№ lp_1_2_47442
File format: docx
Character count: 4281
File size: 143 KB
Structured form providing alternative evidence for drainage installation compliance, including site and contractor details, installation and testing records, and guidance for submission to regulatory authorities.
Year:
2026
Document type:
Template for alternative evidence submission
Topic:
Drainage installation and testing
Region / City:
United Kingdom
Regulatory reference:
British Standards, European Standards, Building Regulations
Prepared by:
Applicant or contractor
Intended audience:
Building surveyors, regulatory authorities
Version:
v3
Sections included:
Site information, Contractor information, Drainage installation details, Drainage testing or inspection, Drainage record submission, Declaration, Guidance notes
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / city:
United Kingdom
Topic:
Nuclear power plant siting, land use planning
Document type:
Guidance document
Organization / institution:
Office for Nuclear Regulation (ONR)
Author:
Inspector
Target audience:
ONR inspectors, technical audience
Period of validity:
November 2024 - March 2026
Approval date:
November 2024
Note:
Revision history
Issue 1.3:
Review date extended to June 2025
Issue 1.4:
Review date extended to March 2026
Date of last update:
November 2024
Year:
2025
Note:
Region / city
Topic:
EV Charging Infrastructure, Feasibility Assessment
Document type:
Guide
Organization:
Environmental Protection Department (EPD)
Target audience:
Consultants, Applicants of the EV-charging at Home Subsidy Scheme
Date of amendments:
April 2025 (Version 5)
Year:
2016
Region / City:
United States / Navy bases
Subject:
Fitness, Military Training, Certification
Document Type:
Standard Operating Procedure
Organization / Institution:
U.S. Navy, MWR Navy Fitness, OPNAV (N17), CNIC N921
Author:
U.S. Navy Fitness Command
Target Audience:
Navy Fitness Personnel, CFL Instructors, Military Trainers
Period of Validity:
Ongoing
Approval Date:
May 2016
Modification Date:
Not specified
Year:
2005
Region / city:
Federal Republic of Germany, United States
Theme:
Security requirements for contractors
Document type:
Government regulation
Organization / institution:
U.S. Government
Author:
Not specified
Target audience:
Contractors, Subcontractors
Effective period:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2026
Jurisdiction:
South Carolina, United States
Type of Document:
Legislative Bill
Legislative Session:
126th Session, 2025-2026
Bill Number:
H. 4974
Sponsors:
Reps. Gilliam, Rankin, Yow, C. Mitchell, Haddon
Committee:
House Committee on Medical, Military, Public and Municipal Affairs
Subject:
Restrictions on foreign ownership of land near military bases
Effective Date:
Upon approval by the Governor
Companion Bill:
3343
Year:
2025
Region / City:
N/A
Topic:
Building Regulations
Document Type:
Regulation Schedule
Organization / Institution:
N/A
Author:
N/A
Target Audience:
Qualified Professionals in Building Control
Validity Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2025
Region / City:
Singapore
Topic:
Building Control, Fixed Installations
Document Type:
Regulations
Organization / Institution:
Building and Construction Authority
Author:
Building and Construction Authority
Target Audience:
Developers, Builders, Contractors, Qualified Persons
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Year
Topic:
Electrical Installation
Document Type:
Educational Material
Target Audience:
Students, Electrical Technicians
Contextual Description:
Instructional material for selecting wiring systems and cables for low voltage electrical installations, designed for use in vocational training and assessment of electrical skills.
Year:
2024
Region / City:
Virginia
Topic:
Utility Installation Permits
Document Type:
Application Form
Organization / Institution:
Virginia Department of Transportation (VDOT)
Author:
Virginia Department of Transportation (VDOT)
Target Audience:
Applicants for utility installation permits
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2017
Region / City:
Not specified
Theme:
Nuclear smuggling detection and deterrence
Document Type:
Design requirements document
Author:
Not specified
Target Audience:
NSDD team, contractors, laboratory team members
Period of Validity:
Not specified
Approval Date:
February 28, 2017
Date of Changes:
Not specified
Note:
Year
Topic:
Renewable Energy, Wind Turbines
Document Type:
Technical Specification
Target Audience:
Federal government agencies, contractors
Note:
Year
Subject:
Roofing Installation and Safety Verification
Document Type:
Safety Guidelines
Organization:
Chubb
Target Audience:
Contractors, Subcontractors, Roofing Installers, Project Managers
Year:
2014
Region / City:
Armenia, Azerbaijan, Belarus, Georgia, Republic of Moldova, Russian Federation, Ukraine
Topic:
Air Quality, Environmental Regulation
Document Type:
Report
Organization / Institution:
MWH
Author:
Michael Begak, Monika Přibylová, Valts Vilnītis, Oleg Bely, Tatiana Guseva, Viktar Khodzin, Dmytro Laznenko
Target Audience:
Environmental regulators, policymakers, industry professionals
Period of Validity:
Not specified
Approval Date:
31 August 2014
Amendment Date:
Not specified
Note:
Contextual Description
Year:
2018
Region / city:
Wales
Topic:
Sustainable Drainage Systems (SuDS), Surface Water Management
Document Type:
Guidance
Organ / institution:
Pembrokeshire County Council
Author:
Not specified
Target audience:
Developers, planners, and environmental officers
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Jurisdiction:
Wales
Topic:
Surface water drainage and sustainable drainage systems
Document type:
Drainage statement form
Regulatory framework referenced:
Statutory Standards for Sustainable Drainage Systems (Welsh Government, 2018)
Planning context:
Planning application supporting document
Applicable development threshold:
Construction area greater than 100 m2
Responsible authority:
Monmouthshire County Council
Maintenance responsibility:
SuDS Approval Body adoption for developments serving two or more properties
Referenced standards and guidance:
CIRIA SuDS Manual (C753); BRE Digest 365; BS EN 16941-1:2018; Planning Policy Wales TAN15 (March 2025)
Source links:
Monmouthshire County Council SAB guidance
Year:
2023
Region / city:
Unalakleet, Alaska
Topic:
Climate change, permafrost degradation, drainage networks, coastal erosion, subsidence, resilience planning
Document type:
Technical Report
Organization / institution:
NASA DEVELOP, National Renewable Energy Lab (NREL), University of Georgia, University of Alaska Fairbanks, Woodwell Climate Research Center, University of Connecticut
Authors:
Ian Lee, M. Jaweed Nazary, Clara Maxwell, Daniel J. Marsden, Dr. Marguerite Madden, Dr. Franz Meyer, Dr. Simon Zwieback, Dr. Anna Liljedahl, Dr. Chandi Witharana, Sarah Payne
Target audience:
Researchers, policy makers, environmental scientists, local community planners
Period of validity:
2017 – 2023
Approval date:
August 11th, 2023
Date of changes:
Not specified
Year:
2015
Region / City:
Danville, IL
Subject:
Construction and drainage corrections at Danville National Cemetery
Document Type:
Solicitation
Agency / Organization:
Department of Veterans Affairs (VA), National Cemetery Administration (NCA)
Author:
Marilyn L. Rodriguez
Target Audience:
Small Business Contractors, SDVOSB Firms
Validity Period:
Until September 11, 2015
Approval Date:
N/A
Modification Date:
N/A
Year:
2022
Region / City:
West Side, Township
Theme:
Stormwater management, infrastructure upgrade
Document Type:
Project proposal
Organization / Institution:
Neglia Engineering Associates
Author:
Township of West Side
Target Audience:
Local government officials, engineering professionals
Period of Validity:
Until completion of the project
Approval Date:
Nov 2022
Modification Date:
N/A