№ lp_1_2_33966
File format: docx
Character count: 28454
File size: 162 KB
A quick reference guide detailing Wi-Fi access, food options, lactation rooms, and multifaith prayer rooms at various healthcare facilities in Ontario.
Year:
2022
Region / City:
Ontario, Canada
Topic:
Healthcare Facilities, Wi-Fi, and Food Options
Document Type:
Reference Sheet
Organization:
Various Healthcare Institutions
Author:
Not specified
Target Audience:
Hospital Staff, Medical Learners, Visitors
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Document Type:
Knowledge Source
Target Audience:
Users of BCL WiFi and Vicbar email
Year:
2024
Region / City:
Athens
Topic:
Telecommunications, Shipping Industry
Document Type:
Press Release
Organization / Institution:
Attica Group
Author:
Kallia Mylonaki
Target Audience:
Passengers, Shipping Industry Professionals
Effective Date:
December 19, 2024
Amendment Date:
N/A
Investment:
€7mn
Duration:
5 years, with a 5-year renewal option
Expansion Plan:
Fleet-wide
Completion Date:
2025
Year:
2013
Region / City:
Geneva
Subject:
High Efficiency Video Coding (HEVC) specification
Document Type:
Liaison Statement
Organization / Institution:
ITU-T SG 16
Author:
Gary J. Sullivan, Thomas Wiegand
Target Audience:
3GPP, 3GPP2, ABU, ATSC, CEA, DLNA, DMB, DVB, ECMA, ETSI, IEC TC 100, IETF, IMTC, ITU-R SG 6, OIPF, OMA, SCTE, SMPTE, UCIF, VESA, W3C, WBU, WiFi Alliance
Effective Period:
January 2013
Approval Date:
January 2013
Modification Date:
N/A
Description:
Formal communication on the consent of the High Efficiency Video Coding (HEVC) standard, with emphasis on its technical capabilities and future development.
Year:
2021
Region / City:
Manhattan, USA
Theme:
Wireless Network Connection
Document Type:
Instruction Manual
Organization / Institution:
Manhattan Area Technical College (MATC)
Author:
Not specified
Target Audience:
MATC Students and Staff
Effective Date:
Not specified
Modification Date:
Not specified
Date:
Friday, September 28, 2018
Event Type:
Speech and Debate Competition
Location:
Taylor 247, Taylor Fireside Lounge, Taylor 248
Duration:
September 28-29, 2018
Note:
Schedule
11:
00-12:00 Registration
12:
00 Draw
1:
30-2:45 Speech Round 1 (Pattern B)
2:
45 Draw
3:
00-4:15 Speech Round 2 (A)
4:
15-5:30 Speech Round 2 (B)
5:
30-7:00 Debate Round 1 (Pattern C)
7:
00-8:30 Debate Round 2 (C)
8:
00 Draw
9:
30-10:45 Speech Round 3 (B)
6:
00-7:00 Debate Finals
Smoking Area:
Smoking Area
Year:
2023
Region / City:
BCPS
Theme:
WiFi Access
Document Type:
User Guide
Institution:
BCPS
Author:
BCPS IT Department
Target Audience:
BCPS Guests
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Virginia, USA
Topic:
Network Connectivity
Document Type:
User Guide
Organization / Institution:
Virginia Western Community College
Author:
Virginia Western IT Department
Target Audience:
Students, Faculty, and Staff of VWCC
Coverage Period:
Current
Date of Draft:
2026
Access Instructions:
Eduroam SSID, VWCCWiFi SSID
Supported Devices:
MacOS, iPhone, Android, Windows
Security Measures:
Firewall, Ad blocking, Malicious URL filtering
Support Contact:
VWCC Help Desk, 540-857-7354, [email protected]
Instructions for Alternative Connection:
Enterprise Active Directory (EAD) WiFi
Technical Requirements:
MyVCCS credentials, system certificates, domain configuration
Network Services Enabled:
Internet, Zoom, Email, VPNs
Year:
2023
Region / city:
New South Wales (NSW)
Topic:
Local government, Land management, Environmental protection
Document type:
Management plan
Organization / institution:
Local Government Councils
Author:
Not specified
Target audience:
Local government officials, land management professionals, community groups
Period of validity:
Ongoing
Approval date:
Not specified
Date of changes:
Not specified
Year:
2023
Region / city:
United States
Topic:
Environmental review
Document type:
Form
Author:
U.S. Department of Housing and Urban Development (HUD)
Target audience:
Continuum of Care (CoC) grantees, environmental review professionals
Period of validity:
N/A
Approval date:
N/A
Date of amendments:
N/A
Year:
2026
Region / City:
United States
Topic:
Steel Erection, Construction Safety
Document Type:
Safety Plan
Note:
Author
Target Audience:
Construction workers, engineers, site managers
Note:
Year
Topic:
Clinical Research Protocol
Document Type:
Supplementary Research Protocol
Target Audience:
Researchers, Clinical Investigators, Institutional Review Boards
Year:
2020
Organization:
Northridge Little League
Location:
Brooktree Park, Sacramento County, California, USA
Document Type:
Risk Assessment and Safety Plan
Responsible Persons:
Kathleen Dippert, Desiree Frees, Jim Mayberry, Kelly Scott, Anissa Kohlberg
Audience:
Board of Directors, Managers, Coaches, Volunteers, Players
Guidelines Referenced:
California Department of Public Health, Sacramento County Health Orders
Measures Included:
