№ lp_1_17487
File format: docx
Character count: 5454
File size: 30 KB
Year:
2026
Region / City:
United States
Subject:
Smoke protection systems
Document Type:
Technical specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, engineers, installers
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context Description:
Technical specification for the installation and maintenance of fixed draft-protective curtain assemblies for smoke containment in construction projects.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Boise, ID
Topic:
Smoke and Draft Control
Document Type:
Technical Specification
Organization / Institution:
Smoke Guard, A CSW Industrials Company
Author:
Not specified
Target Audience:
Contractors, Architects, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Topic:
Fire safety, door systems
Document Type:
Technical specifications
Organization / Institution:
Richards-Wilcox
Target Audience:
Architects, Contractors, Builders
Year:
2006–2024
Region / City:
Arthur, IL, US
Subject:
Overhead coiling doors, insulated and heavy duty
Document Type:
Technical specification
Organization / Institution:
ARCAT, Inc.; C.H.I. Overhead Doors (NUCOR company)
Author:
C.H.I. Overhead Doors
Target Audience:
Architects, engineers, contractors
Standards Referenced:
ASTM A480/A480M, ASTM A653/A653M, ASTM A666, ASTM B209, ASTM B221
Project Requirements:
Buy American compliance, LEED certification (optional)
Product Model:
6242
Manufacturer Contact:
1485 Sunrise Drive, Arthur, IL 61911; Tel: 800-677-2650; Web: www.chiohd.com
Warranty:
5 years limited warranty on materials and workmanship; 1 year spring wire
Operational Conditions:
Wind load 20 psf, seismic per ASCE/SEI 7, cycles up to 100,000 depending on demand
Installation Conditions:
Temperature, humidity, and ventilation within manufacturer limits
Note:
Year
Note:
Year
Contextual Description:
This document provides specifications for air curtains, including performance requirements, installation guidelines, and manufacturer standards.
Note:
Year
Subject:
Air Curtains
Document Type:
Specification
Year:
2023
Region / City:
Boise, ID
Topic:
Smoke and Draft Control
Document Type:
Technical Specification
Organization / Institution:
Smoke Guard, A CSW Industrials Company
Author:
Not specified
Target Audience:
Contractors, Architects, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Revision:
7 Updated: 30/06/2016
Note:
© Queensland Rail 2016
Year:
2016
Region / City:
Queensland, Australia
Subject:
Electrical Safety
Document Type:
Safety Requirements
Organisation / Institution:
Queensland Rail
Author:
Francisco Siliezar, Gary Smith
Target Audience:
Contractors, Electrical Workers, Safety Personnel
Period of Validity:
Ongoing, review before 30/06/2019
Approval Date:
30/06/2016
Amendments Date:
30/06/2016
Year:
Not specified
Region / city:
Not specified
Topic:
Environmental Protection, Construction Site Management
Document Type:
Draft / Technical Requirement
Authority / Organization:
Not specified
Author:
Not specified
Target Audience:
Dischargers, Construction Site Operators
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2011
Region / City:
Not specified
Topic:
Insulated Steel Sectional Overhead Doors
Document Type:
Product Specification
Organization / Institution:
Upwardor
Author:
Not specified
Target Audience:
Contractors, Engineers, Designers
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2017
Region / City:
N/A
Theme:
Electrical Safety, Workplace Safety, Emergency Response
Document Type:
Best Practice
Author:
N/A
Target Audience:
Workers, Supervisors
Effective Date:
01/10/2017
Revision Number:
0
Training Requirements:
Yes
Associated Safety Standards:
OSHA 1910.332, OSHA 1910.333
Utilities Covered:
Electrical, Gas, Chemical, Water, Sewer
Document Number:
BP034
Year:
2023
Region / City:
Boise, ID
Topic:
Smoke and Draft Control
Document Type:
Technical Specification
Organization / Institution:
Smoke Guard, A CSW Industrials Company
Author:
