№ lp_1_2_53593
File format: docx
Character count: 17058
File size: 97 KB
This document is an official application form used for requesting consent to discharge trade effluent into the wholesaler’s sewerage system or for modifying an existing consent, specifically in the context of the water industry.
Year:
2018
Region / city:
United Kingdom
Theme:
Water industry
Document type:
Application form
Organ / institution:
Not specified
Author:
Not specified
Target audience:
Retailers, Non-Household Customers, Wholesalers
Period of validity:
Not specified
Date of approval:
30th March 2018
Date of amendments:
28th September 2018
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2018
Region / city:
UK
Subject:
Trade Effluent Discharge Application
Document type:
Application Form
Organization / Institution:
Water Industry
Note:
Author
Target Audience:
Retailers, Non-Household Customers
Year:
2018
Region / city:
UK
Subject:
Trade Effluent Discharge Application
Document type:
Application Form
Organization / Institution:
Water Industry
Note:
Author
Target Audience:
Retailers, Non-Household Customers
Year:
2019
Region / City:
Placer County, California
Subject:
Environmental Engineering, Wastewater Management
Document Type:
Technical Specification
Organization / Institution:
Placer County Department of Public Works, Environmental Engineering Division
Author:
Placer County Environmental Engineering Division
Target Audience:
Contractors, Property Owners, Environmental Engineering Staff
Validity Period:
Not specified
Approval Date:
November 2019
Date of Modifications:
Not specified
Year:
2023
Region / City:
Minnesota
Topic:
Effluent Toxicity Testing
Document Type:
Report
Organization / Institution:
Minnesota Pollution Control Agency (MPCA)
Author:
Minnesota Pollution Control Agency (MPCA)
Target Audience:
Environmental regulators, facility operators, testing laboratories
Period of Effectiveness:
Ongoing (based on NPDES permit)
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Year
Topic:
Wastewater systems, effluent regulations
Document Type:
Dataset
Organization/Institution:
Environment and Climate Change Canada (ECCC)
Qualification Title:
Occupational Certificate: Sugar Processing Controller
SAQA QUAL ID:
97590
Module Code:
313908000-KM-09
Module Title:
Water and effluent treatment
NQF Level:
4
Credits:
4
Document Version:
1.0
Publisher:
Not specified
Document Type:
Learner Workbook
Programme Type:
Outcomes-based learning programme
Knowledge Module Credits (Total):
92
Practical Skill Module Credits (Total):
58
Work Experience Module Credits (Total):
76
Assessment Type:
Formative and Summative
Related Qualification Modules:
Knowledge, Practical Skill and Work Experience Modules for Sugar Processing Controller
Year:
2019
Region / City:
Wyoming Valley, PA
Topic:
Mercury discharge regulations
Document type:
Compliance report
Institution:
Wyoming Valley Sanitary Authority
Author:
Wyoming Valley Sanitary Authority
Target audience:
Dental facility operators
Period of validity:
Indefinite, until ownership transfer
Date of approval:
N/A
Date of modifications:
N/A
Year:
2023
Region / City:
Flintshire, Wales
Subject:
Waste Management, Agricultural Land Treatment
Document Type:
Permit Application
Organization:
Natural Resources Wales
Author:
Agrispread Ltd
Target Audience:
Environmental Agencies, Waste Management Authorities, Agricultural Operators
Effective Period:
Ongoing
Approval Date:
N/A
Date of Changes:
17/01/2022
Year:
2026
Region / City:
Iwuru Obio Ntan community, Biase Local Government Area, Cross River State, Nigeria
Topic:
Environmental Impact of Cassava Mill Effluent on Soil and Plants
Document Type:
Research Article
Institution:
University of Calabar, Nigeria
Author:
Not specified
Target Audience:
Researchers, environmental scientists, agricultural scientists
Period of Action:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Project:
Duvha Power Station Effluent System Upgrade
Duration:
22 months
Document Type:
Safety Objective Requirements
Subject:
Occupational Health and Safety Compliance
Applicable Legislation:
OHS Act Section 7; ISO 45001 Clause 5.2
Required Submissions:
Annexure B acknowledgement form; Health and Safety Plan; Baseline OHS Risk Assessment; Valid letter of good standing; OHS policy; OHS competency documentation; Safety Officer qualifications; SHE costing breakdown
Risk Management Requirement:
Identification, assessment, and management of OHS risks aligned with project scope
Minimum Safety Officer Qualification:
Grade 12/N3, SAMTRAC, 2 years’ experience in coal-fired stations
Compiled By:
Ephraim Ngoato
Designation:
Assistant Safety Officer
Compilation Date:
03 June 2025
Year:
2019
