№ lp_1_2_21339
File format: docx
Character count: 72781
File size: 278 KB
Groundwater sampling procedures for monitoring wells, remedial treatment systems, and excavations, with emphasis on equipment selection, techniques, and safety protocols.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / City:
Horn of Africa (Kenya, Somalia, Ethiopia, Sudan, Djibouti)
Topic:
Groundwater management, Climate change resilience
Document Type:
Stakeholder Engagement Plan
Agency / Institution:
Government of Kenya, Ministry of Water & Sanitation and Irrigation
Author:
Not specified
Target Audience:
Stakeholders involved in water and groundwater management
Period of Validity:
Ongoing
Approval Date:
January 2022
Date of Changes:
Not specified
Year:
2022
Region / City:
Horn of Africa
Theme:
Resettlement, Groundwater
Document Type:
Framework
Institution:
Ministry of Water and Energy, Ministry of Irrigation and Lowlands Development, Government of Ethiopia
Author:
Not specified
Target Audience:
Government officials, project implementers, stakeholders
Period of Validity:
Not specified
Approval Date:
February 2022
Amendment Date:
Not specified
Year:
2025
Region / City:
Missouri City, Fort Bend County
Topic:
Groundwater reduction, water management
Document Type:
Informational article
Organization / Institution:
Missouri City, Fort Bend Subsidence District
Author:
Not specified
Target Audience:
Residents, business owners, water users in Missouri City
Effective Period:
Ongoing, with changes starting October 2025
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2025/26
Region / City:
Knysna
Theme:
Emergency Groundwater Supply, Borehole Refurbishment
Document Type:
Tender Invitation
Organ / Institution:
Knysna Local Municipality
Author:
Lulamile Mapholoba, Municipal Manager
Target Audience:
Contractors
Duration:
3 weeks from commencement date
Approval Date:
Not specified
Modification Date:
Not specified
Context:
Tender invitation for the refurbishment of boreholes as part of the emergency groundwater supply project.
Year:
2022
Region / City:
Horn of Africa
Theme:
Groundwater Management, Climate Change Adaptation
Document Type:
Stakeholder Engagement Plan
Institution:
Government of Kenya, Ministry of Water & Sanitation, and Irrigation
Author:
N/A
Target Audience:
Stakeholders involved in water management, local authorities, and international agencies
Period of Validity:
2022 - Project duration
Approval Date:
January 2022
Date of Amendments:
N/A
Note:
Context
Year:
2025
Region / City:
Butte Valley Basin, Siskiyou County, California, USA
Subject:
Groundwater sustainability, Stakeholder engagement, Communications planning
Document Type:
Plan
Agency / Organization:
Siskiyou County Groundwater Sustainability Agency
Author:
Stantec Consulting Services Inc.; Sacramento State University Consensus and Collaboration Program
Target Audience:
Beneficial users of groundwater, community stakeholders, advisory committee members
Period of Validity:
2025–2027
Date of Approval:
April 2025
Previous Versions:
June 2020
Legislation:
Sustainable Groundwater Management Act (SGMA) of 2014
Appendices:
SGMA Educational Materials, Stakeholder Engagement Requirements, Phases of GSP Development
Tables and Figures Included:
Governance structure, Stakeholder groups, Engagement tactics
Content Overview:
Communications and engagement plan detailing stakeholder identification, consultation processes, advisory committee roles, and public involvement strategies for implementing the Groundwater Sustainability Plan in Butte Valley Basin under California SGMA regulations.