Not specified
Target Audience:
Contractors, Architects, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Note:
Year
Topic:
Fire safety, door systems
Document Type:
Technical specifications
Organization / Institution:
Richards-Wilcox
Target Audience:
Architects, Contractors, Builders
Document Code:
C7810.M10.TIC
Contract Number:
Not specified
Document Type:
Tender Schedule
Subject:
Cost Breakdown and Percentage Allocation for Overheads and Profit
Related Documents:
Conditions of Tendering; Conditions of Contract; Schedule of Rates; Schedule of Prices; Bills of Quantities
Issuing Party:
Principal
Submitting Party:
Tenderer
Financial Basis:
Excluding GST
Cost Components:
Direct Job Costs; On-Site Overhead; Off-Site Overhead; Profit Margin
Application:
Valuation of Variations and Claims
Binding Effect:
Applicable to Successful Tenderer for Duration of Contract
Authorisation Requirement:
Name, Position, Signature, Date
Currency:
Dollar ($)
Year:
1893–1894
Region / City:
Beecroft, New South Wales, Australia
Theme:
Local infrastructure and land management
Document Type:
Newspaper reports
Institution:
Beecroft Progress Association, New South Wales Government
Author:
Various journalists and officials
Intended Audience:
Local residents and government officials
Relevant Locations:
Malton Street, Copeland Street, Field of Mars Common
Topics Covered:
Requests for overhead railway bridges, expansion of recreation reserves, railway inspections, government responses
Dates of Events:
January 1893 – January 1894
Official Correspondence:
Letters from F. Farnell, H. McLachlan, Minister for Lands, and Railway Commissioners
Decisions Documented:
Approval of three lots added to recreation reserve, discussion of bridge construction at Copeland Street
Year:
2026
Organization:
CERN
Document Type:
Qualification Questionnaire
Topic:
Procurement of Electrical Overhead Travelling Cranes
Target Audience:
Firms or Groups of Firms interested in tender participation
Contract Scope:
Supply, installation, and maintenance of EOT cranes for cleanrooms
Submission Platform:
CERN e-survey interface
Group Limit:
Maximum two firms per Group
Qualification Criteria:
Technical, financial, administrative, competence, production capacity, equipment and safety requirements
Document Sections:
Information about Firm(s), General Qualification Criteria, Competence and References, Production Capacity, Equipment and Maintenance, Technical Qualification, Safety, Other General Information, Annex
Legal Compliance:
Must declare bankruptcy, legal proceedings, or fraud convictions
Sustainability Considerations:
Sustainable development measures included
End Use Location:
CERN cleanrooms
Note:
Year
Topic:
Glazing, Bullet-resistant framing
Document Type:
Guide Specification
Organization / Institution:
Total Security Solutions, Inc.
Target Audience:
Specifiers, architects, contractors
Installation Instructions:
Provided by the manufacturer
Warranty:
Manufacturer’s warranty for 1 year (workmanship), 5 years (finish)
Project Conditions:
Maintain environmental conditions as per manufacturer’s recommendations
Design Performance:
Louvers made with 1/2” thick acrylic
Fabrication:
Glazing channel, angles, and stops designed for secure installation
Installation:
Per manufacturer’s instructions and UL 752 standards
Protection:
Ensure proper cleaning and protection during construction
Inspection and Cleaning:
Final cleaning of product, touch-up of damaged areas
Note:
Year
Year:
2022
Software:
SAP S/4HANA
Module:
Overhead Cost Accounting (J54_US)
Document Type:
Test Script
Audience:
SAP Implementation and Testing Team
Scope:
Transaction-based actual postings, overhead cost controlling, and period-end allocations
Regions / Systems:
SAP Fiori launchpad access required
Prerequisites:
System access, assigned roles, master data, organizational data
Authors / Contributors:
SAP Best Practices Documentation
Related Notes:
SAP note 2596669
Content Version:
27-09-22
Language:
English