Organization:
NVC Sewer Department
Report Date:
July 19, 2019
Monitoring Period:
May 2019
Author:
Utility Superintendent
Recipients:
Utility Committee members, DEP
Location:
NVC
Parameters Measured:
Flow, TSS, BOD5, pH, Settleable Solids, Total Residual Chlorine, Fecal Coliform
Compliance Status:
Full compliance for May and June 2019
Testing Methods:
IDEXX Colilert-18, Filter Membrane Test
Supporting Labs:
NEL, BSD
Precipitation Recorded:
3.32 inches in May 2019, 5.46 inches in June 2019
Average Flow:
11,181 gpd in May 2019, 14,830 gpd in June 2019
Historical Data Comparisons:
Flow, TSS, BOD5, Fecal Coliform exceedances history
EPA Consent Order Deadlines:
June 30, 2019; August 31, 2019; October 31, 2019; September 30, 2020; December 31, 2020
Engineering Services:
Preliminary design by Dirigo Engineering for disinfection and dechlorination
Funding Considerations:
USDA Rural Development and DEP Clean Water funding options
Year:
2018
Region / City:
Rankin Inlet, Nunavut
Subject:
Environmental Impact, Mining
Document Type:
Proposal
Organization / Institution:
Agnico Eagle Mines Limited
Author:
Mr. Jamie Quesnel
Target Audience:
Environmental authorities, mining regulatory bodies, local government
Period of Effectiveness:
2018-05-01 to 2032-12-31
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2013
Region / City:
Skookumchuck, British Columbia
Document Type:
Environmental Permit
Issuing Authority:
Ministry of Environment, Southern Interior Region - Kootenay
Permit Number:
188
Permittee:
Tembec Enterprises Inc. and Tembec Industries Inc. DBA Tembec
Authorized Activity:
Discharge of effluent to surface water from a domestic sewage treatment plant
Maximum Discharge Rate:
136.5 cubic metres per day
Discharge Location:
Lots 6021 and 6022, Kootenay Land District
Discharge Point:
Skookumchuck Creek
Sampling Requirements:
Weekly flow, quarterly total suspended solids and BOD5
Reporting Requirements:
Quarterly electronic data submission, annual report by March 31
Legal Framework:
Environmental Management Act, Section 120(3)
Appeal Information:
Environmental Appeal Board, appeal within 30 days of notice
Enforcement:
Compliance with permit conditions mandatory, violations subject to prosecution
Supporting Documents:
Site Plan A, British Columbia Field Sampling Manual
Year:
2020
Location:
Washington, D.C., USA
Topic:
NPDES Permit Limits and Regulatory Compliance
Document Type:
Webinar Agenda / Training Material
Organization:
Hall & Associates; Johnson Controls
Authors:
Gary B. Cohen, Bill Hall, Amanda Sheposh P.E.
Audience:
Operators in Illinois, Wisconsin, Minnesota; Professional Engineers; Students; International Participants
Duration:
1:00 PM to 2:00 PM
Continuing Education Credits:
1.0 CEUs, 1.2 PDHs
Cost:
$15 – Members, $20 – Non-Members, $5 – Students, $5 – International
Registration Required:
Yes
Year:
22 months
Region / City:
Duvha Power Station
Topic:
Occupational Health and Safety Training
Document Type:
Training Schedule
Organization / Institution:
Duvha Power Station
Author:
Not specified
Target Audience:
Employees at Duvha Power Station
Period of Validity:
22 months
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
Not specified
Region / City:
Neath Port Talbot, Powys
Topic:
Planning and Environmental Compliance
Document Type:
Application for condition discharge
Organization / Institution:
RPS Consulting Services Limited
Author:
Damian Barry
Target Audience:
Neath Port Talbot County Borough Council
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Contextual Description:
Application for the discharge of several planning conditions regarding the development of Phase 1a of the Nant Helen Surface Mine site and Onllwyn Distribution Centre, including environmental, construction, and biodiversity management plans.
Year:
2023
Region / City:
Canberra
Theme:
Healthcare Procedures
Document Type:
Procedure
Organization:
Canberra Health Services
Author:
Not specified
Target Audience:
NCH and CHH staff
Period of Action:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Note:
Year
Topic:
Mental Health Treatment, Discharge Procedure
Document Type:
Discharge Form
Agency / Institution:
Department of Children and Families
Target Audience:
Healthcare professionals, case managers, social workers
Year:
2023
Region / City:
Singapore
Topic:
Medical Services at World Aquatics Championship
Document Type:
Agreement
Organization / Institution:
Singapore Medical Council, World Aquatics National Federation
Author:
[Insert name of authorized representative]
Target Audience:
Medical staff and Federation members
Period of Validity:
[Insert period]
Date of Approval:
[Insert approval date]
Date of Changes:
[Insert change date]