№ lp_1_2_42491
Long-term strategy for neutralisation and storage of bauxite residue using sea water to ensure environmental compliance and extend the life of the residue disposal facility.
Year: 2018
Region / City: Gladstone, Queensland, Australia
Theme: Bauxite Residue Management, Environmental Technology
Document Type: Technical Report
Organization: Queensland Alumina Limited, Rusal Australia
Author: Benoit CRISTOL, Ross GREENHALGH
Target Audience: Environmental engineers, industry professionals
Period of Validity: Until 2080
Approval Date: 2007
Modification Date: Not specified
Technology: Sea water neutralisation for bauxite residue disposal
Environmental Impact: Improved water quality release, reduced leachate treatment post-closure
Process Description: Thickening, mud farming, and wall construction
Storage Capacity: Up to 2082
Water Quality: pH between 8.5 and 9.0, dissolved oxygen 5mg/L, suspended solids <10mg/L
Residue Management Strategy: Thickening, high-density mud consolidation, upstream wall construction
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.