№ lp_1_2_24037
File format: docx
Character count: 8045
File size: 38 KB
This document outlines the specifications and requirements for constructing a concrete bridge slab using transparent permanent forms, detailing materials, fabrication, and installation procedures for the system.
Year:
2025
Region / City:
Not specified
Topic:
Construction Specifications
Document Type:
Technical Specification
Agency / Organization:
Not specified
Author:
Not specified
Target Audience:
Engineers, Contractors
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2018
Region / City:
Dublin
Topic:
Research recruitment practices
Document Type:
Guideline
Institution:
Dublin City University
Author:
Not specified
Target Audience:
Researchers, HR professionals
Period of validity:
Ongoing
Approval Date:
Not specified
Date of last modification:
Not specified
Year:
2020
Region / City:
United Kingdom
Theme:
Public Health, COVID-19, Government Response
Document Type:
Research Paper, Public Health Report
Organization / Institution:
University of Southampton, University of Edinburgh, UCL, University College London, Liverpool School of Tropical Medicine, University of Bristol, London School of Hygiene & Tropical Medicine, University of Leeds, University of Oxford, University of East Anglia, University of Bern, University of Exeter, Newcastle University
Author:
Nisreen A Alwan, Raj Bhopal, Rochelle A Burgess, Tim Colbourn, Luis E Cuevas, George Davey Smith, Matthias Egger, Sandra Eldridge, Valentina Gallo, Mark S Gilthorpe, Trish Greenhalgh, Christopher Griffiths, Paul R Hunter, Shabbar Jaffar, Ruth Jepson, Nicola Low, Adrian Martineau, David McCoy, Miriam Orcutt, Bharat Pankhania, Hynek Pikhart, Allyson Pollock, Gabriel Scally, James Smith, Devi Sridhar, Stephanie Taylor, Peter W G Tennant, Yrene Themistocleous, Anne Wilson
Target Audience:
Scientific and Health Communities, General Public
Period of Validity:
March 2020
Approval Date:
March 14, 2020
Modification Date:
March 15, 2020
Note:
Year
Topic:
Health-related research, Life sciences, Animal research
Document Type:
Reporting guidelines
Organization:
eLife Sciences Publications
Target Audience:
Researchers, Authors
Year:
2016-17
Note:
Year
2017-18
Document Link:
View Document
Context:
A document discussing the transparency and robustness of the internal assessment mechanism, specifically in terms of frequency and mode, across multiple years.
Year:
2026
Country:
Nigeria
Sector:
Higher Education
Topic:
Student Loan Allocation and AI Governance
Document Type:
Research Article
Institution:
Nigerian Public Universities
Author:
Not specified
Research Methodology:
Quantitative, Simulation Study
Key Concepts:
AI, Data Governance, Transparency, Fairness, Public Finance
Target Audience:
Policymakers, Academic Researchers
Period Covered:
Recent policy initiatives in Nigeria
Keywords:
Fair Student, Transparent Artificial Intelligence, AI-Driven Data, Governance
Abstract:
Quantitative study on AI-driven data governance improving transparency, fairness, and trust in Nigerian public student loan distribution.
Year:
2021
Region / City:
N/A
Subject:
Photothermal Energy Generation, Solar Harvesting
Document Type:
Journal Article
Organization / Institution:
Adv. Sustainable Systems
Author:
Donglu Shi, Mengyao Lyu, Jou Lin, John Krupczak
Target Audience:
Researchers, Engineers, Academics in the fields of Energy and Materials Science
Period of Validity:
N/A
Date of Approval:
2021
Date of Modifications:
N/A
Year:
2024
Region / City:
Jackson, MI
Theme:
Concrete footing and slab removal, park restoration
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jackson County Parks Department
Target Audience:
Contractors experienced in concrete removal and restoration projects
Period of Validity:
Until project completion (by 5/3/24)
Approval Date:
3/27/24
Amendment Date:
N/A
Year:
2023
Region / City:
Scotland
Topic:
Legal Aid / Solicitor Contact Line
Document Type:
Policy Statement
Organ / Institution:
Solicitor Contact Line
Author:
SCL Manager
Target Audience:
Solicitors working within the Solicitor Contact Line
Effective Period:
From November 2023
Approval Date:
November 2023
Review Date:
November 2028
Last Reviewed:
N/A
Change Log:
V1.0 - November 2023, V1.2 - November 30, 2023, V1.3 - January 5, 2024, V1.4 - January 22, 2024
Note:
Year
Theme:
Construction Products Regulations
Document Type:
Technical Specification
Organization / Institution:
Albion Stone plc
Target Audience:
Professionals in construction and materials
Year:
2020
Region / city:
Johannesburg, Vereeniging
Topic:
Construction, Engineering
Document Type:
Tender Specifications
Organization:
Rand Water
Author:
