№ lp_1_2_25395
File format: docx
Character count: 50158
File size: 163 KB
Procedural document for internal project review detailing required elements, approvals, and verification steps for final highway design plans and specifications.
Note:
Year
Region:
Alaska
Department:
Department of Transportation & Public Facilities (Central Region)
Type:
Checklist / Procedural Form
Audience:
Design Teams and Consultants
Purpose:
Final PS&E verification
Includes:
Plan Sheets, Project Designation, Title Block, Engineer of Record Approval, Sheet Layout and Notes
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2019
Region / city:
Alaska
Topic:
Community Care Network (CCN) Services
Document Type:
Sources Sought / Special Notice
Agency / Organization:
U.S. Department of Veterans Affairs, Veterans Health Administration (VHA), Office of Community Care (OCC)
Author:
Veterans Affairs
Target Audience:
Contractors, Healthcare Providers
Period of Action:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Description:
Request for information (RFI) for CCN services and healthcare resources in Alaska
Place of Performance:
Alaska
Additional Information:
Industry Days scheduled for March 26 and March 28, 2019
Year:
FY2021
Region:
Alaska, United States
Subject:
Education, Federal Relief Programs, COVID-19 Response
Document Type:
Assurances and Certification Packet
Issuing Authority:
Alaska Department of Education and Early Development
Applicable Programs:
Governors’ Emergency Education Relief Fund (GEERF), Elementary and Secondary School Emergency Relief Fund (ESSERF)
Date Revised:
June 2020
Submission Method:
Grants Management System (GMS)
Legal References:
CARES Act Sections 18002, 18003(d)(1), 18006; GEPA Sections 427, 442; 34 CFR parts 75, 76, 77, 81, 82, 84, 86, 97, 98, 99; 2 CFR parts 180, 200, 3474, 3485
Authorized Signatory:
Local Education Agency Superintendent or Authorized Representative
Requirements:
Compliance with federal and state laws, reporting obligations, equitable services to non-public schools, record-keeping and inspection rights
Binding Agreement:
LEA, Alaska Department of Education and Early Development, U.S. Department of Education
Formal Assurances:
Legal authority, access to records, nondiscrimination, labor standards, Single Audit Act, and other federal requirements
Year:
2026
Region / City:
Alaska
Subject:
Early childhood education, assessment
Document Type:
Instructional guidelines
Organization / Institution:
Alaska Department of Education and Early Development (DEED)
Author:
DEED staff
Target Audience:
Early childhood education programs in Alaska
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Region / City:
Alaska
Theme:
Pre-elementary school regulations, safety and compliance
Document Type:
Assurance document
Organization / Institution:
Alaska Department of Education & Early Development
Author:
Alaska Department of Education & Early Development
Target Audience:
Pre-elementary school administrators and staff
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Alaska
Topic:
Environmental Protection, Construction
Document Type:
Template
Organization:
Alaska Department of Environmental Conservation
Author:
Alaska Department of Environmental Conservation
Target Audience:
Construction site operators, environmental compliance officers
Effective Period:
2026
Approval Date:
N/A
Date of Changes:
N/A
Year:
Current
Region / City:
Various US states and districts
Topic:
State Education and Higher Education Agencies
Document Type:
Official State Agency Information
Organization / Institution:
Various US state and district education agencies
Author:
N/A
Target Audience:
Students, Educational Institutions
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / city:
Unalakleet, Alaska
Topic:
Climate change, permafrost degradation, drainage networks, coastal erosion, subsidence, resilience planning
Document type:
Technical Report
Organization / institution:
NASA DEVELOP, National Renewable Energy Lab (NREL), University of Georgia, University of Alaska Fairbanks, Woodwell Climate Research Center, University of Connecticut
Authors:
Ian Lee, M. Jaweed Nazary, Clara Maxwell, Daniel J. Marsden, Dr. Marguerite Madden, Dr. Franz Meyer, Dr. Simon Zwieback, Dr. Anna Liljedahl, Dr. Chandi Witharana, Sarah Payne
Target audience:
Researchers, policy makers, environmental scientists, local community planners
Period of validity:
2017 – 2023
Approval date:
August 11th, 2023
Date of changes:
Not specified
Year:
2023
Region / City:
Alaska, Anchorage
Subject:
Permanent Fund Dividend Interception
Document Type:
Instructions
Organization:
Alaska Department of Revenue, Child Support Enforcement Division
Target Audience:
States requesting PFDO cases
Period of Validity:
2023
Approval Date:
January 09, 2023
Modification Date:
N/A
Year:
2014
Region / city:
Alaska
Topic:
Local Exchange Carrier (LEC) services
Document type:
Performance Work Statement
Organization:
Department of Veterans Affairs
Author:
Unknown
Target audience:
Contractors, VA personnel
Period of validity:
10/01/2014 through 09/30/2015
Approval date:
07/31/2014
Amendment date:
None
Note:
Year
Subject:
State Agencies, Higher Education, Complaint Filing
Document Type:
Guidelines
Agency/Institution:
Various State Agencies
Target Audience:
Students, Higher Education Institutions
Description:
A compilation of state agencies for higher education across the U.S. and their associated complaint filing procedures under the State Authorization Reciprocity Agreement (SARA).
