№ files_lp_4_process_3_112288
File format: docx
Character count: 8605
File size: 36 KB
Year:
2007
Region / City:
Portland, OR
Topic:
HVAC System Assessment
Document Type:
Report
Organization:
MFIA Consulting Engineers, Inc.
Author:
Takako Baker, P.E.
Target Audience:
Building Management, Facility Engineers, HVAC Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Modifications:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / City:
East Sussex
Theme:
School governance
Document Type:
Job Description
Institution:
East Sussex County Council
Author:
JM
Target Audience:
Potential candidates for the Clerk to the Governors position
Effective Period:
Ongoing
Approval Date:
December 2022
Date of Last Amendment:
December 2022
Year:
2024
Location:
Lowell, Massachusetts, USA
Type of Document:
Request for Services (RFS)
Department:
City of Lowell Purchasing Department
Contact:
P. Michael Vaughn
Project:
Schools HVAC and Controls Project
Submission Deadline:
July 24, 2024
Requirements:
Massachusetts Certified Public Purchasing Officer, experience in public construction
Evaluation Criteria:
Past performance, knowledge of building codes, project management approach, key personnel, capacity and skills
Audience:
Potential Owner’s Project Manager contractors
Document Type:
Official municipal procurement notice
Official References:
Massachusetts General Laws Chapter 149, Section 44A½
Note:
Year
Year:
2024
Region / City:
[Facility Location]
Theme:
HVAC system operation and maintenance
Document Type:
Operations & Maintenance Manual
Organization / Institution:
[Facility Name]
Author:
[Facility Manager Name]
Target Audience:
Facility engineers, technicians, and operators
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2016
Region / City:
Global
Topic:
Laminar Flow Diffusers
Document Type:
Product Specification
Organization:
Price Industries, Inc.
Author:
Price Industries, Inc.
Target Audience:
HVAC professionals, engineers, and designers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2015
Region / City:
Minneapolis, Minnesota
Industry:
HVAC, Ventilation
Document Type:
Technical Specification
Organization:
Twin City Fan & Blower
Author:
Twin City Fan & Blower
Target Audience:
Engineers, Architects, HVAC professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Product Type:
Hooded Modular Gravity Ventilators
Performance:
Up to 109,000 CFM, Static Pressure up to 0.4 inches wg
Warranty Period:
12 months from startup or 18 months from shipment
ISO Certification:
ISO 9001
Application:
Commercial, Industrial
Material:
Galvanized steel, Aluminum
Maximum Dimensions:
72 x 180 inches (198 x 198 mm to 1,829 x 4,572 mm)
Maximum Airflow:
109,000 CFM (185,191 m³/hr)
Static Pressure:
0.4 inches wg (99 Pa)
Manufacturer:
Twin City Fan & Blower, Minneapolis MN
Contact:
(763) 551-7600, [email protected]
Website:
www.tcf.com
Year:
2023
Region / City:
North America
Topic:
HVAC system components
Document Type:
Technical specification
Organization / Institution:
Daikin North America LLC
Author:
Daikin North America LLC
Target Audience:
Contractors, HVAC engineers, system designers
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Region / City:
N/A
Subject:
HVAC Equipment
Document Type:
Specification Section
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Contractors, Engineers
Period of Validity:
N/A
Approval Date:
6/2019
Date of Amendments:
N/A
Year:
2019
Region / City:
Not specified
Topic:
Insulation of HVAC equipment
Document Type:
Specification Section
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, engineers, and other professionals in HVAC systems
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
6/2019
Year:
2023
Region / City:
North America
Theme:
HVAC, Air Conditioning
Document Type:
Technical Specifications
Organization:
Daikin North America LLC
Author:
Daikin North America LLC
Target Audience:
Engineers, Contractors, HVAC Professionals
Warranty Period:
10 years
Performance Data:
Cooling: 7,200 - 60,000 Btu/h, Heating: 8,500 - 60,000 Btu/h
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2023
Note:
Region / City
Topic:
HVAC Systems, Energy Efficiency, Fault Detection
Document Type:
Guideline
Agency / Organization:
ASHRAE
Target Audience:
HVAC designers, control contractors, commissioning agents, building owners, operators, and maintenance technicians
Context Description:
Detailed guidelines on standardized HVAC sequences for energy efficiency and performance, including fault detection and control stability, intended for professionals in HVAC design and operation.
Note:
Year
Theme:
HVAC
Document Type:
Specification
Organization / Institution:
Daikin North America LLC
Target Audience:
Contractors, HVAC professionals
Year:
2016
Region / City:
Fremont, CA
Topic:
HVAC Renovation
Document Type:
Task Order Proposal Request (TOPR)
Agency:
Department of Veterans Affairs
Author:
Network Contracting Office 21
Target Audience:
Contractors with MATOC contracts
Period of Validity:
From September 1, 2016
Approval Date:
September 1, 2016
Date of Changes:
None
Context:
A request for proposals for HVAC renovation at the VA Fremont Clinic, detailing a site visit and proposal conference for contractors holding MATOC contracts.
Year:
N/A
Region / City:
N/A
Topic:
HVAC Systems
Document Type:
Product Specification
Organization / Institution:
Daikin North America LLC
Author:
N/A
Target Audience:
Contractors, Engineers, Designers
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2026
Region / City:
North America
Topic:
HVAC Systems
Document Type:
Technical Specifications
Organization / Institution:
Daikin North America LLC
Author:
Daikin North America LLC
Target Audience:
HVAC engineers, contractors, and industry professionals
Period of validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2025
Location:
Spalding, Lincs, PE11 2XL
Topic:
Heritage Impact Assessment, Listed Building Consent
Document Type:
Report
Institution:
South Holland District Council
Author:
Jonathan Biggadike
Target Audience:
Local Planning Authority, Heritage Consultants
Period of Validity:
Not specified
Approval Date:
18th March 2025
Amendment Date:
Not specified
Year:
2025
Region / City:
Knoxville, TN
Subject:
Proposed Amendment
Document Type:
HOA Amendment Proposal
Organization:
The Cove at Blackberry Ridge HOA
Author:
Matt Wiberg – President, HOA Board
Target Audience:
Homeowners of The Cove at Blackberry Ridge
Period of Action:
June 12, 2025 (Voting Date)
Approval Date:
May 12, 2025
Change Date:
N/A
Year:
2024-2025
Region / City:
Diocese of Chichester
Topic:
Grants for church building repairs and improvements, Net Zero Carbon (NZC) initiatives
Document Type:
Grant application guidelines
Organization / Institution:
Diocese of Chichester
Author:
Church Buildings and NZC Teams, Diocese of Chichester
Target Audience:
Parishes within the Diocese of Chichester
Period of Action:
2024-2025
Approval Date:
Not specified
Date of Changes:
Not specified