№ lp_2_3_61964
File format: docx
Character count: 2751
File size: 42 KB
The document is a progress report detailing the financial expenditures and project status of the Solar Farm 2.0 Landscape Buffer project, funded by the Student Sustainability Committee.
Year:
2021
Region / City:
Urbana-Champaign, Illinois
Subject:
Solar Farm Project, Sustainability Initiatives
Document Type:
Progress Report
Institution:
University of Illinois
Author:
Student Sustainability Committee
Target Audience:
University of Illinois staff, sustainability committee
Period of Validity:
FY21
Approval Date:
N/A
Date of Modifications:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / city:
Georgia
Topic:
Environmental protection, buffer zone regulations
Document type:
Application form
Organization / institution:
Georgia Department of Natural Resources
Author:
Unknown
Target audience:
Property owners, project developers, contractors
Period of validity:
Ongoing
Approval date:
Unknown
Modification date:
Unknown
Year:
2010
Region / City:
Georgia
Topic:
Environmental Protection, Roadway Drainage
Document Type:
Legal Guidance
Agency / Institution:
Georgia Environmental Protection Division (EPD), Georgia Department of Transportation (GDOT)
Author:
Jim Ussery, Bert Langley
Target Audience:
Government agencies, contractors, construction professionals
Effective Period:
2010-present
Approval Date:
September 20, 2010
Amendment Date:
June 8, 2006 (prior memorandum)
Legal Authority:
Georgia Erosion and Sedimentation Control Act, Georgia Water Quality Control Act, Clean Water Act
Permits:
NPDES Construction General Stormwater Permit (GAR100002)
Context:
Legal guidance document outlining the exemption of roadway drainage structure construction from stream buffer variance requirements in Georgia, with specific references to applicable regulations and previous memoranda.
Year:
2023
Region / City:
N/A
Subject:
Power Integrity Modeling
Document Type:
Technical Specification
Organization / Institution:
Intel Corp.
Author:
Kinger Cai, Chi-te Chen
Target Audience:
Engineers, Technical Specialists
Effective Period:
N/A
Approval Date:
July 14, 2023 (223); November 17, 2023 (223.1)
Date of Changes:
September 12, 2023
BIRD NUMBER:
222
ISSUE TITLE:
Clock Times Clarifications
REQUESTOR:
Arpad Muranyi, Siemens EDA
DATE SUBMITTED:
November 8, 2022
DATE ACCEPTED:
December 9, 2022
SPECIFICATION:
IBIS v7.1
TYPE:
Technical clarification document
TOPIC:
AMI_GetWave function clock_times argument behavior
AFFECTED MODELS:
Clocked Rx AMI executable models
PROPOSED CHANGES:
Extended definition and rules for clock_times as input and output
Year:
2017
Region / City:
N/A
Topic:
Signal Integrity, Analog Buffer Models
Document Type:
Technical Specification
Author:
Walter Katz, Todd Westerhoff, Fangyi Rao, Radek Biernacki
Target Audience:
Engineers, Signal Integrity Professionals
Period of Validity:
N/A
Approval Date:
October 27, 2017
Modification Date:
N/A
Year:
2015
Region / City:
N/A
Topic:
Electronics, IBIS Specification
Document Type:
Technical Specification
Organization:
IBIS Open Forum
Authors:
Radek Biernacki, Ming Yan, Justin Butterfield, Randy Wolff
Target Audience:
Engineers and developers working with IBIS models
Effective Period:
N/A
Approval Date:
June 12, 2015
Modification Date:
N/A
Year:
2023
Region / City:
Not specified
Topic:
Tumor Metabolism, Glycolysis, Kinetic Modeling
Document Type:
Research Paper
Institution / Organization:
Not specified
Author:
JHGM van Beek
Target Audience:
Researchers in biochemistry and oncology
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2018
Organization:
Norwegian Defence Materiel Agency
Document Type:
Request for Information (RFI)
Subject:
Modernization of Ship Shore Ship Buffer (SSSB) system and UHF radio upgrade
Target Audience:
NATO member state suppliers
Deadline for Questions:
1 February 2018
Deadline for Responses:
15 February 2018
Communication Channel:
Email
Confidentiality:
Responses handled confidentially by NDMA Communication and Information Systems Division
Reference Standards:
STANAG 5511, STANAG 5522, STANAG 4372, STANAG 4246
Year:
2024
Region / City:
Ile-Ife, Nigeria
Topic:
Public Policy, State Failure
Document Type:
Inaugural Lecture
Organization / Institution:
Obafemi Awolowo University
Author:
Taiwo Akanbi Olaiya
Target Audience:
Academics, Public Administration professionals, Students
Period of Validity:
2024 and onwards
Approval Date:
October 8, 2024
Date of Changes:
None
Year:
2018
Region / City:
N/A
Topic:
DNA preparation, Genotyping
Document Type:
Protocol
Organization / Institution:
N/A
Author:
Zhaoyang Liu
Target Audience:
Researchers, Laboratory Technicians
