№ lp_1_17881
Technical test procedure defining data requirements, preconditions, test steps, and verification criteria for aggregators and individual sites providing frequency response and operating reserve services to the power system.
Organisation: EirGrid; SONI
Document type: Test procedure
Template version: 3.0
Publication date: 12 November 2019
Applicable services: Fast Frequency Response; Primary, Secondary and Tertiary Operating Reserve
System operator role: Transmission System Operator
Intended submitter: Aggregator
Approval authority: EirGrid; SONI
Submission requirements: Completed and signed test procedure; test data files; test report
Safety requirements: Site safety requirements specified
Scope: Aggregated Generating Units and Individual Sites
Regulatory context: System services contracting and compliance testing
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.