№ files_lp_4_process_3_119513
Report on the addition and technical specifications of two USP 2010 SWS-U ballast distributing and profiling machines to Polish State Railways, including capacity improvements, operational features, and control systems.
Year: 2026
Region / city: Poland
Topic: Railway maintenance, ballast management
Document type: Technical report
Organization: Polish State Railways (PKP)
Author: PKP Technical Department
Target audience: Railway engineers, maintenance planners
Equipment model: USP 2010 SWS-U
Machine features: Centre plough, shoulder ploughs, large sweeper unit, hydraulic hopper lift
Control system: P-IC 2.0 Plasser Intelligent Control
Hopper capacity: 7 m³ to 70 m³
Purpose: Ballast distribution and profiling on track and turnouts
Context: Implementation status: Added to fleet, operational
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.