№ files_lp_4_process_2_63532
Technical system requirements specification describing functions, interfaces, safety considerations, and lifecycle engineering requirements for helium-based cooling subsystems used in the target station of the European Spallation Source.
Year: Not specified
Region / Country: Sweden
Organization: European Spallation Source (ESS)
Department: Target Division
Document Type: System definition and requirements specification
System: Target Helium Cooling Systems
Sub-systems: Target Primary Cooling (1010); Target Primary Cooling Pressure Control (1011); Helium Injection (1013)
Author: Jens Harborn
Author Role: Work Unit Leader – Target Helium Cooling
Reviewers: Ulf Oden; Per Nilsson
Reviewer Roles: Lead Engineer – Target Systems; CFD Specialist – Target Station
Approver: Eric Pitcher
Approver Role: Deputy Head of Target Division
Project: ESS Target Station Systems
Main Topics: Cooling system functions; pressure control; helium circulation; radiation safety; system interfaces; engineering requirements
Standards and Codes: RCC-MRx Class 3; EN 13445; EN 13480; ESS Technical and Quality Regulations
Stakeholders: Target station operators; maintenance personnel; waste management personnel; radioprotection team; engineering work package leaders
Lifecycle Phases Covered: Design; prototyping; manufacturing; installation; commissioning; operation; decommissioning
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.