№ lp_1_2_17679
File format: docx
Character count: 32806
File size: 138 KB
This document is a technical proposal for defining frame formats in IEEE 802.11 for Co-BF and Co-SR Trigger frames.
Year:
2026
Note:
Region / City
Subject:
Wireless LANs, Frame Formats
Document Type:
Technical Proposal
Author:
Jason Yuchen Guo, Arik Klein, Mahmoud Hasabelnaby, Alice Chen
Target Audience:
Technical experts, IEEE 802.11 working group members
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
2026-01-07
Note:
Author(s)
CID:
9409
Clause:
37.15.2.1.4
Page.line:
225.25
Proposed Change:
Define a mechanism for allowing the use of the CO-BF invite/response/trigger frame to negotiate GI
Resolution:
Revised
Discussion:
Allowing Additional Negotiation of GI Durations Between Co-BF APs during Co-BF Transmission Procedure
Period of validity:
Not specified
Date of approval:
2026-01-07
Date of changes:
Not specified
Year:
2021
Region / city:
Western Australia
Topic:
Generator Performance Standards, Trigger Events
Document type:
Technical Standard
Author:
Western Power
Target audience:
Market Participants, Network Operators, AEMO
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2016
Region / city:
N/A
Topic:
LXI Wired Trigger Bus
Document type:
Technical specification
Organization / institution:
LXI Consortium
Author:
N/A
Target audience:
Engineers, technical professionals
Validity period:
N/A
Approval date:
8 November 2016
Amendment date:
N/A
Year:
2022
Region / City:
N/A
Subject:
LXI Wired Trigger Bus Standard
Document Type:
Technical Specification
Organization / Institution:
LXI Consortium
Author:
LXI Consortium
Target Audience:
Engineers, Developers, and Technical Professionals
Period of Validity:
N/A
Approval Date:
May 10, 2022
Amendment Date:
N/A
Date:
2025-03-05
Author(s):
Po-Kai Huang, Ido Ouzieli, Danny Alexander, Danny Ben-Ari, Johannes Berg, Laurent Cariou, Alfred Asterjadhi, Abhisehek Patil, Liwen Chu, Li-Hsiang Sun, Nehru Bhandaru, Yanjun Sun, Jarkko Kneckt
Affiliation:
Intel, Qualcomm, NXP, Mediatek, Broadcom, Apple
Type:
Technical specification draft
Topic:
Wireless LAN control frame protection
Document identifier:
IEEE P802.11
Revision history:
Rev 0 – Initial version; Rev 1 – Fix wrong reference
Target audience:
IEEE 802.11 working group members
Frame types:
Trigger, BA, BAR
Security mechanisms:
Protected Control bit, Key ID field, PN field, MIC field
Protocols referenced:
RSNXE, Control frame integrity protocol (CIP)
Year:
2026
Region / City:
Chernobyl, Former Soviet Union
Subject:
Military Technology, Environmental Modification, Nuclear Disaster
Document Type:
Documentary, Report
Institution:
Kla.TV
Author:
Werner Altnickel
Target Audience:
General Public, Scholars of History and Military Technology
Period of Action:
1986, 1997, 2002
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014
Document Type:
Technical Specification
Version:
0.321 Draft
Authors:
Dan Edmunds, Yuri Ermoline, Wade Fisher, Philippe Laurens
Organization:
ATLAS Collaboration, CERN
System:
ATLAS Level-1 Calorimeter Trigger (L1Calo)
Module:
FEX-Hub
Phase:
Phase-I (Run 3)
Prototype:
Yes
Installation Period:
Long Shutdown 2 (LS2)
Target Operation:
Run 3 and Run 4
Related Documents:
L1Calo Phase-I eFEX, jFEX, Hub-ROD Specifications; ATCA Short Form Specification; TTC-FMC Specification
Document Type:
Guidance document
Subject:
Post-Construction Stormwater Control Plans (SWCP)
Issuing Body:
Central Coast Water Quality Control Board
Applicable Requirements:
Post-Construction Stormwater Management Requirements (PCRs)
Performance Requirements:
No. 2 – Water Quality Treatment; No. 3 – Runoff Retention; No. 4 – Peak Management
Geographic Scope:
Central Coast region
Intended Audience:
Project applicants and municipal representatives
Sections:
Documentation of Applicable Requirements; General Project Data; Site Assessment; Applied Stormwater Control Measures; Operations and Maintenance Protocols; Summary and Certification
Referenced Frameworks:
TMDL Wasteload Allocation Attainment Plan; Watershed Management Zones; Designated Groundwater Basin; Approved Urban Sustainability Area
Regulatory Context:
Compliance with PCRs building block structure including Performance Requirement No. 1 – Site Design and Runoff Reduction
Year:
2023
Region / City:
Northumbria
Theme:
Anti-social behavior, Case Review
Document Type:
Form
Organization:
Office of the Police and Crime Commissioner
Target Audience:
Individuals experiencing anti-social behavior, individuals raising requests on behalf of others
Period of validity:
Ongoing
Date of approval:
Not specified
Date of amendments:
Not specified
Year:
2018
Region / City:
North Lake Tahoe, California, USA
Subject:
Energy infrastructure, powerline upgrade, regulatory approval
Document Type:
Resolution
Organization / Agency:
Public Utilities Commission of the State of California
Author:
Energy Division, Public Utilities Commission
Target Audience:
Liberty Utilities, NTCAA, regulatory stakeholders
Approval Date:
August 9, 2018
Reference:
Advice Letter 64-E-A, Decision D.15-03-020
Estimated Cost:
$9 million
Phase:
2
Technical Review:
Ascension Study and CEC Staff Assessment
Dispute:
Protest by North Tahoe Citizen Action Alliance (NTCAA) upheld
Construction Authorization:
Denied
Year:
2017
Region / City:
California
Subject:
Energy Infrastructure, Utility Regulation
Document Type:
Resolution
Organization / Institution:
California Public Utilities Commission (CPUC)
Author:
Energy Division, CPUC
Target Audience:
Utility companies, regulatory authorities, energy professionals
Effective Date:
November 30, 2017
Amendment Date:
N/A
Project Phase:
Phase 2, NLT System Upgrade
Estimated Cost:
$9 million
Approval Status:
Denied
Safety Considerations:
Public safety, system reliability