Year:
2023
Region / City:
Alaska
Theme:
Land use, easements
Document Type:
Guidance Document
Organization / Institution:
State of Alaska, Department of Natural Resources, Division of Oil and Gas
Author:
Unknown
Target Audience:
Applicants seeking easements on State land
Period of Effect:
Indefinite
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2021
Region / City:
Alaska
Topic:
Erosion and Sediment Control Plan, Storm Water Pollution Prevention Plan
Document Type:
Instructional Template
Organization:
Alaska Department of Transportation and Public Facilities (DOT&PF)
Author:
Not specified
Target Audience:
Contractors, Designers, Environmental Analysts
Period of Action:
As per project timeline
Approval Date:
Not specified
Date of Amendments:
2022, 2024
Year:
2024
Region / City:
Anchorage, AK
Subject:
Tribal Justice, Legal Systems
Document Type:
Event Agenda
Organ / Institution:
Alaska Tribal Justice Conference
Author:
N/A
Target Audience:
Tribal leaders, legal professionals, justice system stakeholders
Period of Validity:
February 13-14, 2024
Approval Date:
N/A
Date of Changes:
N/A
Year:
2023
Region / city:
Bering Sea, Aleutian Islands, Gulf of Alaska
Topic:
Environmental Impact, Fishery Management, Electronic Monitoring
Document type:
Environmental Assessment
Agency / Institution:
National Marine Fisheries Service, North Pacific Fishery Management Council
Author:
National Marine Fisheries Service
Target audience:
Policy makers, environmental agencies, fishery managers
Action period:
2023-ongoing
Approval date:
2023
Amendment date:
Not specified
Year:
2022
Region / City:
Anchorage, Alaska
Theme:
Arctic Security and Research
Document Type:
Biographies of Speakers
Organization:
Alaskan Command, USNORTHCOM, NORAD
Author:
Various Arctic Experts
Target Audience:
Military and Security Professionals, Researchers, Arctic Policy Makers
Period of Activity:
3-6 May 2022
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Fiscal Year
Region / City:
Pittsburg
Topic:
Economic Development, Grant Program
Document Type:
Grant Guidelines
Organization / Institution:
Pittsburg Highway 271 Business Board
Author:
Pittsburg Highway 271 Business Board
Target Audience:
Property Owners, Tenants
Duration:
Oct. 1 - Sept. 30
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / city:
Wisconsin
Subject:
Utility facility construction and maintenance permits
Document type:
Application/Permit
Authority:
Wisconsin Department of Transportation
Author:
Wisconsin Department of Transportation
Target audience:
Utility facility owners
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Document type:
Technical approval schedule
Appendix:
Appendix A
Subject area:
Structural design standards
Infrastructure type:
Highway bridges and structures
Standards framework:
Eurocodes and UK National Annexes
Jurisdiction:
United Kingdom
Responsible role:
Designer
Referenced standards bodies:
British Standards Institution, CEN
Applicable disciplines:
Structural engineering
Scope of documents:
Basis of design, actions on structures, concrete structures, steel structures
Revision status:
Revisions current as of 23 July 2024
Validity period:
Various standards valid until 30 March 2028
Superseding standards:
Referenced where applicable
Associated guidance:
CD 350
Year:
2019
Region / City:
Lancashire
Topic:
Highway Claims
Document Type:
Claim Form
Organization / Institution:
Lancashire County Council
Author:
Fazeela Karim
Target Audience:
Claimants for Highway Incident Compensation
Period of Validity:
N/A
Approval Date:
20/02/2019
Date of Last Revision:
N/A
Document type:
Public Involvement Plan
Sector:
Highway transportation
Agency:
Wisconsin Department of Transportation
Abbreviation:
WisDOT
Reference:
FDM 6-5-10.2
Revision date:
February 2021
Approval roles:
WisDOT Project Manager; Regional Communication Manager
Scope:
Highway project development
Key topics:
Public outreach; Stakeholder engagement; Environmental Justice considerations; Project messaging; Construction impacts; Schedule and cost communication
Source type:
Administrative planning document