№ files_lp_4_process_2_55308
File format: docx
Character count: 5256
File size: 620 KB
Strategic planning document defining long-term land use, zoning, and built form controls for development within a central business district.
Year:
2017–2020
Region / City:
Chatswood CBD, Willoughby
Country:
Australia
Document Type:
Urban planning strategy
Authority:
Willoughby City Council
Approval Date:
26 June 2017
Finalisation Date:
January 2018
Partial Endorsement Date:
9 August 2019
Full Endorsement Date:
9 July 2020
Adoption Date:
14 September 2020
Subject:
Urban development, land use, zoning, building height, floor space ratio
Planning Frameworks Referenced:
Local Strategic Planning Statement (LSPS); Local Housing Strategy (LHS); Willoughby LEP 2012; Environmental Planning and Assessment Act 1979
Key Zones:
B3 Commercial Core; B4 Mixed Use
Key Parameters:
Maximum height 90m in B4 areas; FSR up to 6:1; minimum commercial FSR 1:1
Supporting Studies:
Transport and traffic methodology by Arup; economic analysis by SGS; urban design study by GMU; heritage study by Weir Phillips Heritage
Responsible Departments:
Department of Planning; Department of Transport
Purpose:
Guide development and growth in Chatswood CBD over 20 years
Scope:
Land use planning, infrastructure provision, urban design, heritage considerations
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / city:
Not specified
Topic:
Public Health Specialty Training
Document type:
Assessment form
Institution:
Faculty of Public Health (FPH)
Author:
Not specified
Target audience:
Public Health registrars, Supervisors
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Note:
Year
Topic:
Clinical Assessment
Document Type:
Form
Organization / Institution:
NSHCS
Target Audience:
Trainees and Assessors
Context:
A document used for assessing clinical practice and decision-making of trainees in healthcare settings through a structured evaluation process.
Year:
2022
Location:
Montreal, Canada
Meeting:
Fifteenth meeting of the Conference of the Parties to the Convention on Biological Diversity (Part II)
Agenda item:
12A – Resource mobilization
Document symbol:
CBD/COP/15/L.29
Issuing body:
Conference of the Parties to the Convention on Biological Diversity
Document type:
Draft decision
Related framework:
Post-2020 Global Biodiversity Framework
Relevant articles:
Articles 11, 20 and 21 of the Convention
Adopted strategy:
Strategy for Resource Mobilization (annex I)
Implementation phases:
Intermediate phase (2023–2024); Medium-term phase (2025–2030)
Associated mechanisms:
Global Environment Facility; national biodiversity strategies and action plans
Year:
Not specified
Region / City:
Not specified
Topic:
Clinical reasoning, professional judgment, assessment
Document Type:
Guidance, Template
Organization:
Not specified
Author:
Not specified
Target Audience:
Clinical professionals, Physician Assistants, Clinical Supervisors
Period of Effect:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Context:
Guidance document providing a structured framework for conducting case-based discussions (CBD) aimed at assessing clinical judgment and capabilities in clinical practice.
Year:
2023
Region / City:
In-house
Topic:
Residual solvents testing
Document Type:
Standard Operating Procedure
Organization:
Internal laboratory
Author:
Not specified
Target Audience:
Laboratory analysts, supervisors
Effective Period:
Ongoing
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Contextual Description:
A text discussing the pros and cons of developing retail spaces outside the central business district.