Training, Individual Control, Disinfecting, Social Distancing, Screening Procedures
Quarantine Requirements:
Minimum 3 days without fever, symptom improvement, 10 days since onset
Equipment Protocols:
Disinfection of shared items, prohibition of shared water coolers
Facility Protocols:
Occupancy limits, bleacher restrictions, signage for social distancing
Note:
Year
Year:
2023
Region / City:
United States
Topic:
Safety and Occupational Health
Document Type:
Worksheet
Agency:
U.S. Army Corps of Engineers (USACE)
Author:
U.S. Army Corps of Engineers
Target Audience:
USACE employees involved in site-specific safety and health planning
Period of Validity:
Ongoing
Approval Date:
August 2023
Modification Date:
Not specified
Year:
Not specified
Region / City:
United States
Topic:
Medical research protocols, ethics
Document type:
Protocol Addendum
Institution:
United States Army Medical Research and Development Command (USAMRDC)
Author:
Not specified
Target audience:
Research institutions, ethics committees
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
Not specified
Region / City:
Maui District, Hawaii, USA
Document Type:
Construction Guidance / Environmental Compliance Template
Organization:
State of Hawaii, Department of Transportation Highways Division (HWY-M)
Target Audience:
Designers and contractors of HWY-M construction projects
Project Requirement:
SSBMP Plan for projects under one acre; NPDES Permit and SWPPP for projects over one acre
Attachments:
Project Maps and Plans, Training Log and Records, SSBMP Amendment Log
Responsible Parties:
Project-specific personnel (names and contacts to be filled)
Project Scope:
Site description, grading limits, drainage, soil and construction material storage
Regulatory Compliance:
Federal, state, and county environmental regulations
Year:
2023
Region / City:
Waimārama
Topic:
Risk Assessment, Emergency Procedures
Document Type:
Risk Assessment
Organization:
Brook Waimārama Sanctuary Trust (BWST)
Author:
Not specified
Target Audience:
Schools, Teachers, Group Leaders
Validity Period:
2023
Approval Date:
Not specified
Amendment Date:
Not specified
Risk Index:
L = Low, M = Medium, H = High, E = Extreme
Emergency Procedures:
Yes
Health & Safety:
Yes
Note:
Year Updated
Institution:
Northeastern University
Program:
Exposure Control Plan (ECP)
Scope:
Elimination or minimization of exposure to human blood, blood products and other potentially infectious material (OPIM)
Document Type:
Exposure control plan template for non-laboratory environments
Regulatory Reference:
Needlestick Safety and Prevention Act (2000)
Responsible Unit:
Biosafety Program
Contact Email:
[email protected]
Applicable Areas:
Non-laboratory workplaces including research, teaching and clinical settings
Exposure Categories:
Category I (expected occupational exposure), Category II (possible unplanned exposure)
Target Personnel:
Faculty, staff, graduate students, students in designated programs
Training Requirement:
Annual Bloodborne Pathogens training (initial or refresher within 12 months)
Vaccination Policy:
Hepatitis B vaccination reimbursement for eligible employees; declination form available
Review Requirement:
Annual review and update; annual sharps safety device evaluation
Required Forms:
Safety Needle/Sharps Annual Review Form; Sharps Safety Device Evaluation Form
Personal Protective Equipment:
Safety glasses, goggles, face shield, lab coat, disposable gown, coveralls, surgical mask
Engineering Controls:
Sharps containers, incineration box with red biohazard bags, tongs or forceps for broken glass
Work Practice Controls:
Universal precautions, prohibition of eating or drinking in exposure areas, immediate sharps disposal, handwashing protocols
Decontamination:
Cleaning of contaminated surfaces and equipment at the end of each work shift
Recordkeeping:
Sharps injury log; annual documentation retained on file
Year:
2024
Region / City:
Pennsylvania, USA
Subject:
Environmental permitting and storage tank installation
Document type:
Invitation for Bid
Agency / Organization:
Department of Environmental Protection (DEP)
Author:
Department of Environmental Protection
Target audience:
Qualified Professionals, engineers, geologists, land surveyors
Scope period:
Upon contract award and permit application requests
Application deadline:
Specified in the IFB
Regulatory reference:
Article XVIII, §§1803-1805 of Act No. 54 of 2024 (SPEED Act); 25 Pa. Code Chapter 245
Required qualifications:
Licensed professional engineer, geologist, or land surveyor; minimum five years relevant experience; no conflicts of interest
Responsibilities:
Permit application review, deficiency identification, recommendation reports, public notice drafts, participation in hearings if required
Special requirements:
Review geotechnical and engineering analyses; ensure compliance with regulatory standards; use DEP-provided templates and guidance documents