)
Context:
A detailed legal document outlining the requirements and amendments for modifying a loan agreement in accordance with various conditions and government programs.
Note:
Year
Subject:
Medicaid
Document Type:
Notice
Organization:
NCF/DHB
Target Audience:
Caseworkers, County Staff
Context:
This document provides guidance on generating, handling, and updating the DSS-8110 Notice of Modification, Termination, or Continuation of Public Assistance in the NC FAST system.
Note:
Year
Subject:
Family Law, Divorce, Custody, Child Support, Court Orders
Document Type:
Instructional Guide
Authority / Institution:
Wisconsin Court System
Target Audience:
Individuals seeking to modify court orders related to family law
Year:
2025
Region / city:
Inter-American Telecommunication Commission (CITEL)
Topic:
Radiocommunication, International Telecommunication Union (ITU), World Radiocommunication Conference (WRC)
Document type:
Proposal
Organization / institution:
Inter-American Telecommunication Commission (CITEL)
Author:
N/A
Target audience:
ITU Member States, Radiocommunication Sector Members
Period of validity:
N/A
Date of approval:
N/A
Date of amendments:
N/A
Note:
Year
Year:
2021
Region / City:
Massachusetts, USA
Theme:
Home modification, accessibility, disability support
Document Type:
Application guide, informational brochure
Agency:
Massachusetts Legislature
Author:
Not specified
Target Audience:
Homeowners, landlords, individuals with disabilities or limitations
Duration:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Singapore
Topic:
Risk Management, Safety Procedures
Document Type:
Procedure
Organization:
SMRT
Author:
Not specified
Target Audience:
Not specified
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Date:
April 20, 2016
Location:
Ontario County, New York, USA
Type of document:
Meeting minutes
Organization:
Ontario County Traffic Safety Board (TSB)
Participants:
Board members, TSB partners, guests
Topics discussed:
Board membership changes, mission statement, traffic safety initiatives, public service announcements, funding requests, law enforcement updates, youth programs, safety campaigns, upcoming events
Programs mentioned:
STOP-DWI, R.E.A.L. CHOICES, No Empty Chair, Safe Stop, Click it or Ticket
Incidents reported:
DWI arrests, distracted driving fatalities, underage drinking, drug possession
Next meeting:
August 10, 2016
Year:
2016
Region / City:
Tasmania
Subject:
Traffic Management
Document Type:
General Specification
Organization / Institution:
Tasmania State Growth
Author:
RB (MTE)
Target Audience:
Contractors, Traffic Management Personnel
Period of Validity:
Ongoing
Approval Date:
March 2016
Amendment Date:
June 14, 2013