№ lp_2_1_16538
File format: docx
Character count: 114419
File size: 394 KB
Technical standard defining requirements, principles and processes for space communication system engineering within the ECSS framework, including telecommand, telemetry, space link and associated documentation requirements.
Title:
ECSS-E-ST-50C Rev.1 Space Engineering – Communications
Revision:
1
Date of revision:
11 March 2021
Previous issue:
ECSS-E-ST-50C (31 July 2008)
Original publication date:
31 July 2008
Supersedes:
ECSS-E-50 Part 1A (20 October 2003) and ECSS-E-50 Part 2A (4 July 2005)
Document type:
Standard
Series:
ECSS Standards
Domain:
Space engineering – Communications
Prepared by:
ECSS-E-ST-50C Revision Working Group
Reviewed by:
ECSS Executive Secretariat
Approved by:
ECSS Technical Authority
Publishing organization:
European Space Agency
Publishing division:
ESA Requirements and Standards Section, ESTEC
Publisher location:
Noordwijk, The Netherlands
Copyright:
© 202108 by the European Space Agency for the members of ECSS
Scope:
Requirements for space communication system engineering, including telecommand, telemetry, space link and related documentation requirements
Related handbook:
ECSS-E-HB-50A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Standard code:
ECSS-E-ST-10-03C Rev.1
Type of document:
Technical standard
Field:
Space engineering
Subject:
Testing requirements for space systems and equipment
Organization:
European Cooperation for Space Standardization
Publisher:
European Space Agency, Requirements and Standards Section
Location:
Noordwijk, The Netherlands
Year:
2022
Initial publication:
15 February 2002
Revision date:
31 May 2022
Edition:
Second issue, Revision 1
Prepared by:
ECSS-E-ST-10-03 TA Task Force
Approved by:
ECSS Technical Authority
Applicability:
Space projects and applications
Language:
English
Copyright holder:
European Space Agency
Change history period:
2002–2022
Organization:
3GPP TSG-CT WG1
Meeting:
#133-bis-e
Document number:
Rev_C1-220272E-meeting
Specification:
3GPP TS 27.007
CR number:
0759
Revision:
1
Current version:
17.4.0
Release:
Rel-17
Category:
B (addition of feature)
Work item code:
MUSIM
Source to WG:
Apple
Source to TSG:
C1
Date:
2022/01/08
Affected clauses:
10.1.X (New Clause), Annex B
Affected areas:
ME, Core Network, Test specifications, O&M Specifications
Implementation status:
Optional
Change Request 0783 Rev.1 to 3GPP TS 36.304 Rel-16: Introduction of NB-IoT Enhancements (April 2020)
Document number:
CR 0783 Rev.1
Specification:
3GPP TS 36.304
Current version:
16.0.0
Release:
Rel-16
Meeting:
3GPP TSG-RAN WG2 Meeting #109bis-e
Meeting date:
April 20–30, 2020
Work item code:
NB-IoTenh3-Core
Category:
B (addition of feature)
Source to WG:
Nokia
Source to TSG:
R2
Affected clauses:
2, 7.1, 7.5.1, 7.5.2, 7.5.3, 7.5.4 (new), 7.5.5 (new)
Affected specifications:
TS 36.331 CR 4192, TS 36.300 CR 1259
Subject:
Rel-16 NB-IoT enhancements including GWUS and UE specific DRX
Reason for change:
Capture RAN2 agreements related to GWUS and UE specific DRX functionalities
Consequences if not approved:
Rel-16 NB-IoT enhancements for GWUS not supported
References:
Normative references to 3GPP and related technical specifications
Document number:
CR 0233 Rev.1
Specification:
3GPP TS 32.291
Release:
Rel-16
Current version:
16.3.0
Meeting:
3GPP TSG-SA5 Meeting #131e
Meeting date:
25 May–3 June 2020
Approval date:
2020-05-28
Work item code:
TEI16, 5GS_Ph1_NEFCH
Category:
F (correction)
Source to WG:
Huawei
Source to TSG:
S5
Affected clauses:
6.1.6.2.5.1; 6.1.6.2.5.1a (New); 6.1.6.2.5.2
Affected domain:
Core Network
Related specification:
3GPP TS 32.254
Subject:
NEF API charging message formats
Organization:
3rd Generation Partnership Project
Working Group:
3GPP TSG-RAN WG4
Meeting:
TSG-RAN WG4 Meeting #98-e
Document Number:
R4-2103883
Specification:
3GPP TS 37.104
Current Version:
15.12.0
Change Request:
CR 0934 Rev.1
Release:
Rel-15
Category:
F (correction)
Work Item Code:
TEI15
Source to WG:
Ericsson
Source to TSG:
R4
Date:
2021-02-04
Affected Clauses:
3.3; 6.6.2.1; 6.6.2.2
Related Specification:
3GPP TS 37.141
Subject:
OBUE table headings and applicability alignment