Year:
Not specified
Region / City:
St. Paul, Minnesota
Document Type:
Application Form
Organization / Agency:
Metropolitan Council Environmental Services, Industrial Waste & Pollution Prevention Section
Target Audience:
Corporations, proprietorships, government units responsible for wastewater discharge
Contact Email:
[email protected]
Contact Phone:
651-602-4703
Purpose:
Request approval for special discharge of groundwater or surface water
Required Attachments:
Site plan, analytical data, pretreatment system schematic (if applicable)
Discharge Locations:
Groundwater and/or surface water sites
Submission Address:
390 North Robert Street, St. Paul, MN 55101-1805
Date Received:
________
Request ID:
___________
Note:
Year
Subject:
Water System Review and Permitting
Document Type:
Checklist
Year:
2026
Region / City:
California
Subject:
Groundwater bacteriological sampling
Document Type:
Bacteriological Sampling Plan
Organization / Institution:
California State Water Resources Control Board
Author:
SWRCB-Division of Drinking Water
Target Audience:
Water system operators, local water agencies
Period of Validity:
2026-2036
Approval Date:
2026
Amendment Date:
N/A
Year:
2017
Region / city:
North Carolina
Subject:
Soil and groundwater contamination investigation and remediation
Document type:
Guidelines
Agency / institution:
North Carolina Department of Environmental Quality, Division of Water Resources
Author:
North Carolina Department of Environmental Quality
Target audience:
Environmental consultants, responsible parties, state agency staff
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2022
Region / city:
European Union
Topic:
Water Quality Standards, PFAS, Environmental Regulations
Document type:
Proposal
Author:
European Commission
Target audience:
European policymakers, environmental stakeholders
Effective period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Description:
Proposal to amend the Water Framework Directive, Groundwater Directive, and Environmental Quality Standards Directive to include new PFAS limits for surface and groundwater.
Year:
2019
Region / City:
Lower Yakima Valley, Washington
Topic:
Groundwater Management, Water Quality, Nitrate Contamination
Document Type:
FAQ
Organization / Institution:
Yakima County, Ecology, Department of Health, Department of Agriculture
Author:
Yakima County, Ecology
Target Audience:
General Public, Local Communities, Water Resource Management Professionals
Period of Validity:
2012–2019
Approval Date:
March 12, 2019
Date of Amendments:
N/A
Note:
Year
Topic:
Groundwater Education
Document Type:
Press Release
Organization / Institution:
The Groundwater Foundation, National Groundwater Association
Target Audience:
Local schools, students
Year:
2019
Region / city:
New Zealand
Theme:
Groundwater Models
Document Type:
Consultancy Report
Organization:
GNS Science, Aqualinc Research Limited
Author:
P Johnson, F Mourot, ZJ Rawlinson, C Tschritter, J Weir
Target Audience:
Ministry for the Environment, scientists, environmental professionals
Period of validity:
Not specified
Date of approval:
October 2019
Date of changes:
Not specified
Year:
2023
Region / City:
Wisconsin
Theme:
Construction, HMA Pavement, Testing Procedures
Document Type:
Test Method
Organization / Institution:
Wisconsin Department of Transportation (WisDOT)
Author:
Wisconsin Department of Transportation (WisDOT)
Target Audience:
Contractors, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual Description:
Detailed test methods and sampling procedures for HMA PWL QMP projects to ensure quality control during the paving process.
Year:
2025–26
Region / City:
United States
Topic:
Verification, School Meals, Educational Benefits
Document Type:
Regulatory Requirement
Organization:
USDA
Target Audience:
School Food Authorities
Period of Validity:
2025–26
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
A regulatory document detailing the verification reporting requirements for the National School Lunch Program for the 2025–26 school year, outlining the SFAs required to use the "Three Percent Error-Prone" sampling method for application verification.
Year:
2004
Region / City:
International
Topic:
Process Validation, Medical Device Manufacturing
Document Type:
Guideline
Organization / Institution:
Philips
Author:
Philips Quality Engineering
Target Audience:
External suppliers, manufacturers of medical devices
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
Global
Topic:
Energy / Transformer Maintenance
Document Type:
Course Syllabus
Institution:
EON Reality Inc
Author:
EON Reality Inc
Target Audience:
Energy Technicians, Maintenance Professionals, Transformer Maintenance Specialists
Certification:
EON Integrity Suite™ Certification
Standards:
IEEE, ASTM, IEC
Duration:
Not specified
Date of Approval:
10/31/2025
Last Updated:
Not specified
Year:
Not specified
Organization:
Department of Environmental Protection (DEP)
Document Type:
Standard Operating Procedure (SOP)
Scope:
Field sampling, sample handling, field-testing, and documentation
Applicable Collections:
DEP-SOP-001, DEP-SOP-003/11
Quality Assurance:
DEP Quality Assurance Rule 62-160.650 & 62-160.670, F.A.C.
Record Retention:
Minimum 5 years after record generation or completion
Media:
Paper and electronic records
Signatures:
Required for all internal SOPs, quality assurance officers and managers
Audit Requirements:
Electronic audit trails recommended
Corrections:
Marked and initialed for paper records
Archival Requirements:
Retain copies of all revisions, master electronic copies may replace originals