№ lp_1_2_66569
File format: docx
Character count: 69527
File size: 656 KB
Year:
2022
Region / City:
Christchurch, New Zealand
Topic:
Integrated Management System, ISO Certification
Document Type:
Manual
Organization:
Mango Limited
Author:
Mango Limited
Target Audience:
Internal employees, partners, suppliers, and contractors
Period of validity:
Not specified
Approval Date:
Not specified
Date of last modification:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Birmingham
Topic:
Integrated Management System
Document Type:
Implementation Guideline
Organization:
Crystal Ware Dishwashers Ltd.
Author:
Not specified
Target Audience:
Users involved in Integrated Management System implementation
Effective Period:
Not specified
Approval Date:
2025/07/30
Revision Date:
Not specified
This document provides a comprehensive guideline for implementing an integrated management system based on ISO 9001:
2015, ISO 45001:2018, and ISO 14001:2015.
Year:
2020
Region / City:
Global
Topic:
Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
Lenovo, Motorola Mobility
Target Audience:
WG1 members, 3GPP TSG
Period of Validity:
2020-08-13 to ongoing
Approval Date:
2020-08-13
Change Date:
N/A
Release:
Rel-16
Category:
F
Work Item Code:
TEI16
Proposed Change Affects:
UICC apps, ME, Radio Access Network, Core Network
Summary:
A Change Request to improve IMS session establishment by subscribing the P-CSCF to event notifications defined in TS 29.514 for EPS fallback.
Source:
Ericsson
Meeting:
3GPP TSG-WG SA2 #173
Agenda Item:
20.1.1
Work Item / Release:
FS_5GSAT_Ph4_ARC / Rel-20
Date:
February 09-13, 2026
Region:
Goa, India
Document Type:
Technical contribution / approval
Target Audience:
3GPP SA2 members
Key Issues:
KI#1 – non-IP transport and new RTP negotiation
Protocol Focus:
UE-EPC non-IP coordination, UE-IMS new RTP header
Standards Referenced:
TR 23.700-19, TS 29.303
Endorsement Status:
For approval
Year:
2026
Region / City:
Goa, India
Topic:
IMS signaling transport for GEO NB-IoT NTN access
Document Type:
Meeting Contribution
Organization / Institution:
3GPP
Author:
vivo
Target Audience:
3GPP TSG-SA WG2 members
Period of validity:
February 2026
Approval Date:
Not specified
Modification Date:
Not specified
Agenda Item:
20.1.1
Work Item / Release:
FS_5GSAT_Ph4_ARC / Rel-20
Abstract:
Updated conclusion on IMS signaling transport for GEO NB-IoT NTN access
Context:
Document proposing conclusions on IMS signaling transport for GEO NB-IoT NTN access.
Year:
Not specified
Region / City:
Not specified
Topic:
Quality, Health and Safety, Environmental Management
Document Type:
Job Description
Organization:
Not specified
Author:
Not specified
Target Audience:
Not specified
Period of Action:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2024
Region / city:
Global
Topic:
IMS Data Channel API
Document type:
Specification
Organization / institution:
GSMA Association
Author:
GSMA
Target audience:
Developers, Telecom Engineers
Validity period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2021
Region / city:
Elbonia
Subject:
Telecommunications
Document type:
Change Request
Organ / institution:
3GPP SA2
Author:
Qualcomm Incorporated, Ericsson
Target audience:
3GPP Working Group 2
Period of validity:
N/A
Approval date:
2021-02-24
Date of changes:
N/A
Category:
C
Release:
Rel-17
Reason for change:
Introducing changes in TS 23.501 for IMS voice support over SNPNs based on TR 23.700-07
Summary of change:
Support for IMS voice over PS support indication for SNPNP-CSCF address discovery and IMS voice when access is via PLMN
Clauses affected:
5.16.3.2, 5.16.3.4, 5.16.3.6, 5.30.2.8
Other specs affected:
N/A
Other comments:
N/A
Year:
2025
Region / city:
Göteborg, SE
Theme:
IMS voice call optimization via NB-IoT GEO
Document Type:
Technical Specification
Organization:
Huawei, HiSilicon, China Telecom, CSCN
Author:
Not specified
Target Audience:
Telecom engineers, 3GPP members
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014
Program:
IMS REU (Research Experiences for Undergraduates)
Field:
Estuarine and Coastal Ecology
Document type:
Application form
Target audience:
Undergraduate students in science fields
Deadline:
February 22, 2014
Required materials:
Personal information, academic information, short answer responses, mentor preferences, references, optional demographic and certification details
Institution:
Institute of Medical Sciences, Banaras Hindu University
Department:
Department of Dravyaguna
Location:
Varanasi, India
Document Type:
Institutional record
Subject:
Alumni directory and postgraduate research awards
Coverage Period:
1966–2022
Content:
List of present faculty alumni, retired alumni in Varanasi, distinguished alumni outside the department, and M.D. (Ay.) Dravyaguna dissertations with supervisors and years
Academic Program:
M.D. (Ay.) Dravyaguna
Fields Included:
Name, designation, contact details, dissertation topic, supervisor, year
Event title:
Technical Training for PKI Operators for IMS Radionuclide and Waveform Stations
Dates:
3 to 5 March 2025
Venue:
Vienna International Centre
City:
Vienna
Country:
Austria
Organizing body:
CTBTO Preparatory Commission
Implementing section:
Capacity Building and Training Section (IDC/CBT)
Programme area:
International Monitoring System (IMS) and International Data Centre (IDC)
Type of document:
Registration form
Eligibility:
NDC staff, waveform analysts, radionuclide analysts, station operators, authorized IMS data and IDC product users
Submission deadline:
5 January 2025
Submission channel:
Permanent Mission in Vienna or Ministry of Foreign Affairs
Contact address:
P.O. Box 1200, A-1400 Vienna, Austria
Contact email:
[email protected]
Visa requirement:
Participants must obtain a visa to Austria upon receipt of an official Acceptance Note Verbale from the Provisional Technical Secretariat
Language requirement:
English proficiency indicated in reading, writing, speaking and understanding
Signatories:
Director of Institution; Candidate
Year:
2024
Region / City:
Cranbourne West, Vic
Topic:
Electrical Infrastructure Civil Works Accreditation
Document Type:
Field Audit Report
Organization:
Rokon Pty Ltd
Author:
UCS Compliance Plus e Pty Ltd
Target Audience:
VEDN Approved System Auditors, Contractor, VEDN
Period of Validity:
2024-2026
Approval Date:
17/6/24
Date of Changes:
N/A
Confidentiality:
STRICTLY CONFIDENTIAL
Training Required:
VEDN Installation of Underground Electrical Infrastructure Module 1
Compliance Certification:
ISO9001, ISO14001, ISO45001
Audit Number:
2024/1
Date of Audit:
17/6/24
Audit Location:
Greenlink Estate St 2, Cranbourne West, Vic
Network Standards Compliance:
Citipower/Powercor, Jemena, AusNet Services, United Energy
Field Audit Summary:
The audit confirms compliance with VEDN network standards and proper documentation management, with verified training and certification of all relevant personnel.
Year:
2026
Region / City:
Goa, India
Theme:
Telecommunications
Document Type:
Meeting Conclusion
Organization:
3GPP TSG-WG SA2
Author:
Huawei, HiSilicon
Target Audience:
Telecommunications professionals, engineers, and network operators
Period of validity:
N/A
Approval Date:
9th Feb 2026
Amendment Date:
N/A
Year:
2026
Location:
Goa, India
Topic:
IMS enhancement for GEO NB-IoT NTN access
Document type:
Meeting contribution / Technical report
Organization:
3GPP TSG-WG SA2
Author:
Huawei, HiSilicon
Audience:
3GPP members, telecom engineers
Agenda item:
20.1.1
Work item / Release:
FS_5GSAT_Ph4-ARC / Rel-20
Reference document:
TR 23.700-19 v1.1.0
Meeting number:
#173
Date:
9–13 February 2026
Summary:
Interim conclusions for Key Issue #2 on IMS enhancement for GEO NB-IoT NTN access including SIP message size reduction, shortened call setup, and B2BUA interoperation
Year:
2025
Region / City:
Global / 3GPP Members
Subject:
Telecommunications; NB-IoT; IMS Voice; GEO Satellite
Document Type:
Technical contribution / Agreement
Organization:
3GPP, vivo Mobile Communication Co.
Authors:
Contributors from vivo, China Mobile, MediaTek, ZTE, Verizon, Ericsson, CATT, Nokia, Skylo, Thales, China Telecom, Spreadtrum, Xiaomi, OPPO, China Unicom, LG Electronics, Apple, Samsung, NTT DOCOMO, CSCN, SHARP
Target Audience:
3GPP Working Groups RAN1, RAN2, SA2, SA4
Period of Effect:
2025 – until next update
Approval Date:
August 2025
References:
3GPP TR 23.700-19, TS 26.132, TR 36.321, TR 36.763, TR 38.811, TR 38.821, FS_ULBC Tdocs
Year:
2021
Region / city:
New York
Subject:
UNDP, Syria refugee crisis, regional response, resilience approach
Document type:
Evaluation report
Institution:
United Nations Development Programme (UNDP)
Author:
UNDP Independent Evaluation Office
Target audience:
UNDP staff, stakeholders involved in refugee response, policy makers
Period of validity:
2015–2019
Approval date:
4 February 2021
Date of changes:
N/A
Year:
Tbc
Region / City:
North West London
Theme:
Musculoskeletal (MSK) Services
Document Type:
Service Specification
Organization:
NHS North West London Integrated Care System
Author:
Tbc
Target Audience:
Healthcare professionals, commissioners, service providers
Period of Validity:
Tbc
Approval Date:
Tbc
Review Date:
Tbc
Year:
2018
Region / City:
London
Topic:
Diabulimia, Integrated Diabetes and Mental Health Pathway
Document Type:
Response Template
Organization:
NHS England
Author:
Not specified
Target Audience:
Health providers, commissioners
Period of Implementation:
15 months
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2024-2027
Region / City:
United States
Topic:
Education Data Collection
Document Type:
Communication Package
Organ / Institution:
National Center for Education Statistics (NCES), U.S. Department of Education
Author:
National Center for Education Statistics (NCES)
Target Audience:
Educational institutions, CEOs, Keyholders, Coordinators
Period of Activity:
2024-2027
Approval Date:
February 2024
Amendment Dates:
May 2025, October 2025, December 2025
Year:
2019
Region / city:
Serbia
Theme:
Labor Management, Project Implementation
Document Type:
Project Report
Organization / Institution:
Ministry of Agriculture, Forestry and Water Management (MAFWM), World Bank
Author:
World Bank, MAFWM
Target Audience:
Government officials, project managers, contractors, workers
Period of validity:
Not specified
Approval Date:
October 12, 2019
Amendment Date:
Not specified