№ lp_2_1_28132
File format: docx
Character count: 2472
File size: 28 KB
Year:
2022
Region / City:
Pacific Northwest, USA
Theme:
Power systems, Distributed Energy Resources (DERs)
Document type:
IEEE Test Case Proposal
Organization / Institution:
IEEE Power & Energy Society, Pacific Northwest National Laboratory, Washington State University, Incremental Systems Corp, Modern Grid Solutions
Authors:
Davis Montenegro-Martinez, Jing Xie
Target audience:
IEEE Power & Energy Society, Test Feeders Working Group
Period of validity:
2022 and ongoing
Approval date:
Pending
Date of changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / city:
Not specified
Subject:
Data analysis
Document type:
Report
Organization / institution:
Not specified
Author:
Not specified
Target audience:
Not specified
Period of validity:
Not applicable
Date of approval:
Not applicable
Date of changes:
Not applicable
Year:
2007
Author:
Mike Holt
Organization:
Mike Holt Enterprises
Document type:
Article
Target audience:
Electricians, NEC trainees
Topic:
Electrical feeders, NEC Article 215
Publication date:
June 1, 2007
Content focus:
Feeder sizing, installation, identification, and protection requirements
System types:
Single-phase, three-phase, delta, wye
Key standards referenced:
NEC Articles 100, 200, 210, 215, 240, 250, 408, 695, 700, 701
Year:
Not specified
Region / City:
Not specified
Topic:
Command reference for BPQ node operations
Document Type:
User manual
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
BPQ Node users, system operators
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2020
Region / City:
Global
Subject:
Virtual Exchange Service Management
Document Type:
Guide
Organization:
Virtual Exchange Service Team
Author:
Not specified
Target Audience:
Network administrators, Service Managers
Period of Validity:
Indefinite
Approval Date:
09/20/2020
Date of Changes:
Not specified
Date of change:
1 July 2021
Update date:
6 July 2021
Jurisdiction:
Australia
Scheme:
Medicare Benefits Schedule (MBS)
Subject:
General surgery services – lymph node procedures
Document type:
Reference guide / factsheet
Issuing body:
Department of Health
Related body:
MBS Review Taskforce
New item:
30820
Deleted items:
30096; 31420
MBS fee (item 30820):
$191.35
PHI classification:
Type B – Non band specific Type B day procedure
Clinical category:
Ear, nose and throat
Effective date:
1 July 2021
Contact emails:
[email protected]
Target audience:
Surgeons, consumers, private health insurers, private hospitals
Year:
2022
Region / city:
Sophia Antipolis, France
Topic:
Satellite Access Node radio transmission and reception
Document type:
Technical Specification
Organization / institution:
3GPP
Author:
3GPP Organizational Partners
Target audience:
Professionals in telecommunications and wireless communication
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2025
Region / city:
Rivers State, Nigeria
Subject:
Lymphadenopathy, Histopathological analysis
Document Type:
Research Study
Institution:
Rivers State University Teaching Hospital
Author:
Not specified
Target Audience:
Medical professionals, Researchers
Study Period:
1st January 2019 – 31st December 2025
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / city:
Rivers State, Nigeria
Subject:
Lymphadenopathy, Histopathological analysis
Document Type:
Research Article
Organization / Institution:
Rivers State University Teaching Hospital
Author:
Not specified
Target Audience:
Healthcare professionals, researchers in the medical field
Effective Date:
January 1, 2019
Date of Last Update:
December 31, 2025
Year:
2026
Location:
Goteborg, Sweden
Document type:
Change Request
Related standard:
3GPP NR Rel-19
Work item code:
NR_Mob_Ph4-Core
Source organizations:
ZTE Corporation, CATT, Huawei, LG Electronics
Target group:
TSG RAN WG3
Category:
F (correction)
Date submitted:
2026-01-30
Affected clauses:
8.6.1.2, 9.1.5.1, 9.1.5.5, 9.2.3.www, 9.3.4, 9.3.5, 9.3.7
Impact:
Isolated impact on LTM procedure within same release
Summary of change:
Adjusted LTM configuration update and cell switch notification procedures for per-node UE XnAP ID transfer
Type of source:
Technical specification change request
Year:
2026
Region / City:
Gothenburg, SE
Topic:
Telecommunication
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Huawei, Nokia, Offinno, Jio Platforms, CMCC, NEC, LG Electronics, Google
Target Audience:
3GPP Working Group
Period of Validity:
2026
Approval Date:
2026-02-12
Amendment Date:
N/A
Work Item Code:
NR_Mob_Ph4-Core
Release:
Rel-19
Category:
F (Correction)
Clauses Affected:
9.1.5.1
Impact Analysis:
Isolated protocol and functional impact
Consequences if Not Approved:
Ambiguities in the specification
Year:
2026
Region / city:
Gothenburg, SE
Topic:
Network protocol change
Document type:
Change request
Organization / institution:
3GPP
Author:
Huawei, Nokia, Offinno, Jio Platforms, CMCC, NEC
Target audience:
WG3 members
Effective period:
Not specified
Approval date:
2026-02-12
Modification date:
Not specified
Change category:
F
Release version:
Rel-19
Year:
2026
Location:
Gothenburg, SE
Document type:
Change Request
Work item code:
NR_Mob_Ph4-Core
Release:
Rel-19
Category:
F (correction)
Source organizations:
Huawei, Nokia, Offinno, Jio Platforms, CMCC, NEC, LG Electronics, Google, ZTE, Ericsson, Lenovo, NTT DoCoMo, Qualcomm, Samsung, China Telecom
Target group:
3GPP TSG-RAN WG3
Date submitted:
2026-02-12
Clauses affected:
9.1.5.1
Related specifications:
TS 38.331, TS/TR CRs
Revision history:
Included in LTM CONFIGURATION UPDATE message for per cell level Last Target NG-RAN node UE XnAP ID IE
Year:
2026
Region / City:
Global
Subject:
5G Network Function Configuration
Document Type:
Technical Discussion Summary
Organization / Institution:
Multiple Telecom Vendors
Author:
Lenovo, Ericsson, Huawei, Nokia, ZTE, Vivo, Tencent, China Mobile, Qualcomm, Samsung
Target Audience:
Network engineers, 5G system architects
Related Standards:
3GPP, NEF, SMF, AF, UDR, PCC
Key Concepts:
EDI, Node Level Info, Session Level Info, DNS handling rules, AF traffic influence
Decision Points:
Options for EDI delivery and node level info provisioning
Date of Compilation:
2026-03-10
Year:
2010
Region / city:
N/A
Subject:
Phylogeny
Document type:
Supplementary material
Author:
Corl et al.
Target audience:
Researchers in evolutionary biology
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2021
Event:
3GPP TSG RAN WG1 #106bis-e e-Meeting
Location:
Virtual / e-Meeting
Topic:
Enhancements to IAB node resource multiplexing between child and parent links
Document type:
Meeting contribution / Technical summary
Organization:
3GPP
Authors:
AT&T, Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, vivo
Audience:
RAN1 working group participants
Period of relevance:
October 11–19, 2021
Agenda item:
8.10.1
Related documents:
106bis-e-NR-eIAB-01
Purpose:
Discussion and approval of proposed multiplexing enhancements and guard symbol handling