№ lp_1_2_68407
File format: docx
Character count: 5668
File size: 504 KB
This document outlines how to create a slide presentation for a continuing pharmacy education activity that meets ACPE standards for content, legal compliance, and active learning.
Year:
2023
Region / City:
Gainesville, Florida
Topic:
Pharmacy Education, Continuing Education
Document Type:
Guideline
Institution:
University of Florida College of Pharmacy
Author:
University of Florida College of Pharmacy Office of Continuing Pharmacy Education
Target Audience:
Pharmacy Educators, Pharmacists, Pharmacy Technicians
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / city:
United States
Topic:
Market research, Government acquisition, Non-Expendable Equipment
Document Type:
Sources Sought Notice
Organization / Institution:
Veterans Health Administration (VHA)
Author:
Unknown
Target Audience:
Potential suppliers and contractors
Validity Period:
Until the response date
Approval Date:
April 29, 2019
Date of Changes:
Not specified
Year:
2025
Region / City:
Hong Kong
Topic:
Supply and installation of Slide Stainer
Document Type:
Request for Information
Organization / Institution:
Health Bureau, Government of Hong Kong Special Administrative Region
Author:
Chinese Medicine Hospital Project Office (CMHPO)
Target Audience:
Suppliers of Slide Stainers
Validity Period:
From 2025 onwards
Approval Date:
2025
Modification Date:
Not specified
Year:
2023
Region / City:
N/A
Subject:
Emulator Software for Bygrave Slide Rule
Document Type:
User Manual
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Users of the Bygrave Slide Rule Emulator
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2010
Note:
Region / City
Topic:
Digital Storytelling, Software Tutorial
Document Type:
Instructional Guide
Author:
Sheneman
Year:
2010
Publisher:
Microsoft Corporation
Type:
Instructional guide
Audience:
Teachers and educators
Software:
Windows Live Movie Maker
System requirements:
Windows XP SP2, Windows Vista, Windows 7, or Windows Server 2008; 512 MB RAM (128 MB for XP); 1024x768 resolution; DirectX 9.0 compatible video card
Supported file formats:
.wmv, .asf, .wm, .m2ts, .m2t, .mov, .qt, .avi, .dvr-ms, .wtv, .3gpp, .3g2, .3gp2, .3gp, .mp4, .m4v, .mpeg, .mpg, .mpe, .m1v, .mp2, .mpv2, .mod, .vob, .jpg, .jpeg, .tif, .tiff, .gif, .bmp, .png, .wdp
Features:
AutoMovie creation, rich visual effects, photo animations, soundtrack addition, YouTube/Facebook publishing
Usage:
Classroom activities, student video projects, historical timelines, physics demonstrations, literature recitations
Copyright:
© 2010 Microsoft Corporation
Trademarks:
Microsoft, Bing, DirectX, Internet Explorer, Windows, Windows Live, Windows Server, Windows Vista
Note:
Year
Topic:
Navigation, Slide Rule Comparison
Document Type:
Test/Comparison Report
Year:
2026
Region / City:
North Dakota
Topic:
Engineering Services, Geotechnical Design
Document Type:
Request for Proposal (RFP)
Organization:
North Dakota Department of Transportation
Author:
Ronald J. Henke, PE
Target Audience:
Consultants, Engineering Firms
Effective Period:
February 4, 2026 - December 1, 2026
Approval Date:
February 4, 2026
Amendment Date:
N/A
Note:
Year
References:
UL 325 Gate Operator Requirements, ASTM F 2200, ASTM F 1184, AWS D1.2, ASTM A 123, ASTM F 2656, ASCE-7 Wind Load Requirements, etc.
Year:
2026
Region / City:
Greenwich, NY, USA
Subject:
Automated Vehicular Gate Systems
Document Type:
Technical Specification
Organization / Institution:
Tymetal Corp.
Author:
Tymetal Engineering Team
Target Audience:
Contractors, Installers, Engineers
Standards Referenced:
UL 325, ASTM F2200, ASTM F1184, AWS D1.2, ASCE-7
Equipment Included:
Gate system, slide gate operator, gate components, accessories
Performance Criteria:
Continuous duty, wind load compliance, structural integrity, certified welding procedures
Installation Requirements:
Shop drawings, product data, submittals, certification of performance criteria
Power Requirements:
115/230 VAC Single Phase, 50/60 Hz, optional solar input
Battery Backup:
Integrated 12 VDC batteries with emergency release
Year:
2023
Region / City:
Greenwich, NY
Subject:
Automated vehicular gate system specification
Document Type:
Technical specification
Organization:
Tymetal Corp.
Author:
Not specified
Target Audience:
Engineers, contractors, manufacturers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Greenwich, NY, USA
Subject:
Structural Hydraulic Gate Systems
Document Type:
Technical Specification
Organization / Institution:
Tymetal Corp.
