№ files_lp_3_process_7_050959
File format: docx
Character count: 11630
File size: 69 KB
Summary of issues and contributions discussed during the meeting about dual DRX configurations for FR1+FR2 CA and their impact on system behavior and interruptions.
Year:
2020
Region / city:
N/A
Topic:
Dual DRX for FR1+FR2 CA
Document type:
Meeting notes
Organization:
3GPP
Author:
Moderator (Apple)
Target audience:
RAN4 participants
Period of validity:
N/A
Date of approval:
N/A
Date of amendments:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / city:
Electronic Meeting
Topic:
PMPR Reporting Solution
Document type:
Meeting Agenda and Discussion Summary
Organization:
3GPP TSG-RAN WG4
Author:
Moderator (OPPO)
Target audience:
3GPP Working Groups, RAN Participants
Period of validity:
August 17th – 28th, 2020
Date of approval:
August 17th, 2020
Date of changes:
None
Technical details:
P-MPR, NR_RF_FR2
Discussion items:
3-bit and 4-bit P-MPR reporting granularity, PMPR thresholds, RLF avoidance
Context:
A summary of technical proposals and observations from the 96e 3GPP TSG-RAN WG4 electronic meeting regarding P-MPR reporting and related signal processing issues.
Year:
2025
Location:
Dallas, Texas, USA
Organization:
3GPP TSG-RAN4
Document type:
Working Document
Source:
vivo
Title:
WF on TRP_TRS_MIMO_OTA_Ph3
Topics:
Rel-19 OTA test methodologies, Rel-19 OTA requirements
Date of meeting:
November 17–21, 2025
Target audience:
3GPP members, network equipment manufacturers, device manufacturers
Agreements:
Adopt CTIA outcome on NB-IoT NTN TRP TRS test time reduction, handle Rel-19 measurement data pool, tentative requirements for TRP/TRS performance metrics
Proposals:
Ephemeris consistency check, HARQ feedback disabling, NR NTN OTA testing adjustments
Moderators:
MCC
Deadline for new device results:
December 31, 2025
Year:
2026
City:
Gothenburg
Country:
Sweden
Dates of meeting:
9 February 2026 – 12 February 2026
Event:
3GPP TSG-RAN4 Meeting #118
Agenda item:
7.3.1
Topic:
NR UE OTA enhancements and NTN testing methodologies
Document type:
Meeting working forum notes and agreements
Organization:
3rd Generation Partnership Project
Working group:
3GPP TSG RAN WG4
Source organization:
Eutelsat Group
Related technical report:
3GPP TR 38.763
Technology domain:
5G NR and non-terrestrial networks (NTN)
Test focus:
OTA measurements for VSAT user equipment
Frequency bands discussed:
Ka band and Ku band
Key measurement parameters:
TRP, TRPL, EIRP, MU, REFSENS
Testing environment:
Quiet Zone (QZ) and Compact Antenna Test Range (CATR)
Polarization modes:
LHCP, RHCP, LP X, LP Y
Satellite orbit types considered:
GSO and NGSO
Document purpose:
Approval and discussion of testing methodologies and work plan
Year:
2025
Location:
Malta, MT
Subject:
High Power User Equipment (HPUE) specifications for NR bands n5 and n26
Document type:
Meeting summary / Technical report
Organization:
3GPP TSG-RAN4
Author:
Moderator (CMCC)
Target audience:
3GPP members, telecom engineers
Meeting number:
115
Agenda item:
6.1
Related documents:
R4-2505359, R4-2506191, R4-2506192, R4-2506193, R4-2507003, R4-2507719, R4-2507748, R4-2507766
Scope:
Rel-19 NR FR1 TDD/FDD single band, PC2 UE requirements, network signaling for Public Safety
Year:
2025
City:
Dallas
Country:
United States
Event:
3GPP TSG-RAN4 Meeting #117
Agenda item:
4.1.3
Document type:
Meeting minutes / topic summary
Organization:
3rd Generation Partnership Project (3GPP) TSG-RAN4
Source:
Moderator (Eutelsat Group)
Author / moderator:
Eutelsat Group
Technical domain:
5G NR NTN Ku-band maintenance
Topics covered:
System parameters, UE RF requirements, SAN RF requirements
Technical references:
3GPP TS 38.101-5, 3GPP TS 38.108
Frequency band:
Ku band
Agenda sections:
4.2.7.1, 4.2.7.2, 4.2.7.3
Content type:
Summary of proposals, change requests (CRs), and moderator recommendations
Participants referenced:
Ericsson, LG Electronics, MediaTek, ZTE Corporation, Huawei, Qualcomm, Thales, CATT, Keysight, SGS Wireless
Discussion status:
Combination of approved items, discussion items, and not discussed items
Year:
2025
Location:
Bengaluru, India
Event:
3GPP TSG-RAN4 Meeting #116
Agenda items:
6.1, 6.5
Document type:
Technical summary / Meeting report
Source:
Moderator (CMCC)
Participants:
CMCC, Nokia, Union Inter. Chemins de Fer, Qualcomm Technologies, China Unicom, Apple, Huawei, HiSilicon, Samsung, Ericsson, Skyworks Solutions Inc.
