№ files_lp_3_process_7_054899
File format: docx
Character count: 5496
File size: 120 KB
This document is a legal amendment to the Radiocommunications (Receiver Licence Tax) Act, detailing the changes to tax rates and definitions for radiocommunications licences.
Year:
2026
Region / City:
Australia
Topic:
Radiocommunications, Licence Tax
Document Type:
Legislation
Authority:
Australian Communications and Media Authority
Author:
Adam Suckling, Michael Brealey
Target Audience:
Legal and Regulatory Authorities
Effective Period:
From 29 January 2026
Date of Approval:
29 January 2026
Date of Amendments:
None specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2009
Region / city:
Multiple countries
Topic:
Railway Radiocommunication Systems
Document type:
Questionnaire
Author:
Not specified
Target audience:
Railway system operators and engineers
Action period:
Not specified
Approval date:
5 August 2009
Amendment date:
3 March 2010
Changes date:
Not specified
Note:
Context description
Date:
27 September 2024
Subject:
Liaison Statement to NATO on WPT-EV technical compatibility studies with radiocommunications services in the frequency range from 9 kHz to 30 MHz
To:
Mr. Adam Kugler, NATO Digital Staff, Spectrum Policy
Cc:
Mr. Vincent Durepaire, WG FM Chair
Note:
Mr. Max Friedrich, SE24 Chair
Region / City:
Vienna, Austria
Document type:
Official Communication
Issuing body:
WG SE
Audience:
NATO Digital Staff, Spectrum Policy, WG SE
Period of validity:
2024–2026
Approval date:
27 September 2024
Next review date:
20–24 January 2025
Document reference:
SE(24)102A09FM
Keywords:
NATO, WPT-EV, radiocommunications, frequency range, technical compatibility
Year:
2026
Region / City:
United States / Seattle, WA
Subject:
First Receiver Site License for Pacific Coast Groundfish IFQ
Document Type:
Application Form
Organ / Institution:
National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service
Author:
National Marine Fisheries Service
Target Audience:
First receiver site applicants
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2015
Region / City:
N/A
Topic:
Healthcare IT, Laboratory Orders Interface
Document Type:
Implementation Guide
Organization / Institution:
athenahealth, Inc.
Author:
athenahealth, Inc.
Target Audience:
Healthcare providers and technical staff involved in implementing athenaCoordinator Receiver Lab Orders
Period of Validity:
N/A
Approval Date:
July 2015
Date of Modifications:
N/A
Year:
2018
Region / City:
Copenhagen
Topic:
Receiver parameters for SSR, IFF, and Mode S systems
Document type:
Meeting document
Organization / Institution:
APWPT and DFS
Author:
Not specified
Target audience:
Members of SE7 working group
Period of validity:
30 January – 1 February 2018
Approval date:
24 January 2018
Date of changes:
Not specified
Year:
2023
Region / City:
Sophia Antipolis, France
Topic:
Low-power wake up signal and receiver for 5G NR
Document Type:
Technical Report
Organization / Institution:
3GPP
Author:
3GPP Organizational Partners
Target Audience:
Technical experts, researchers, and engineers in the field of wireless communication
Period of validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2020
Region / City:
Not specified
Topic:
GNSS Receiver Calibration
Document Type:
Technical Report
Organization:
RISE Research Institutes of Sweden AB
Author:
Kenneth Jaldehag, P. Jarlemark, C. Rieck
Target Audience:
Researchers, engineers, and professionals in the field of measurement science and GNSS calibration
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Last Update:
Not specified
Year:
2024
Note:
Region / city
Subject:
Receiver resilience, adjacent frequency ranges
Document type:
Technical report
Approval date:
10 May 2024
Year:
2024
Document type:
Technical report
Organization:
Electronic Communications Committee (ECC)
Region:
Europe
Author:
ECC Working Group
Subject:
Receiver resilience, adjacent channel interference, MRR method
Standards referenced:
ETSI Harmonised Standards, ERC Recommendation 74-01
Approval date:
10 May 2024
Frequency range:
Adjacent channels
Key terms:
PR (Protection Ratio), Blocking levels, FOS (Frequency Offset Selectivity), MRR (Method for Receiver Resilience)
Year:
2014
Section:
VII
Document Type:
Emergency management guidance
Topic:
Hospital evacuation and regional patient surge coordination
Scope:
Regional hospital response
Related Event:
Superstorm Sandy
Referenced Authors:
Adalja A; Watson M; Bouri N; Minton K; Morhard R; Toner E; Diglio M; Benedetto NA; Raneri J
Referenced Organizations:
NYC REMSCO
Referenced Publications:
Annals of Emergency Medicine; JEMS
Year:
2026
Region / City:
USA, Newtown, CT
Theme:
Fiber Optic Video Multiplexing Systems
Document Type:
Engineering Specifications
Organization:
International Fiber Systems, Inc.
Author:
International Fiber Systems, Inc.
Target Audience:
Engineers, Technicians, Manufacturers
Validity Period:
Lifetime Warranty
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
Technical specifications for a 2-channel fiber optic video multiplexing system used in various video transmission systems across multiple regions and applications.
Year:
2014
Region / city:
Denver
Topic:
Sports / Football
Document type:
Interview
Organization / institution:
Denver Broncos
Author:
Demaryius Thomas
Target audience:
Sports fans, football enthusiasts
Effective period:
November 20, 2014
Approval date:
November 20, 2014
Modification date:
N/A
Year:
2026
Note:
Region / City
Topic:
Software Installation
Document Type:
Instruction Manual
Organization / Institution:
Fairview Technology Service Center
Target Audience:
Users of Fairview system
Note:
Year
Author:
VK2ACD
Context:
This document provides a detailed explanation of how signal strength is measured at the receiver input, including the principles behind S-meters and the calculation of signal strength in dBm.
Year:
2017
Region / City:
Not specified
Topic:
Engineering / Telecommunications
Document Type:
Project description
Organization / Institution:
Not specified
Author:
Not specified
Target audience:
Students in an engineering course
Period of validity:
Not specified
Approval date:
Not specified
Date of modifications:
Not specified
Context:
A technical project description for designing a DTMF transmitter and receiver using oscillators, resonators, and filters, with a focus on noise robustness and experiential learning.
Year:
2026
Event:
3GPP TSG-RAN WG1 Meeting #124
Location:
Gothenburg, Sweden
Dates:
February 9–13, 2026
Topic:
Low-power wake-up signal and receiver for NR (LP-WUS/WUR)
Technical area:
5G NR radio access network specifications
Document type:
Meeting discussion and decision summary with text proposals
Organization:
3GPP TSG-RAN WG1
Source:
Moderator (vivo)
Agenda item:
8.6
Related specifications:
3GPP TS 38.211 V19.0.0; 3GPP TS 38.212 V19.0.0; 3GPP TS 38.213; 3GPP TS 38.331
Purpose:
Discussion and decision on maintenance updates
Main content:
Text proposals for updating higher-layer parameter names and related definitions in NR specifications for LP-WUS/LP-SS
Participating companies mentioned:
Qualcomm; Samsung
Technical elements referenced:
LP-WUS; LP-SS; OOK modulation; sequence modulation; RRC parameters; wake-up information coding
Decision process:
Company preference and adoption proposals for technical text proposals TP1–TP6
Year:
2022
Region / City:
Thessaloniki
Subject:
Research dataset usage
Document Type:
Licence Agreement
Organization / Institution:
Aristotle University of Thessaloniki
Author:
Aristotle University of Thessaloniki
Target Audience:
Researchers
Period of Validity:
2022–2026
Approval Date:
November 2022
Amendment Date:
N/A