Period of Use:
N/A
Approval Date:
N/A
Date of Modifications:
N/A
Year:
2015–2017
Region / Location:
Chesapeake Bay Watershed, including PA, MD, DE, VA, WV, NY
Topic:
Riparian forest buffers, conservation practices, watershed management
Document Type:
Work Plan and Logic Table
Organization / Agency:
USFS, FSA, ACB, State Leads, PA DCNR, PA DEP, MD CREP Committee, Chesapeake Bay Commission, Choose Clean Water Coalition
Author:
Goal Implementation Teams and Workgroups
Primary Audience:
Goal Implementation Teams, Workgroups, Management Board
Secondary Audience:
Internal and external interested parties
Actions:
RFB leadership coordination, program enhancements, funding and partner engagement, policy development, pilot projects
Metrics:
Acres enrolled in CREP, specific action completion, technical assistance metrics
Timeline:
Ongoing through December 2017
Legislation and Programs:
2018 Farm Bill, Clean Water Act, state grant programs
Stakeholders:
Government agencies, NGOs, landowners, public engagement programs
Challenges:
Funding consistency, partner coordination, education and outreach gaps
Year:
2011
Region / City:
N/A
Topic:
Back-channel communication for PCI Express Gen 3 and related standards
Document Type:
Technical specification
Organization / Institution:
IBIS Open Forum
Author:
Marcus Van Ierssel, Snowbush IP; Kumar Keshavan, Ambrish Varma, Ken Willis, Cadence Design Systems, Inc.; Bob Ross, Teraspeed Consulting Group
Target Audience:
Engineers and developers in the field of high-speed serial communication
Effective Period:
N/A
Approval Date:
N/A
Date of Revision:
July 29, 2014
Date Accepted by IBIS Open Forum:
N/A
Year:
2024
Region / City:
United Kingdom
Topic:
Environmental conservation
Document Type:
Policy guideline
Organization:
Department of Agriculture, Environment and Rural Affairs (DAERA)
Author:
Not specified
Target audience:
Farmers, environmental planners, and land management professionals
Duration:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Bixby, OK
Subject:
Lawn & Landscape Maintenance
Document Type:
Request for Proposals (RFP)
Organization / Institution:
Bixby Fire Department
Author:
Bixby Fire Department
Target Audience:
Contractors, Vendors
Effective Period:
May 14, 2024 – ongoing
Approval Date:
May 13, 2024
Modification Date:
N/A
Year:
2023
Region:
Chilterns, England, United Kingdom
Subject:
Nature conservation and habitat restoration
Document type:
Strategic plan / guidance
Organization:
Natural England
Target audience:
Land managers, conservation organizations, local authorities, local communities
Key habitats:
Woodlands, chalk streams, wetlands, ponds, farmland
Geographical significance:
National Landscape designation
Objectives:
Nature recovery, species protection, habitat connectivity, monitoring and evaluation
Legislation framework:
Protected Landscape Targets and Outcomes Framework (PLTOF)
Landscape Architecture Scoping Questionnaire to Determine Visual Impact Assessment Level August 2023
Year:
2023
Region / City:
California
Topic:
Visual Impact Assessment
Document Type:
Questionnaire
Agency / Institution:
Caltrans
Author:
Not specified
Target Audience:
Landscape Architects, Environmental Planners, Project Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2024
Region / City:
United States of America
Theme:
Space exploration, safety and mission assurance
Document Type:
Report
Organization:
National Aeronautics and Space Administration (NASA)
Author:
Johnny T. Nguyen, Frances M. Heinlein, Marguerite T. Jones, Nicholas R. Bell
Target Audience:
Professionals in aerospace and space exploration
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / city:
Europe
Topic:
Regenerative Agriculture
Document Type:
Expression of Interest Form
Organization / institution:
EIT Food
Author:
EIT Food and Foodvalley NL
Target Audience:
Agri-food companies in Horizon Europe eligible countries
Period of validity:
From 10th July 2024 to 31st August 2024
Approval Date:
10th July 2024
Modification Date:
Not specified
Year:
March 2024
Region / City:
USA
Subject:
Reimbursement, Healthcare Economics
Document Type:
Guide
Organization / Institution:
Abbott
Author:
Abbott
Target Audience:
Healthcare providers, medical professionals
Effective Period:
March 2024 and ongoing
Approval Date:
March 2024
Year:
2021
Region / city:
Uzbekistan
Theme:
Environmental Protection, Sustainable Development
Document Type:
Project Document
Institution / Agency:
United Nations Development Programme
Author:
N/A
Target audience:
Stakeholders in environmental protection and sustainable development
Period of validity:
2022–2026
Approval date:
N/A
Date of amendments:
N/A