Author:
Tymetal Engineering Department
Target Audience:
Contractors, Engineers, Installation Technicians
Standards Referenced:
UL 325, ASTM F2200, ASTM F1184, AWS D1.2, ASCE-7
Gate Class:
III and IV installations
Components:
Hydraulic Gate Operator, Structural Gate Frame, Counterbalance, Gate Track System, Gate Truck Assemblies
Safety Requirements:
Multiple external sensors, pedestrian gate separation, specific usage class labeling
Performance Criteria:
Full power hydraulic testing, mechanical stress testing, electrical overload testing, structural interlocking and counterbalance specifications
Submittals Required:
Product Data, Shop Drawings, Certification of Performance Criteria
Year:
2026
Region / City:
United States
Subject:
Industrial and commercial gate systems
Document Type:
Technical specification and installation guide
Organization / Manufacturer:
Merchants Metals®
Author:
Merchants Metals® Technical Department
Target Audience:
Contractors, construction engineers, facility managers
Standards Compliance:
ASTM F1184 Type II Class 2, ASTM F2200, UL-325
Material Specifications:
Aluminum Alloy 6005-T61, 9-gauge chain link options, polymer-coated finishes
Gate Dimensions:
31’0” to 40’0” dual top track, custom sizes available
Warranty:
7 years against defects in material and workmanship
Installation Requirements:
Concrete footings, plumb posts, electrical grounding for automated gates
Safety Considerations:
Compliance with UL-325 safety standards for automated vehicular gates
Testing:
Salt spray corrosion, impact resistance, adhesion, and gloss per ASTM standards
Year:
2026
Region / City:
Not specified
Topic:
Community health care system change
Document type:
Assessment instructions / educational guidance
Institution:
Capella University
Program:
Master of Science in Nursing (MSN)
Target audience:
Policymakers and executive leaders
Purpose:
To develop a recorded presentation requesting policy and financial support
Required tools:
Microsoft PowerPoint, Kaltura Media, audiovisual recording equipment
Slide count:
10–15 slides
Content requirements:
Evidence-based arguments, budget estimates, stakeholder analysis, change proposal, community health implications
References:
3–5 credible peer-reviewed or professional sources
Year:
2026
Region / City:
United States, Greenwich, NY
Subject:
Automated Vehicular Gate Construction
Document Type:
Technical Specification
Organization / Institution:
Tymetal Corp.
Author:
Engineering Department
Applicable Standards:
ASTM F 2200, ASTM F 1184, AWS D1.2, UL 325
Target Audience:
Contractors, engineers, installers
Gate Dimensions:
As per detail drawings
Material:
Aluminum alloy 6005A-T61 or 6005A-T5, galvanized steel components
Performance Requirements:
Continuous duty, load-bearing certification, structural integrity
Submission Requirements:
Product data, shop drawings, certifications
Installation Guidelines:
Gate frame assembly, track mounting, counterbalance specifications
Year:
2020
Region / city:
Wisconsin, Milwaukee
Theme:
Janitorial Services
Document Type:
Request for Bid
Organization / Institution:
University of Wisconsin-Milwaukee
Author:
Donna Lumsden
Target Audience:
Vendors, Suppliers
Period of Validity:
Until 8/20/20
Approval Date:
7/29/20
Date of Changes:
Not specified
Year:
2019
Region / City:
United States
Topic:
Supplemental Security Income (SSI) Eligibility
Document Type:
Government Report
Agency / Organization:
Social Security Administration (SSA)
Author:
Social Security Administration
Target Audience:
SSI recipients or their representative payees
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Region / City:
N/A
Subject:
Continuing Education for Certified Range Management Consultants
Document Type:
Procedures
Organization:
Society for Range Management (SRM)
Author:
N/A
Target Audience:
Certified Range Management Consultants (CRMC)
Effective Period:
N/A
Approval Date:
N/A
Modification Date:
07-24-19
Year:
2025
Region / City:
Shropshire, Telford, and Wrekin
Theme:
Healthcare Dispute Resolution
Document Type:
Policy
Organization / Institution:
NHS Shropshire, Telford and Wrekin
Author:
Brett Toro-Pearce, Colin Evans, Cezar Sarbu, Michael Bennett, Amanda Benton
Target Audience:
Healthcare Providers, Local Authorities
Validity Period:
2025–2027
Approval Date:
30/09/2025
Amendment History:
Version 6.1 Final Approved
Dissemination Date:
13/10/2025
Implementation Date:
13/10/2025
Year:
2022
Organization:
Engineering Institution of Zambia (EIZ)
Document Type:
Guidance / Policy Document
Target Audience:
Engineers, Technologists, Technicians, Craftspersons
Scope:
National (Zambia)
CPD Points Requirement:
40 units per year, 21 verifiable
Methods of Completion:
Unit route, External Regulatory Body route
CPD Activities:
Technical tours, webinars, seminars, workshops, lectures, congresses, courses, other professional education activities
Evidence Retention:
3 years
Monitoring:
Annual audits by MCPD subsections