Technical Domain:
Radio Access Network
Abbreviations Included:
OBUE; UEM; BS; NR; NB-IoT; GSM; EDGE; RAT; BC; RF
Organisation:
3rd Generation Partnership Project (3GPP)
Technical Specification:
3GPP TS 28.552
Working Group:
TSG-SA5
Meeting:
3GPP TSG-SA5 Meeting #131e
CR Number:
0235
Revision:
1
Current Version:
16.5.0
Release:
Rel-16
Category:
B (addition of feature)
Title:
Addition of QoS flow measurements for UPF
Source to WG:
China Mobile, ZTE
Source to TSG:
S5
Work Item Code:
5G_SLICE_ePA
Date:
2020-05-15
Affected Clauses:
5.4.a (new)
Affected Domain:
Core Network
Measurement Names:
UPF.MeanQosFlows; UPF.MaxQosFlows
System:
5GS
Validity:
Packet switching
Year:
2015
Country:
United States
State:
California
Region / location:
Imperial County, California; Boulder City, Nevada
Subject:
Renewable energy procurement and solar power generation
Document type:
Regulatory resolution
Institution:
California Public Utilities Commission
Division:
Energy Division
Resolution number:
E-4704 (Rev.1)
Agenda ID:
13699
Date adopted:
March 12, 2015
Companies involved:
Southern California Edison Company; Silver Ridge Power; 8minutenergy Renewables, LLC; Copper Mountain Solar 4, LLC; Sempra U.S. Gas & Power
Program:
Renewables Portfolio Standard (RPS)
Projects referenced:
Mount Signal Solar Farm II; Mount Signal Solar Farm V; Copper Mountain Solar Project
Energy technology:
Solar tracking photovoltaic (PV)
Contract duration:
20 years
Generating capacity:
154 MW; 252 MW; 94 MW
Estimated operation dates:
February 1, 2019; June 1, 2020; January 1, 2020
Regulatory references:
Public Utilities Code Sections 399.11–399.31; Senate Bill 1078; Senate Bill 107; Senate Bill 1036; Senate Bill 2 (1X)
Confidentiality status:
Partially redacted cost information
Year:
2026
Document type:
Change Request
Specification:
3GPP TS 23.379
Release:
Rel-19
CR number:
0517
Revision:
1
Meeting:
3GPP TSG-SA WG6 Meeting #71
Meeting location:
Goa, India
Meeting date:
9–13 February 2026
Work item code:
FRMCS_Ph5
Category:
F (correction)
Current specification version:
19.9.0
Source organizations:
UIC; Nokia; Kontron Transportation France; AT&T
Submitting group:
SA6
Date:
2026-01-28
Affected clause:
10.19.3.1.1
Technology domain:
MCPTT (Mission Critical Push-To-Talk)
Network impact:
Core Network; Mobile Equipment
Subject:
Ad hoc group call setup procedure corrections and clarification
Change summary:
Reordering of functional alias verification and initiator authorization checks, removal of redundant authorization checks, correction of message naming and terminology, and clarification of procedural steps
Consequence if not approved:
Incorrect normative text may misguide stage 3 development
Year:
2021
Date:
2021-02-02
Organization:
3rd Generation Partnership Project
Technical Group:
TSG RAN WG4
Meeting:
RAN WG4 Meeting #98-e
Document Type:
Change Request
Specification:
3GPP TS 38.101-4
Current Specification Version:
16.3.0
Release:
Rel-16
CR Number:
0131
Revision:
1
Category:
B (addition of feature)
Source to WG:
CMCC
Source to TSG:
R4
Work Item Code:
NR_UE_pow_sav-Perf
Affected Clauses:
5.3.2.2.3 (New); 5.3.3.2.3 (New)
Affected Specifications:
TS38.521-4
Technical Domain:
Radio Access Network
Subject:
Demodulation performance requirements for power saving UE in FR1 TDD using PDCCH DCI format 2_6
Test Scope:
FR1 TDD PDCCH monitoring and demodulation performance during DRX operation
Year:
2013
Region / City:
United States
Topic:
Lease Proposal Evaluation
Document Type:
Administrative Statement
Agency / Organization:
General Services Administration (GSA)
Author:
General Services Administration
Target Audience:
Federal Agencies, Lessors
Period of Validity:
Ongoing
Approval Date:
January 3, 2013
Amendment Date:
N/A
Note:
Year
Subject:
Space-saving furniture solutions
Document Type:
Blog
Organization / Institution:
Cubix
Target Audience:
Commercial and residential property owners, interior designers
Contextual description:
Blog post describing the benefits of bunk beds and loft beds in saving space in commercial and residential environments, with a focus on their design, safety standards, and functionality for various settings.
