№ files_lp_3_process_7_098375
File format: docx
Character count: 3335
File size: 29 KB
The document outlines the completion of the UAS Traffic Management (UTM) project, which aimed to develop and validate operational requirements for integrating UAS into low-altitude airspace, including proof-of-concept software prototypes and system guidelines.
Year:
2021
Region / City:
United States
Topic:
Unmanned Aircraft Systems, Traffic Management
Document Type:
Project Summary
Organization / Institution:
NASA, FAA
Author:
NASA
Target Audience:
Industry professionals, researchers, government agencies
Period of Action:
Oct 2015 – May 2021
Approval Date:
May 2021
Modification Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
UTM Zone 11, California, USA
Subject:
Air quality modeling and emissions data
Document type:
Technical input files
Organization / Agency:
MMIF / AERMOD project
Author:
Unspecified / Project team
Target audience:
Environmental engineers, air quality modelers
Source coverage:
Heavy-duty onroad, nonroad, and point sources
Receptor type:
Gridded 1-km receptors, census block receptors, monitors
Temporal resolution:
Hourly emissions, monthly outputs, annual concentrations
Input data:
Meteorological data from MMIF_AERMET_2020
Processing software:
AERMOD, AERMET, MMIF pre-processor
File formats:
.inp, .dat, .txt
Program:
FHWA Emergency Relief (ER)
Document type:
Inspection and closeout checklist
Repair category:
Permanent repair
Issuing authority:
Federal Highway Administration
Intended use:
Field inspections and final project reviews
Project phase:
Final closeout
Authorization requirement:
FHWA project authorization prior to construction
Environmental compliance:
NEPA, permits, Section 106, ESA
Financial documentation:
Federal-aid eligible cost verification and final estimates
Construction compliance:
Buy America, Davis-Bacon, materials certifications
Audit readiness:
Documentation retention and procurement compliance
Administrative reference:
DDIR, PS&E, federal-aid project agreements and forms
Year:
2020
Region / City:
Not specified
Topic:
Clinical trial procedures
Document Type:
Clinical trial protocol
Institution:
NIAMS
Author:
Not specified
Target Audience:
Research staff, clinical trial personnel
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2021
Region / City:
Canberra
Theme:
Clinical Trials, Research Procedures
Document Type:
Procedure Manual
Organization:
Canberra Health Services
Author:
Clinical Trials Unit
Target Audience:
CHS Staff involved in clinical trials
Period of Effect:
Indefinite
Approval Date:
17/09/2021
Amendment Date:
Not specified
Document Status:
Controlled, subject to updates
Note:
Year
Note:
Year
Region / City:
Central Region, Alaska
Topic:
Project Closeout, Highway Design
Document Type:
Guide
Organization:
Alaska Department of Transportation & Public Facilities (DOT&PF)
Author:
Chris Post, P.E., Fred Park, P.E., Steven Rzepka, P.E., Devki Rearden, Ryan Norkoli, P.E.
Target Audience:
DOT&PF staff, consultants, contractors
Effective Period:
Ongoing, updates periodically
Approval Date:
Not specified
Date of Last Update:
Not specified
Year:
2020
Note:
Region / City
Topic:
Clinical Trials, Closeout Procedures
Document Type:
Procedure Guidelines
Organization / Institution:
NIAMS
Target Audience:
Researchers, Clinical Trial Coordinators, IRB Members, Study Site Personnel
Jurisdiction:
State of Kansas
Department:
Department of Administration, OFPM-DCC
Document type:
Project closeout checklist
Project scope:
Construction projects
Responsible party:
Contractor
Reviewing parties:
Owner; Project Architect/Engineer
Approval requirement:
Completion and verification prior to final payment
Related documentation:
Certificate of (Partial) Occupancy; Record Documents; Operations and Maintenance manuals
Associated form:
Form 571 – Certificate of Project Completion / Affidavit of Contractor
Year:
2023
Region / City:
United States
Subject:
Subcontract closeout process
Document Type:
Internal Procedure
Organization / Institution:
Leidos
Author:
Leidos
Target Audience:
Contractors and subcontractors
Period of Action:
Ongoing as per subcontract agreements
Approval Date:
N/A
Date of Amendments:
N/A
Section number:
017800
Document title:
Closeout Submittals
Discipline:
Construction administration
Subject:
As-Built Documents and Record Documents
Document type:
Specification section
Project phase:
Closeout
Responsible parties:
Contractor; Design Professional; Architect
Related sections:
01 7700 – Closeout Procedures; Divisions 02 through 49
Submittal types:
As-Built; Shop Drawings; O&M; Warranty; Record Documents
Formats required:
PDF; CAD (.dwg)
Digital platform:
eBuilder
Update frequency:
Weekly during construction
Review period:
5 business days
Timing of submittal:
At Substantial Completion
Scope of work covered:
Architectural; Structural; Civil; Landscape; FLS; MEP; Fire Sprinkler; Fire Alarm; Building Automation; Security/Access; Nurse Call; ITG
Standards for revisions:
Clouded, dated, and numbered revisions during construction; removed in final record set
Ownership of final record set:
Owner
Note:
Year
Topic:
Project Management
Document Type:
User Guide
Target Audience:
Project Managers, Stakeholders
Year:
Not specified
Region / City:
Not specified
Topic:
Construction, Project Completion
Document Type:
Technical guidelines
Author:
Not specified
Target Audience:
Contractors, Consultants, Project Managers
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
[Insert name of jurisdiction]
Subject:
Grant Closeout and Recapture of Unspent Grant Funds
Document Type:
Official Notice
Issuing Organization:
[Insert organization]
Author:
[Insert author name or department]
Target Audience:
Grantees under the Neighborhood Stabilization Program
Action Required:
Submission of specific documentation for grant closeout and fund recapture
Date of Issuance:
[Insert date]
Date of Amendment:
N/A
Expiration Date:
N/A
Year:
2026
Region / City:
United States
Topic:
Energy Research Program Reporting
Document Type:
Instructional Checklist
Agency / Institution:
Advanced Research Projects Agency-Energy (ARPA-E)
Author:
ARPA-E Program Office
Intended Audience:
Grant Recipients and Subrecipients
Reporting Period:
Varies by report type (Quarterly, Annual, Final)
Effective Date:
2026
References:
ePIC Portal, iEdison, DOE Submission Portals
Note:
Year
Institution:
United Tribes Technical College
Organ:
Institutional Review Board (IRB) for Protection of Human Subjects
Document Type:
Protocol Closeout Form
Purpose:
Research Project Closure
Related To:
Human Subjects Research
Required By:
UTTC IRB
Submission Method:
Email to [email protected]
Responsible Party:
Principal Investigator
Includes Fields:
Project Title, IRB Protocol Number, Closeout Date
Includes Reporting On:
Subject Enrollment, Study Completion, Withdrawals, Adverse Events, Protocol Deviations, Amendments
Certification Requirement:
Signature of Principal Investigator
Approval Authority:
UTTC Institutional Review Board
Year:
2026
Institution:
South Dakota State University
Subject:
Unmanned Aircraft Systems (UAS)
Document type:
Policy and Procedure Manual
Source:
Federal Aviation Administration (FAA) UAS Regulations and Policies; SDBOR Policy 1.7.3; FAA Modernization and Reform Act of 2012 (P.L. 112-95)
Office/Contact:
Risk Management
Associated forms:
UAS Operations Request Form, SDSU Environment Health and Safety UAS Indoor-use Safety Document, J.U.M.P. Request Form
Coverage:
University property and operations
Compliance:
FAA regulations, Part 107, Section 333 Exemption, Certificate of Authorization (COA)
Responsible office:
Risk Management Coordinator
Purpose:
Establish lawful operation and use of UAS at the University
Scope:
Students, employees, contractors, and institutional programs
Year:
2024
Region / City:
Controlled airspace
Subject:
UAS operations, air traffic service
Document Type:
Risk assessment and mitigation document
Organ / Institution:
ENAIRE
Author:
UAS Operator
Target Audience:
UAS Operators, Air Traffic Service Providers
Period of validity:
Until new operational risk assessment is required
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
N/A
Topic:
ESA WG Meeting Agenda
Document Type:
Meeting Agenda
Organization / Institution:
ESA WG
Author:
N/A
Target Audience:
N/A
Period of Action:
2023
Approval Date:
6/29/2023
Date of Changes:
N/A