№ files_lp_4_process_1_46518
File format: docx
Character count: 2497
File size: 258 KB
Commercial invoice source detailing the sale, shipment, and payment instructions for medical diagnostic kits from a US manufacturer to a Malaysian buyer.
Year:
2018
Region / City:
Hemet, California, USA; Shah Alam, Selangor, Malaysia
Subject:
Medical and laboratory supplies
Document Type:
Proforma Invoice
Organization:
Biotron Diagnostics Inc.
Author:
Jim Kemp
Recipient:
Premier Diagnostics Sdn Bhd
Payment Terms:
Cash / Wire Transfer
Delivery Period:
2–3 weeks from order date
Invoice Number:
8006
Purchase Order Number:
141118(0B001)
Date Ordered:
14 November 2018
Country of Origin:
USA
Transportation:
FedEx / DHL / UPS / Schenker Intl.
Bank Details:
Citibank, Account #3844029888, ABA Routing 322271724, SWIFT Code Citi US 33
Wire Transfer Fee:
$30–$35
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Document type:
Instructor lab activity
Platform:
Cisco Packet Tracer
Topic:
REST APIs and SDN controllers
Related technologies:
Network Controller API, REST, Postman, Python, Visual Studio Code
Intended audience:
Networking and DevNet students
Environment:
DEVASC Virtual Machine
Authentication method:
Ticket-based REST API authentication
Network scope:
Multi-device routed and switched topology
Source organization:
Cisco
Access requirements:
External REST API access enabled
Instructional context:
Guided hands-on lab
Organization:
Indah Water Konsortium Sdn Bhd
Document Type:
Handover Sign-Off Form
Type of System:
Connection to Existing Manhole
Subject Matter:
Sewerage Works
Regulatory Framework:
Water Services Industry (Planning, Design and Construction of Sewerage System and Septic Tank) Rules 2013
Certifying Authority:
Commission
Parties Involved:
Qualified Person; Developer (Owner); Service Licensee; Certifying Agency; Federal Government
Obligations:
Issuance of Certificate of Completion; Provision of Bank Guarantee; Rectification of Defects; Transfer of Land; Surrender of Sewerage System
Geographical Scope:
Federal Government of Malaysia
Year:
2018
Region / City:
Janamanjung
Subject:
Environmental Performance
Document Type:
Monthly Report
Organ / Institution:
TNB Janamanjung Sdn Bhd
Author:
Chemical Services and Environment Section
Target Audience:
Internal stakeholders, environmental compliance officers
Effective Period:
December 2018
Approval Date:
N/A
Amendment Date:
N/A
Context:
Monthly environmental performance report outlining monitoring data, regulatory compliance, and activities related to environmental standards at the Sultan Azlan Shah Power Station.
Document Type:
Press Release
Date:
2 December 2015
Location:
Shah Alam, Malaysia
Companies Involved:
CTRM Aero Composites Sdn Bhd; Spirit AeroSystems Inc.; Composites Technology Research Malaysia Sdn Bhd; DRB-HICOM Berhad
Industry:
Aerospace and Composites Manufacturing
Subject:
Contract Extension and Commercial Revision
Contract Duration:
Extended until 2025
Programs Covered:
Airbus Single Aisle; Airbus A350 J Nose and Root End Fixed Fairing (REFF); Boeing sustains programme
Signatories:
Francis Hiew; Che Akhma Ismail
Witnesses:
YB Dato’ Lee Chee Leong; YBhg Brig. Gen. (K) Tan Sri Dato’ Sri (Dr) Haji Mohd Khamil Jamil
Year:
2024
Region / City:
Brunei Darussalam
Topic:
Engineering, Power Utilities
Document Type:
Job Vacancy
Organization:
Berakas Power Company Sdn Bhd
Author:
Berakas Power Company Sdn Bhd
Target Audience:
Brunei Citizens and Permanent Residents
Effective Period:
Until 3rd February 2024
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Petaling Jaya, Selangor, Malaysia
Theme:
Internship, Risk Management, Fraud Prevention, Financial Services
Document Type:
Internship Report
Organization / Institution:
Merchantrade Asia Sdn Bhd
Author:
Not specified
Target Audience:
Students, professionals in financial services, and those interested in risk management and fraud prevention
Period of validity:
2024
Approval Date:
Not specified
Date of amendments:
Not specified
Organization:
Indah Water Konsortium Sdn Bhd
Document Type:
Handover Sign-Off Form
Type of System:
Connection to Existing Manhole
Subject Matter:
Sewerage Works
Regulatory Framework:
Water Services Industry (Planning, Design and Construction of Sewerage System and Septic Tank) Rules 2013
Certifying Authority:
Commission
Parties Involved:
Qualified Person; Developer (Owner); Service Licensee; Certifying Agency; Federal Government
Obligations:
Issuance of Certificate of Completion; Provision of Bank Guarantee; Rectification of Defects; Transfer of Land; Surrender of Sewerage System
Geographical Scope:
Federal Government of Malaysia
Year:
2018
Region / City:
Janamanjung
Subject:
Environmental Performance
Document Type:
Monthly Report
Organ / Institution:
TNB Janamanjung Sdn Bhd
Author:
Chemical Services and Environment Section
Target Audience:
Internal stakeholders, environmental compliance officers
Effective Period:
December 2018
Approval Date:
N/A
Amendment Date:
N/A
Context:
Monthly environmental performance report outlining monitoring data, regulatory compliance, and activities related to environmental standards at the Sultan Azlan Shah Power Station.
Document Type:
Press Release
Date:
2 December 2015
Location:
Shah Alam, Malaysia
Companies Involved:
CTRM Aero Composites Sdn Bhd; Spirit AeroSystems Inc.; Composites Technology Research Malaysia Sdn Bhd; DRB-HICOM Berhad
Industry:
Aerospace and Composites Manufacturing
Subject:
Contract Extension and Commercial Revision
Contract Duration:
Extended until 2025
Programs Covered:
Airbus Single Aisle; Airbus A350 J Nose and Root End Fixed Fairing (REFF); Boeing sustains programme
Signatories:
Francis Hiew; Che Akhma Ismail
Witnesses:
YB Dato’ Lee Chee Leong; YBhg Brig. Gen. (K) Tan Sri Dato’ Sri (Dr) Haji Mohd Khamil Jamil
Year:
2024
Region / City:
Brunei Darussalam
Topic:
Engineering, Power Utilities
Document Type:
Job Vacancy
Organization:
Berakas Power Company Sdn Bhd
Author:
Berakas Power Company Sdn Bhd
Target Audience:
Brunei Citizens and Permanent Residents
Effective Period:
Until 3rd February 2024
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Petaling Jaya, Selangor, Malaysia
Theme:
Internship, Risk Management, Fraud Prevention, Financial Services
Document Type:
Internship Report
Organization / Institution:
Merchantrade Asia Sdn Bhd
Author:
Not specified
Target Audience:
Students, professionals in financial services, and those interested in risk management and fraud prevention
Period of validity:
2024
Approval Date:
Not specified
Date of amendments:
Not specified
Note:
Year
Author:
Jazzmin Huber
Contextual Description:
Interview about personal experiences with BHD diagnosis, its impact on lifestyle, and advice on flying for individuals with BHD.