Document type:
Assessment form
Field:
Plastic Surgery Training
Purpose:
Workplace-based assessment and reflective learning
Training level:
Higher Surgical Training (HST)
Participants:
Surgical trainee and assessor
Clinical context:
In-patient or out-patient clinical cases
Clinical categories:
Malignancy / Trauma / Emergency / Complications / Congenital / General
Assessment domains:
Medical record keeping; Clinical assessment; Diagnostic skills and knowledge base; Management and follow-up plan; Clinical judgement and decision making; Communication and team working skills; Leadership skills; Reflective practice and writing; Professionalism
Rating scale:
N (Not observed); I (Improvement required); S (Satisfactory); A (Above Average); E (Excellent); NA (Not applicable)
Training documentation requirement:
At least one completed form every 6 months
Submission schedule:
January and July
Responsible body:
College Secretariat
Associated process:
Half-yearly trainee assessment
Required information fields:
Trainee name; Parent hospital; Current hospital; Year of training; Training period; Procedure name; Case setting; Clinical problem; Hospital or OPD number; Case difficulty; Assessor name; Institutional email; Signatures; Observation and feedback time
Mandatory component:
Verbal and written feedback by assessor
Year:
2017–2020
Region:
Northern Territory, Australia
Type of document:
Intergovernmental Project Agreement
Topic:
Environmental rehabilitation and site management
Organizations:
Commonwealth of Australia; Northern Territory Government
Author(s):
Not specified
Stakeholders:
Traditional Aboriginal Owners (Kungarakan and Warai peoples)
Project stage:
2A
Financial contribution:
AUD 10.048 million (excluding GST)
Purpose:
Rehabilitation and maintenance of the former Rum Jungle Mine Site
Legal framework:
Intergovernmental Agreement on Federal Financial Relations (IGA FFR)
Reporting:
Northern Territory to report against agreed project milestones
End date:
30 June 2020
Key outputs:
Finalised rehabilitation design, costings, post-rehabilitation planning, site management, environmental monitoring, repairs at Rum Jungle Creek South, stakeholder engagement
Document status:
Draft (Zero Draft)
Date:
01/04/17
Country:
Sierra Leone
Region:
West Africa
Type of document:
Strategic plan
Subject:
Establishment and development of a National Public Health Agency
Institution concerned:
Sierra Leone National Public Health Agency (NPHA)
Government body:
Ministry of Health and Sanitation
Time frame:
2017–2020
Legal framework referenced:
Public Health Ordinance 1960 (as amended)
Related policies:
National Health Strategic Plan 2010–2015; Free Health Care 2010; Basic Package of Essential Health Services 2010; National Health Compact 2011; International Health Regulations (2005)
Target stakeholders:
Government, donors, partners and other stakeholders
Public health context:
Post-civil war recovery; cholera epidemic 2012; Ebola virus disease outbreak 2014–2015
Geographical coverage:
National (14 health districts)
Year:
2022
Region / city:
Victoria, Australia
Topic:
Disability policy
Document type:
Final report
Organization:
Victorian Government, Department of Families, Fairness and Housing
Author:
Minister for Disability, Ageing and Carers
Target audience:
People with disability, government agencies, disability advocacy groups
Period of validity:
2017–2020
Approval date:
February 2022
Date of changes:
N/A
Year:
2021
Region / City:
Commonwealth of Australia
Subject:
Water reform, National Water Initiative
Document Type:
Inquiry Report
Organization:
Productivity Commission
Author:
Productivity Commission
Target Audience:
Government agencies, policy makers, researchers
Period of Effect:
2017–2020
Approval Date:
28 May 2021
Date of Changes:
N/A
Organization:
USA Team Handball
Address:
1 Olympic Plaza, Colorado Springs, CO 80909
Country:
United States
Document Type:
Strategic Plan
Subject:
Diversity and Inclusion
Period Covered:
2017–2020
Chief Executive Officer / Diversity Champion:
Michael D. Cavanaugh
Governance Bodies Referenced:
Board of Directors, Standing Committees, Professional Staff
