№ files_lp_4_process_2_82353
File format: docx
Character count: 12622
File size: 1540 KB
Year:
2017-2023
Location:
University of Salerno campus, Fisciano, Italy
Subject:
Green roofs hydrology
Document type:
Research article
Institution:
University of Salerno
Authors:
Roberta D’Ambrosio, Antonia Longobardi
Target audience:
Researchers in urban hydrology and green infrastructure
Experimental sites:
GR1 and GR2
Substrate type:
Peat soil
Climate classification:
Hot-summer Mediterranean (Csa)
Measurement period:
2017-2019, 2022-2023
Hydrological focus:
Retention capacity variations over time
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Waterproofing
Document Type:
Technical Specification
Organization / Institution:
KÖSTER BAUCHEMIE AG
Target Audience:
Construction professionals, roofing contractors
Product Data:
KÖSTER TPO Waterproofing Membrane
Storage and Handling:
Specific temperature range and storage guidelines
Installation Method:
Loose laying with ballast, mechanical fastening, full surface, or strip adhesion
Fire Resistance:
Class E (DIN EN 13501-1)
UV Resistance:
Passed – Level 0 (DIN EN 1297)
Waterproofing Membrane:
Polyolefin-based with glass fleece reinforcement
Year:
2019
Region / City:
Chicago, IL
Subject:
Roof Replacement
Document Type:
Pre-Solicitation Notice
Organization:
Department of Veterans Affairs
Author:
Roniece Ambrose, Contracting Specialist
Target Audience:
Contractors, Vendors, Bidders
Period of Action:
From Notice to Proceed, approximately 240 calendar days
Approval Date:
November 12, 2019
Amendment Date:
December 12, 2019
Additional Information:
Project includes demolition and roof replacement at the Jesse Brown VA Medical Center
Note:
Description
Year:
2026
Location:
CSIR Pretoria Campus, South Africa
Document Type:
Health and Safety Specification
Authoring Organization:
Council for Scientific and Industrial Research (CSIR)
Approved by:
Client and Project Manager
Regulatory References:
Occupational Health and Safety Act 85 of 1993; Construction Regulations 2014; Basic Conditions of Employment Act 75 of 1997; National Environmental Management Act 107 of 1998; Compensation for Occupational Injuries and Diseases Act 130 of 1993
Target Audience:
Contractors, service providers, and health and safety personnel
Scope:
Encapsulation of existing asbestos roof covering using foam-over system/process
Revision History:
Multiple revisions documented with signatures and dates
Abbreviations:
OHS, CEO, CR, HCS, MSDS, AIA, HBA, OEL, CSIR, H&SS, HS&EP, HS&EF, CHSO
Year:
2016
Region / city:
Batavia, NY
Topic:
Construction, Contracting
Document type:
Government solicitation
Issuing organization:
Department of Veterans Affairs - NCO 2
Author:
Kathleen Ellis
Target audience:
Contractors, Service-Disabled Veteran-Owned Small Business (SDVOSB)
Period of validity:
March 9, 2016 (site visit)
Approval date:
March 23, 2016
Date of amendments:
Not specified
Note:
Year
Topic:
Roof Coating, Roofing Systems
Document Type:
Specification
Organization / Institution:
Henry Company
Target Audience:
Architects, Roofing Contractors
Project Specific:
Yes
Year:
2023
Reference number:
MSQ 13 of 2023
Region / city:
Pietermaritzburg
Country:
South Africa
Institution:
Msunduzi Museum
Department:
Museum Administration Department
Document type:
Request for quotations specifications
Subject:
Repairs and maintenance of thatched roofs
Facilities concerned:
Voortrekker House (333 Boom Street), Andries Pretorius House, Zulu Hut
Work scope:
Removal, repair and installation of thatch roofing, ridge assessment and repair, application of fire retardant, moisture treatment
Technical standards:
SABS standards, TASA requirements
Required contractor registration:
Thatchers Association of South Africa (TASA)
Material requirements:
SABS and TASA approved materials
Guarantee period:
24 months
Mandatory documentation:
SBD 4 declaration form, SBD 6.1 local content form, BBBEE certificate or sworn affidavit, COIDA certificate, CSD registration, CIDB certificate, references
Briefing date:
04 December 2023, 11:00
Quotation deadline:
14 December 2023
Contact person (quotation process):
Simphiwe Mbeje
Technical contacts:
Mabo Mdluli; Reggie Moodley
Contact telephone:
033 394 6834
Submission method:
Email submission