Year:
2025
Region / City:
Bloemfontein
Subject:
Procurement
Document Type:
Request for Bid (RFB)
Organization / Institution:
SITA
Author:
N/A
Target Audience:
Potential Bidders
Validity Period:
200 Days from the Closing Date
Approval Date:
N/A
Amendment Date:
N/A
Year:
2020
Region / City:
European Space Agency
Topic:
Space Technology, Business Incubation
Document Type:
Guideline
Organization / Institution:
European Space Agency Business Incubation Centres (ESA BICs)
Author:
European Space Agency
Target Audience:
Entrepreneurs, Start-ups, ESA BIC Applicants
Validity Period:
Not specified
Approval Date:
23/06/2020
Modification Date:
30/09/2022
Year:
2020
Region / City:
Georgia
Topic:
Environmental Education, Outdoor Learning
Document Type:
Toolkit
Organization / Institution:
Environmental Education Alliance (EEA)
Author:
Environmental Education Alliance (EEA)
Target Audience:
Environmental educators, K-12 school teachers, school district administrators, outdoor learning specialists
Period of Action:
2020
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
United States
Topic:
Military Technology, Virtual Environment, Space Force Training
Document Type:
Request for Information (RFI)
Organization:
United States Space Force
Author:
Unknown
Target Audience:
Industry Partners, Technology Providers
Period of Action:
N/A
Approval Date:
N/A
Modification Date:
N/A
Standard code:
ECSS-E-ST-10-03C Rev.1
Type of document:
Technical standard
Field:
Space engineering
Subject:
Testing requirements for space systems and equipment
Organization:
European Cooperation for Space Standardization
Publisher:
European Space Agency, Requirements and Standards Section
Location:
Noordwijk, The Netherlands
Year:
2022
Initial publication:
15 February 2002
Revision date:
31 May 2022
Edition:
Second issue, Revision 1
Prepared by:
ECSS-E-ST-10-03 TA Task Force
Approved by:
ECSS Technical Authority
Applicability:
Space projects and applications
Language:
English
Copyright holder:
European Space Agency
Change history period:
2002–2022
Note:
Year
Subject:
Safety and Health
Document Type:
Standard
Target Audience:
Employees working in or around confined spaces
Contextual description:
A standard outlining requirements and procedures for entering permit-required confined spaces to protect employees from hazards.
Year:
2011
Region / City:
Houston, Texas
Subject:
Space Station Crew Management
Document Type:
Plan
Organization / Institution:
National Aeronautics and Space Administration
Author:
Not specified
Target Audience:
ISS Program Participants, Mission Integration and Operations Offices
Effective Period:
September 2011 and onwards
Approval Date:
Not specified
Amendment Date:
March 2012
Note:
Year
Topic:
Space Utilization
Document Type:
Questionnaire
Year:
2026
Document Type:
Safety Program Template
Organization:
EMC
Target Audience:
Employees and onsite contractors
Standards Referenced:
OSHA CFR 1910.146, ANSI/ASSE Z117.1-2009
Purpose:
Increase safety of personnel in confined spaces
Scope:
Maintenance, repair, cleaning, construction, or other activities in confined spaces
Key Roles:
Program Administrator, Qualified Person, Management