Programs Mentioned:
Wheelchair Team Handball, Deaf Team Handball Program, Special Olympics Team Handball
Partner Organizations:
USA Wheelchair Basketball, USA Wheelchair Rugby, Pan American Team Handball Federation
Institutional Partner:
Gallaudet University
Target Groups:
Women, racial and ethnic minorities, LGBTQ community, military veterans, people with disabilities
Geographic Focus:
United States (including California, Illinois, Alabama)
Key Objectives:
Recruitment, Retention, Revenue diversification goals
Implementation Measures:
Ad Hoc Diversity and Inclusion Committee, Bylaw Revision, Data Collection Review
Associated Reference:
USOC Diversity and Inclusion Scorecard
Year:
2018
Region / city:
Geneva
Topic:
Telecommunications standardization
Document type:
Administrative document
Organization / institution:
International Telecommunication Union (ITU)
Author:
Consultative Group on Telecommunication Standardization (CGTS)
Target audience:
Telecommunications professionals, policy makers, and researchers
Period of validity:
2017–2020
Approval date:
December 2018
Date of revisions:
N/A
Keywords:
Working methods; Research Commissions; A.1
Note:
Contextual description
Year:
2017
Region / City:
London, UK
Subject:
Housing Benefit and Council Tax Support Risk Scoring
Document Type:
Procurement Notice / Contract Specification
Organization:
London Borough of Lambeth
Contact Officer:
Phill Miall
Directorate:
Corporate Resources
Team / Section:
Business Transformation
Email:
[email protected]
Phone:
02079260898
Contract Start Date:
01/10/2017
Contract End Date:
01/10/2020
Quotation Submission Deadline:
10/07/2017
Payment Terms:
30 days
Eligible Suppliers:
Small and Medium Enterprises
Contract Value Range (£):
25,000–99,000
CPV Code:
Not known
Requirements:
Automated risk scoring for online Housing Benefit/Council Tax Support changes, integrated Credit Reference Agency checks, service level agreement, annual cost breakdowns
Year:
2017–2020
Region/City:
Not specified
Subject:
Bachelor of Commerce (B.Com.) Part-I
Document Type:
Academic guidelines
Institution:
University/College (unspecified)
Audience:
B.Com. Part-I students
Semesters covered:
I & II
Major/Minor subjects included:
Yes
Examination structure:
Detailed with marks allocation and course outlines
Course duration:
Three academic sessions (2017–18, 2018–19, 2019–20)
Grading and evaluation criteria:
Specified
Practical/Project components:
Included
Reference materials:
Prescribed textbooks and reading lists
Attendance requirements:
Specified in terms of percentage
Endorsements/Authority:
Academic board or relevant department
Policies on failed or incomplete courses:
Included
Year:
2017–2020
Region / City:
United States
Topic:
Nutrition, Physical Activity, Liver Disease
Document Type:
Research Supplementary Tables
Organization:
National Health and Nutrition Examination Survey (NHANES)
Authors:
Not specified
Target Audience:
Researchers, healthcare professionals
Data Source:
NHANES survey data
Variables:
Dietary intake, physical activity, Healthy Eating Index, socioeconomic status
Population:
Adult participants with and without chronic advanced liver disease (cACLD)
Statistical Methods:
Ordinal logistic regression
Outcomes:
Associations of diet quality, physical activity, and SES with cACLD risk
Year:
2017–2020
Region / City:
South Africa, Nigeria, Guinea-Bissau
Topic:
Electricity pricing, electricity theft, power sector regulation
Document Type:
News report / Analysis
Source:
SA City Press, BusinessDay
Author:
Unspecified businessman, Mike Schussler (economist)
Target Audience:
Business owners, electricity consumers, policymakers
Affected Entities:
Municipalities, Eskom, power distribution companies, consumers
Key Issues:
Tariff discrepancies, electricity theft, regulatory compliance, financial losses, network strain
Date Reported:
November 12, 2020
Notable Locations:
Johannesburg, Ekurhuleni, Nelson Mandela Bay, Cape Town, Durban, Yola, Bissau
Legislation / Regulation Referenced:
National Energy Regulator of South Africa (NERSA), Electric Power Sector Reform Act (EPSRA), NERC regulations