Reference number:
RFB 3024/2024
Document type:
Bid specification annexure
Procuring entity:
South African Police Service (SAPS)
Implementing agency:
State Information Technology Agency (SITA)
Country:
South Africa
Year:
2024
Subject matter:
Procurement of F5 load balancers and related services
Products covered:
F5 VELOS hardware, software, licenses and add-ons
Services included:
Maintenance, support and professional services
Service period:
Five years (60 months)
Scope of work:
Supply, design, installation, configuration and support of load balancing and application security solutions
Delivery locations:
SITA Centurion, SITA Beta, Pretoria
Evaluation framework:
Mandatory administrative, technical and contractual evaluation stages
Related annexes:
Annex A (Bidder substantiating evidence), Annex B (Addendum 1)
Year:
2024
Five-Year Period:
July 1, 2024 – June 30, 2029
Document Type:
Five-Year Public Housing Agency Plan
Public Housing Authority:
Marlborough Community Development Authority
PHA Code:
MA070
Plan Submission Type:
5-Year Plan Submission; Revised 5-Year Plan Submission
Jurisdiction:
Marlborough, Massachusetts, United States
Office Location:
250 Main Street, Marlborough, MA 01752
Housing Programs Referenced:
Section 8 Housing Choice Voucher Program
Target Population:
Low-income, very low-income, and extremely low-income families
Mission Focus:
Affordable housing, fair housing, and nondiscrimination
Regulatory Framework:
U.S. Department of Housing and Urban Development requirements
VAWA Coverage:
Violence Against Women Act, including VAWA 2022
Resident Participation:
Resident Advisory Board involvement
Source Type:
Official planning and policy document of a public housing authority
Year:
2020
Region / City:
Kilkenny
Subject:
Tender response for strategic planning
Document Type:
Tender document
Organization / Institution:
Kilkenny Volunteer Centre
Author:
Not specified
Target Audience:
Tenderers, Kilkenny Volunteer Centre representatives
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Contextual description:
This document outlines the requirements and criteria for submitting a tender for the development of a strategic plan for Kilkenny Volunteer Centre.
Year:
2024
Region / City:
Virginia
Theme:
Developmental Disabilities, Community Supports, Policy Advocacy, Disability Services
Document Type:
State Plan Update
Agency:
Virginia Board for People with Disabilities
Author:
Virginia Board for People with Disabilities
Target Audience:
Virginians with developmental disabilities, policymakers, disability service providers
Period of Implementation:
October 1, 2021 - September 30, 2026
Approval Date:
August 14, 2024
Amendment Date:
August 14, 2024
Year:
2020
Region / City:
Clark County
Theme:
Transportation Planning
Document Type:
County Planning Document
Organ / Institution:
Clark County Commission
Author:
First District Association of Local Governments
Target Audience:
County Commission, Public, Township Officials
Effective Period:
2020–2025
Approval Date:
October 6, 2020
Amendment Date:
N/A
Year:
2024
Region / City:
New York City
Topic:
Accessibility Plan
Document Type:
Official Plan
Organization / Institution:
New York City Department of Youth and Community Development
Author:
New York City Department of Youth and Community Development
Target Audience:
New Yorkers with disabilities, agency employees, and community-based organizations
Implementation Period:
2024-2028
Approval Date:
2024
Date of Changes:
N/A
Year:
2015 - 2019
Region / City:
Dibanda, Cameroon
Theme:
Rehabilitation, Disability Support, Healthcare
Document Type:
Strategic Plan
Organization / Institution:
The Associated Rehabilitation Centre for the Handicapped (ARCH)
Author:
Rev. Sr. Leonarda Ngoin Tubuo
Target Audience:
Healthcare professionals, rehabilitation specialists, donors, governmental and non-governmental organizations
Period of Action:
2015 – 2019
Approval Date:
2015
Date of Changes:
Not specified
Year:
FY 2019
Region / city:
Kansas, USA
Document type:
Consolidated Plan / Federal Funding Report
Administering agencies:
Kansas Department of Commerce, Kansas Housing Resources Corporation (KHRC), Kansas Department of Health and Environment (KDHE)
Programs included:
CDBG, ESG, HOME, HOPWA, HTF
Objectives:
Affordable housing, homelessness prevention, economic development, community facilities, public infrastructure
Target populations:
Low- and moderate-income persons, persons living with HIV/AIDS, homeless individuals, minority- and women-owned businesses
Data sources:
Comprehensive Housing Affordability Strategy (CHAS), American Community Survey
Stakeholder engagement:
In-person and online sessions with agency leaders and program stakeholders
Estimated funding:
CDBG $14.89M, HOME $5.8M, HOPWA $572,576, ESG $1.6M, HTF $3M
Outcomes measurement:
Persons assisted, housing units constructed or rehabilitated, economic development metrics
Author:
Xi Jinping
Organization:
Central Committee of the Communist Party of China
Issuing body:
Political Bureau of the CPC Central Committee
Document type:
Political report and explanatory speech
Subject:
Formulation of the 15th Five-Year Plan for National Economic and Social Development
Plan period:
2026–2030
Related period:
14th Five-Year Plan (2021–2025)
Occasion:
Fourth Plenary Session of the 20th CPC Central Committee
Date of drafting process:
January–August (year not specified)
Geographical scope:
People’s Republic of China
Key figures mentioned:
Li Qiang; Wang Huning; Cai Qi; Ding Xuexiang
Primary themes:
Economic planning; socialist modernization; national development strategy; intra-Party democracy
Political context:
Implementation of the two-step strategic plan set forth at the 20th National Congress of the CPC
Year:
2025-2029
Region / City:
Global
Theme:
Fisheries Management, Stock Assessment
Document Type:
Work Plan
Organization:
SSC NFS
Author:
SSC NFS Members
Target Audience:
Fisheries Managers, Scientists, and Stakeholders
Effective Period:
2025-2029
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2021
Region / City:
United States
Theme:
Environmental site inspection
Document Type:
Checklist
Organization / Institution:
U.S. Environmental Protection Agency (EPA), U.S. Army Corps of Engineers (USACE)
Author:
U.S. Environmental Protection Agency (EPA)
Target Audience:
Environmental inspectors, site managers
Effective Period:
2021–ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Organization:
NGCDD
Document Type:
Action Plan
Subject:
Development of the 2027–2031 Five-Year State Plan
Legal Framework:
Developmental Disabilities Assistance and Bill of Rights Act (DD Act)
Planning Period:
2027–2031
Process Timeline:
2024–2026
Key Components:
Strategic Planning, Data Collection and Analysis, Goal Development
Focus Areas:
Advocacy, Capacity Building, Systemic Change, Self-Advocacy, Leadership Development
Target Population:
Individuals with Developmental Disabilities and Their Families
Collaborating Entities:
DD Network, P&A, UCEDD, Stakeholders
Required Elements:
Self-Advocacy Funding, Leadership Training, Cross-Disability Coalitions
Period:
1949–1962
Country:
China
Topic:
Economic development, industry and agriculture
Document type:
Educational study notes and analytical questions
Historical context:
Post-revolution economic reconstruction and socialist transformation
Key policies discussed:
First Five-Year Plan; Second Five-Year Plan; Great Leap Forward
Economic sectors:
Agriculture; Heavy industry; Steel production
Political leadership:
Mao Zedong
Population context:
Predominantly rural population with large-scale migration to cities
Agricultural policy:
Land redistribution; collectivisation; Agricultural Producers’ Cooperatives
Industrial policy:
State planning; heavy industrialisation; Soviet technical assistance
Foreign involvement:
Soviet loans and advisers under the Sino-Soviet agreement of 1950
Statistical references:
Agricultural production growth rates; industrial output expansion; urban population growth
Intended use:
Educational material for historical analysis of Chinese economic policies
Year:
2026
Region / Location:
United States
Subject:
Environmental Site Review
Document Type:
Guidance / Instruction
Organization:
Environmental Protection Agency (EPA)
Author:
EPA Staff
Target Audience:
Site managers, O&M personnel, local authorities, community representatives
Review Period:
Five-year site review
Date of Issuance:
2026
Interview Focus Areas:
Background information, State and local considerations, Construction considerations, Performance and O&M issues