№ files_lp_4_process_3_061363
File format: docx
Character count: 6335
File size: 23 KB
Note:
Year
Standards Referenced:
ANSI A202.1, ASCE 7, ASTM A36/A36M, ASTM A53/A53M, ASTM A123/123M, ASTM A153/A153M, ASTM A283/A283M, ASTM A307, ASTM A325, ASTM A500/A500M, ASTM A501, ASTM A653/A653M, ASTM A1011/A1011M, ASTM A1008/A1008M, ASTM E935, ASTM E985, AWS A2.4, AWS D1.1/D1.1M, BNAAMM AMP 510, NAAMM MBG 531, SSPC (Steel Structures Painting Council)
Description:
This document provides specifications and standards for the design, fabrication, and installation of steel stair systems, including structural steel sections, stair treads, landings, railings, and related components, in accordance with the Florida Building Code.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
City:
Lowell, Massachusetts
Project name:
Outdoor Granite Stairs Resetting and Repairs at the LMA
Facility:
Lowell Memorial Auditorium
Document type:
Public procurement bid and contract documentation
Issuing authority:
City of Lowell
Municipal office:
City Manager
City manager:
Thomas A. Golden, Jr.
Procurement authority:
Chief Procurement Officer
Bid opening date:
February 14, 2024
Pre-bid site inspection date:
February 6, 2024
Bid submission method:
Sealed bids
Applicable wage standards:
State Prevailing Wage Rates and Federal Davis-Bacon Rates
Required certifications:
DCAMM certification (Masonry)
Bond requirements:
5% bid security; 100% payment bond; 100% performance bond
Award method:
Lowest qualified bidder
Target bidders:
Qualified construction contractors
Context:
Municipal procurement documentation governing the solicitation, submission, evaluation, and contractual conditions for construction work involving granite stair resetting and repairs at a public auditorium.
Year:
2021
Region / City:
Seattle, Amsterdam, Denver
Topic:
Architecture, Sustainability, Social Equity
Document Type:
Article
Author:
Johnna S. Keller
Target Audience:
Architects, Designers, Sustainability Advocates, Disability Studies Scholars
Date of Approval:
N/A
Date of Changes:
N/A
Year:
2024
Region / City:
United Kingdom
Subject:
Structural Integrity of Metal Components in Nuclear Industry
Document Type:
Technical Assessment Guide
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Inspector and Principal Inspector
Target Audience:
ONR Inspectors and Nuclear Industry Stakeholders
Effective Period:
2024–2026
Approval Date:
September 2024
Next Review Date:
April 2026
Year:
Not specified
Region / City:
Not specified
Topic:
Sheet Metal Design and Engineering Checklist
Document Type:
Checklist
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Suppliers
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A checklist for engineers to confirm essential items when preparing drawings for custom sheet metal, ensuring compliance with material, design, and manufacturing standards.
Note:
Year
Year:
2024
Region / City:
Jackson, MI
Subject:
Roofing Replacements
Document Type:
Request for Proposals (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jackson County Parks
Target Audience:
Contractors, Roofing Companies
Period of Action:
2024
Approval Date:
1/19/2024
Date of Changes:
N/A
Authors:
M. P. Browne; C. O’Rourke; Nathan Wells; A. Mills
Affiliation:
School of Chemistry and Chemical Engineering, Queen’s University Belfast
Country:
United Kingdom
Contact email:
[email protected]
Keywords:
Electrochemistry; Sustainable chemistry; Catalysis; Water splitting
Document type:
Scientific research article
Research field:
Electrocatalysis and photoelectrochemistry
Synthesis method:
Adams method using molten sodium nitrate
Materials studied:
RuO2; Mn2O3; Co3O4; NiO
Electrochemical reactions:
Hydrogen evolution reaction; Oxygen evolution reaction
Electrolyte:
1 M NaOH
Electrode preparation:
Solvent-free pressed powder discs with PTFE binder
Energy source:
Silicon solar cell under AM 1.5 G illumination
Source type:
Experimental laboratory study reporting synthesis, characterization, and electrochemical performance of metal oxide catalysts for solar-driven water splitting.
Year:
2026
Region / city:
Australia
Subject:
Roofing systems and associated works
Document type:
Worksection Template / Technical specification
Organization / institution:
NATSPEC, FIELDERS Steel Roofing Pty Ltd
Intended audience:
Engineers, architects, construction companies
Standards referenced:
AS/NZS 1170.2 (2021), AS 4055 (2021), AS/NZS 3500.3 (2021), AS 2312.1 (2014), AS 4312 (2019), AS 1657 (2018), AS/NZS 1170.3 (2003)
Materials covered:
FIELDERS seamed sheet metal, COLORBOND® prepainted steel, roof plumbing, skylights, roof hatches, roof windows, roof ventilators
Environmental considerations:
Bushfire protection, snow load, green roof design, recycled content, corrosion resistance
Responsibilities:
Provide FIELDERS specialised sheet metal roofing system as documented
Design parameters:
Wind pressure, rainfall intensity, R-Value, U-Value
Related worksections:
0193, 0342, 0343, 0411, 0461, 0471, 0472, 0552, 0802, 0423, 0425, 0426, 0427, 0428, 0429, 0311p, 0341p, 0436p, 0437p
Year:
2025
Note:
Region / city
Topic:
Metal fabrication, safety, welding, technical standards
Document type:
Standards
Target audience:
Students, metal fabrication professionals
Effective period:
July 2025
Year:
Not specified
Region / City:
Not specified
Topic:
Metal composite materials, rain screen systems, and performance requirements
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, builders, and engineers involved in construction
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Region / City:
Oakland, CA
Subject:
Architectural Metal Finishes
Document Type:
Specification
Organization:
Móz Designs, Inc.
Manufacturer:
Móz Designs, Inc.
Target Audience:
Architects, Contractors
Warranty:
Yes
Installation Instructions:
Included
Date of Approval:
September 10, 2019
Materials:
Aluminum, Stainless Steel
Thickness:
Various (from .040” to 3/16”)
Finish Options:
Polycoat Gloss, Polycoat Matte, Powder Coat
Custom Options:
Yes
Examination:
Required prior to installation
Humidity Range:
80% or lower
Storage Conditions:
Avoid direct sunlight and moisture
Product Literature:
Yes
Samples:
Required
Year:
2022
Region / City:
N/A
Subject:
Stage 2 Material Solutions
Type:
Learning and Assessment Plan
School:
N/A
Teacher(s):
N/A
Program variant code:
A-W
Credits:
20
Assessment Type 1:
Specialised Skills Tasks – 20%
Assessment Type 2:
Design Process and Product – 50%
Assessment Type 3:
Resources Study – 30%
Endorsement:
Approved by principal or delegate
Date:
N/A
Changes:
Yes, outlined in Addendum
Evaluation method:
Multimodal (4 minutes / 600 words)
Note:
Year
Subject:
Wall Panel Products
Document Type:
Specification Guide
Organ / Institution:
Kingspan Insulated Panels
Target Audience:
Specifiers, Design Professionals
Context:
Guide specification for insulated exterior wall panels composed of IPN QuadCore insulation between metal facings, designed to reduce installation time and provide high-efficiency insulating core, exterior weather barrier, and vapor barrier.
Year:
2020
Region / city:
United Kingdom
Theme:
Climate, Weather, Data, Animation
Document type:
Research Statement
Organization / Institution:
Not specified
Author:
Harry Meadows
Target audience:
Scholars, enthusiasts of climate data, animation, and technology
Period of validity:
Not specified
Approval date:
25th August, 2020
Date of modifications:
Not specified
Note:
Year