Topics:
HPUE in NR FR1 TDD/FDD bands, PC1.5 and PC2 introduction, Tx RF specifications, ACLR and A-MPR requirements
Proposals and observations:
Contributions and recommendations by participating companies
Period of applicability:
Release 19
Standards referenced:
TS 38.101-1, ECC decision (20)02
Year:
2026
Location:
Gothenburg, Sweden
Topic:
NR UE Over-the-Air Testing Enhancements
Document type:
Meeting report
Organization:
3GPP TSG-RAN4
Author:
Eutelsat Group
Agenda items:
7.3.1, 7.3.2, 7.3.3
Sub-topics:
TR Skeleton, TRP measurement methods, Black box vs White box, CP vs LP signals, Polarization combinations, Special conformance tests, DUT size, Polarization detection, Measurement grid annex, QZ size and positioning, QoQZ reference test points, QZ validation and calibration, MU for CP, TP for TR 38.763, Refsens measurement procedure
Approval status:
For approval
Target audience:
VSAT vendors, testing labs, 3GPP members
Source type:
Technical specification discussion and agreement report
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG-RAN4
Author:
Eutelsat Group
Document type:
Technical report draft
Agenda items:
7.3.1–7.3.20
Topics:
NR UE over-the-air testing, NTN Ka and Ku bands, TRP measurement, VSAT polarization, QZ calibration and validation
Meeting number:
118
Period of discussion:
9th–12th February 2026
Target audience:
Engineers and researchers in mobile and satellite communications
Year:
2025
Location:
Gothenburg, Sweden
Topic:
Ku Band maintenance for NR NTN
Document type:
Meeting report / Technical contributions summary
Organization:
3GPP TSG-RAN4
Authors:
MediaTek Inc., ZTE Corporation, Huawei, CATT
Target audience:
Industry stakeholders, technical engineers, standardization participants
Meeting period:
9 Nov 2025 – 13 Feb 2026
Agenda items:
System parameters, UE RF requirements, SAN RF requirements, RRM requirements
Document source:
Moderator (Eutelsat Group)
Open issues:
Addition of VSAT A-MPR, removal of redundant channel bandwidths, scheduling restrictions for NR SAN satellite switching
Referenced contributions:
R4-2600777, R4-2601748, R4-2601061, R4-2601750, R4-2600208, R4-2601062, R4-2600657, R4-2601359, R4-2601374, R4-2601537, R4-2601538
Context:
Technical meeting report detailing contributions, proposals, observations, and unresolved issues on Ku Band NR NTN maintenance, including system parameters, UE RF, SAN RF, and RRM requirements.
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG-RAN4
Document type:
Meeting report / Technical summary
Topic:
Ambient IoT (A-IoT) Maintenance and RF Requirements
Contributors:
vivo, Ericsson, Huawei, HiSilicon, CATT, ZTE Corporation, Sanechips
Agenda item:
4.1.3, 4.20.1
Target audience:
Telecommunications engineers, 3GPP members
Related standards:
TS 38.191, TS 38.192, TS 38.194, TS 38.104, TS 38.195
Document ID:
R4-2602100
Meeting number:
118
Date:
February 9–13, 2026
Year:
2026
Location:
Gothenburg Metropolitan Area, Sweden
Meeting:
3GPP TSG-RAN4 Meeting #118
Organization:
3rd Generation Partnership Project (3GPP)
Working Group:
TSG-RAN4
Specification:
3GPP TS 38.101-4
Current Specification Version:
19.1.0
Release:
Rel-19
Category:
B (addition of feature)
Work Item Code:
NR_MIMO_Ph5-Perf
Source Company:
Apple
Source to TSG:
R4
Date:
2026-01-29
Affected Clause:
6.3.3.1
Related Test Specification:
TS 38.521-4
Technical Topic:
NR MIMO performance and PMI reporting
Technology Domain:
5G NR radio access
Duplex Mode:
FDD
Antenna Configuration:
64Tx / 4Rx
Purpose of Change:
Introduction of PMI reporting requirements with 64 CSI-RS ports using eType II codebook
Summary of Change:
Addition of requirements for 64-TX eType II configuration for FDD with 4RX
Basis Document:
Endorsed draft Big CR R4-2521039
Year:
2020
Meeting type:
Electronic
Organization:
3GPP TSG-RAN4
Document type:
Meeting summary / Technical discussion
Agenda item:
7.13
Source:
Moderator (Apple)
Participants:
Apple, MediaTek, NTT DOCOMO, Intel, Qualcomm
Period:
2–13 November 2020
Topics:
Inter-band CA requirement for FR2 UE measurement capability, multiple SCell activation/deactivation, inter-frequency measurements, UE-specific BW change
Rounds of discussion:
2
Stages:
Email discussion, draft proposals, moderator summary, final decisions
Target audience:
3GPP RAN4 members and contributors
Test cases referenced:
Multiple SCell activation/deactivation, inter-frequency measurement requirement without MG, UE-specific CBW change
Year:
2023
Region / City:
Washington, DC
Topic:
Telecommunications, Law Enforcement, Technical Compliance
Document Type:
User Manual
Organization / Institution:
Federal Communications Commission
Author:
Federal Communications Commission
Target Audience:
Entities filing CALEA SSI Plans, FCC registrants
Effective Period:
Ongoing
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2017
Organization:
U.S. Department of Veterans Affairs
Office:
Loan Guaranty Service
Program:
VA Loan Electronic Reporting Interface (VALERI)
Document type:
Business Requirements Document
Project name:
VALERI-R
Audience:
Office of Information and Technology
Methodology references:
Agile terminology
Initial implementation referenced:
February 20, 2008
Systems referenced:
VALERI, Financial Management System
Subject areas:
VA-guaranteed home loans, loan servicing, default management, loss mitigation, reporting
Scope:
Servicer portal, data aggregation services, loan and case management, system integration, business intelligence
Geographic scope:
United States
Year:
2023
Region / City:
Zambia
Topic:
Electronic waste management
Document Type:
Environmental impact report
Author:
ZAMSTATS
Target Audience:
Environmental specialists, project managers, policymakers
Period of validity:
Ongoing throughout project lifecycle
Approval Date:
March 2023
Date of amendments:
Not specified
Note:
Contextual description
Year:
2018
Region / city:
United States
Topic:
Loan servicing, loan origination, business intelligence
Document type:
Request for Information (RFI)
Organization / institution:
U.S. Department of Veterans Affairs (VA)
Author:
U.S. Department of Veterans Affairs (VA)
Target audience:
Industry solution providers, mortgage servicers, software developers
Action period:
From June 30, 2019
Approval date:
Not specified
Date of changes:
Not specified
Year:
2021
Country:
United States
City:
Washington, D.C.
Agency:
U.S. Environmental Protection Agency
Office:
Office of Mission Support
Document type:
Supporting statement
Regulatory framework:
Cross-Media Electronic Reporting Rule (CROMERR)
EPA ICR number:
2002.08
OMB control number:
2025-0003
Legal authority:
Government Paperwork Elimination Act
Subject matter:
Electronic reporting requirements under environmental regulatory programs
Covered entities:
Regulated entities; state, tribal, and local governments
Publication date:
April 28, 2021
Year:
2022
Region / City:
Secunda
Type of Document:
Quotation / Tender Notice
Institution:
Govan Mbeki Municipality
Reference Number:
8/3/1-16/2022
Closing Date:
19/10/2022 at 12:00
Mandatory Meeting Date:
12/10/2022 at 10:00
Contact Persons:
Ms. DP Shabalala (Technical), Sipho Madondo (SCM)
Evaluation Criteria:
Functionality (80 points), Price and BBBEE (20 points)
Required Documents:
BBBEE Certificate, Company Registration, Tax Compliance, Municipal Account or Lease, CSD Summary, Joint Venture Agreement (if applicable), Local Content Exemption (if applicable)
End User:
Suppliers / Bidders
Legal Framework:
Municipal Finance Management Act, 2003; Preferential Procurement Policy Framework Act, 2000
Year:
Not specified
Region / City:
Oxfordshire
Subject:
Engineering Training
Document Type:
Job Description
Organization / Institution:
MTC Training
Author:
Not specified
Target Audience:
Not specified
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
Job description for an Engineering Trainer position focusing on delivering mechanical and electronic engineering training in apprenticeships and commercial programs.
Year:
2026
Region / City:
Canada
Topic:
Electronic Travel Authority (ETA) for eligible passport holders
Document Type:
Application Form
Authority/Organization:
Visa Network
Target Audience:
Travelers to Canada for tourism or business
Effective Period:
Valid for 5 years or until passport expiration
Approval Date:
Not specified
Amendment Date:
Not specified