Kaveer Sukkhu, Maurice Chibu
Target Audience:
Contractors, Engineers
Validity Period:
Not specified
Approval Date:
06-04-2020
Revision Date:
06-04-2020
Document code:
H92
Section title:
Natural stone slab cladding / lining / features
Construction element:
Cladding to external facades – rainscreen
Material standard:
Stone slabs to BS EN 1469
Stone type:
Jurassic Limestone, Portland Roach from Bowers Mine
Denomination standard:
Portland Bowers Roach to BS EN 12440
Origin of stone:
Portland, Dorset, UK
Colour:
Off white / creamy buff
Finish:
Surface finish according to indicative sample reference; geological range shown by range panels at Albion Stone mine
Supplier:
Albion Stone plc
Supplier address:
Easton Street, Portland Dorset DT5 1BW, United Kingdom
Contact phone:
01737 771772
Fire classification:
Reaction to fire Class A1
Testing standards referenced:
BS EN 13161, BS EN 13364, BS EN 12371, BS EN 12524, BS EN 14066, BS EN 1936
Design and calculation reference:
BS 8298:2020 Part 4 Sections 5.4–5.6, Table 4, Annex B, Annex E, Annex F
Construction regulations compliance:
Construction Products Regulations with CE Certificate and Declaration of Performance
Quality control:
Factory Production Control system in accordance with BS EN 1469 tolerances
Quality management certification:
ISO 9001
Environmental management certification:
ISO 14001
Responsible sourcing certification:
BES 6001 (Excellent)
Environmental documentation:
Environmental Product Declaration (EPD) cradle-to-gate for extraction and manufacture
Intended application:
Rainscreen cladding systems for external building facades
Issuing organisation:
Albion Stone plc
Year:
2021
Location:
2 Myuna St, Regency Park, Australia
Project:
Sarah Solutions Centre
Activity:
Concrete Slab
Subcontractor:
Sarah
Prepared by:
Nathan Bowden, Construction Graduate
Approved by:
Rachel Kitto, Site Supervisor
Standards Referenced:
AS 1379:2007, AS 3600:2018, AS 4671:2019
Verification Types:
Hold Point, Inspection, Review, Surveillance, Witness
Verification Frequency:
As specified per activity
Documentation:
ITP submission, mix design, sample reports, material certificates, pre-pour and daily inspection checklists, photos, QA documentation
Handover Requirements:
Warranties, certification, 7 and 28 day test reports, reinforcement dockets complying with ACRS certification
Construction Phase:
Preparation, placement, surface treatment, and handover of concrete slab
Intended Audience:
Project engineers, site supervisors, QA personnel
Year:
2020
Region / City:
Nurek, Tajikistan
Theme:
Environmental and Social Management, Hydropower
Document Type:
Final Report
Organization / Institution:
Barqi Tojik, Nurek Hydropower Company
Author:
N/A
Target Audience:
Government officials, environmental and social management specialists, stakeholders in the rehabilitation project
Period of Validity:
N/A
Approval Date:
May 2020
Date of Amendments:
N/A
Year:
2025
Region / City:
Not specified
Topic:
Research funding, academic faculty support
Document Type:
Guidelines
Organization / Institution:
School of Medicine (PSOM)
Author:
Not specified
Target Audience:
Faculty at the School of Medicine
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Contextual Description:
Guidelines for bridge funding to support research continuity and key personnel retention for extramurally funded research projects within the School of Medicine.
Year:
2022
Region / City:
Not specified
Topic:
Bridge construction, Polymer Concrete overlay
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Region / City:
Not specified
Subject:
Bridge inspection procedures and account management
Document Type:
User Manual
Institution:
Not specified
Author:
Not specified
Target Audience:
Inspectors, Program Managers, and Team Leaders in bridge inspection
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / city:
Mindanao, Philippines
Topic:
Communications, Peacebuilding
Document Type:
Terms of Reference
Organization:
CARE Philippines, ACCORD, COM, Oxfam Pilipinas
Author:
CARE Philippines
Target Audience:
Communications professionals, project partners
Period of Action:
05 January – 05 April 2026
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / City:
Indiana
Topic:
Local Road and Bridge Projects, Grant Funding, Infrastructure
Document Type:
Guidance Document
Organization / Institution:
Indiana Department of Transportation (INDOT)
Author:
Indiana Department of Transportation (INDOT)
Target Audience:
Local Government Units (cities, towns, counties) in Indiana
Period of Validity:
Ongoing, with biannual project calls (January and July)
Approval Date:
2016
Date of Changes:
No specific changes noted