№ files_lp_3_process_7_099723
File format: docx
Character count: 2584
File size: 41 KB
This legal statute outlines the required size and specifications for elevators in multi-story buildings to accommodate ambulatory transport.
Year:
2023
Region / City:
Maine
Topic:
Elevator Requirements
Document Type:
Legal Statute
Organization / Institution:
State of Maine
Author:
State of Maine
Target Audience:
Private entities, nonprofit organizations, public accommodation facilities
Effective Period:
From 2023 onward
Approval Date:
October 1, 2025
Date of Changes:
October 1, 2025
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2017
Region / City:
United States
Theme:
Evaluation Criteria
Document Type:
Evaluation Worksheet
Agency / Organization:
U.S. Government
Author:
Not specified
Target Audience:
Evaluators and Offerors
Effective Period:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2023
Region / City:
Boise, ID
Topic:
Smoke and Draft Control
Document Type:
Technical Specification
Organization / Institution:
Smoke Guard, A CSW Industrials Company
Author:
Not specified
Target Audience:
Contractors, Architects, Engineers
Period of Validity:
Not specified
Approval Date:
Not specified
Revision Date:
Not specified
Project:
East County Regional Center Elevator Modernization
RFP Number:
FSO-2018-04-JR
Governing Law:
Public Contract Code section 4100 et seq.
Applicable Sections:
4109, 4110
Contractor Obligations:
List all subcontractors exceeding 0.5% of total proposal, provide CSLB and DIR numbers, ensure registration with Department of Industrial Relations
Date:
(as provided in signature line)
Proper Name of Proposer:
(as provided in document)
Signature:
(as provided in document)
Print Name:
(as provided in document)
Title:
(as provided in document)
Document Type:
Contract Attachment
Audience:
Contractors and Proposers
Year:
2018
Region / City:
East County
Subject:
Elevator Modernization
Document Type:
Cost Proposal
Organization:
Judicial Council of California
Author:
Not specified
Target Audience:
Contractors, Judicial Council of California
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Year
Subject:
Digital preservation, data management, and policy development
Document Type:
Exercise
Organization / Institution:
APARSEN, JISC, SCAPE, Library of Congress
Target Audience:
Academics, researchers, digital preservation professionals
Note:
Year
Contextual Description:
Specification for the installation and requirements of a complete electric traction elevator system for construction projects.
Note:
Year
Document Type:
Job Description
Target Audience:
Industry professionals, Elevator operators, Inspectors
Year:
2018
Region / City:
Augusta, GA
Topic:
Architectural and Engineering Services, Elevator System Upgrade, Roof Replacement
Document Type:
Presolicitation Notice
Agency / Institution:
Department of Veterans Affairs
Author:
Phillip M. Braswell, Contract Specialist
Target Audience:
Service-disabled veteran-owned small businesses (SDVOSB)
Period of Action:
Until proposal submission date (02/20/2018)
Date of Approval:
February 20, 2018
Date of Changes:
N/A
Context:
A solicitation for architectural and engineering services for multiple upgrades and replacements at the Charlie Norwood VA Medical Center in Augusta, GA, including elevator system upgrades and roof replacements, with a focus on SDVOSB participation.
Year:
2013
Note:
Region / city
Subject:
Bulk Material Handling, Conveyor Systems
Document Type:
Technical Guide
Author:
Warren Knapp, Kris Gililland, Erik Matheson, Chris Tarver
Target Audience:
Engineers, Equipment Designers, Material Handling Professionals
Context:
This document provides guidelines and considerations for selecting the appropriate type of bucket elevator based on material characteristics, design variables, and environmental factors.
Year:
2014
Region / City:
N/A
Subject:
Bucket elevator design and casing construction
Document Type:
Technical Manual
Organization / Institution:
Screw Conveyor Corp
Author:
Warren Knapp
Target Audience:
Engineers and professionals in industrial material handling
Period of Validity:
N/A
Approval Date:
N/A
Revision Date:
2014-06-13
Document Status:
Draft / Review
Contacts:
Warren Knapp ([email protected]
Note:
)
Keywords:
Casing, Bucket Elevator, Design, Structural Support, Material Handling, Elevator Components
Year:
20__
Region / City:
_______________________________
Topic:
Mechanical installation
Document Type:
Certificate of Completion/Operation
Organization:
_________________________________
Author:
_______________________________
Target Audience:
Owner/Applicant
Effective Period:
N/A
Approval Date:
_____________________
Modification Date:
N/A
Year:
2023
Region / City:
Massachusetts, Boston
Subject:
Elevator mechanic license application
Document Type:
Application form
Organization:
Office of Public Safety and Inspections
Author:
Commonwealth of Massachusetts
Target Audience:
Individuals applying for an elevator mechanic’s license
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2026
Region / City:
Lynn, MA
Subject:
Elevator Maintenance
Document Type:
Invitation for Bids
Organization:
Lynn Housing Authority and Neighborhood Development
Author:
Charles Gaeta
Target Audience:
General contractors
Effective Period:
Three years
Approval Date:
February 19, 2026
Amendment Date:
None
Cost Estimate:
$110,000
Contract Duration:
3 years
Contract Specifications Available:
February 4, 2026
Bid Submission Deadline:
February 19, 2026, 10 am
Bid Deposit:
5% of base bid amount
Document Type:
Bid Fee Sheet
Project Type:
Elevator Modernization
Projects:
Girard Gardens; Shortridge; Lincoln; Plaza Terrace; W L Hart
Total Project Cost Field:
Included
Discount Terms:
Early payment discount option based on invoice payment period
Procurement Program Reference:
Section 3 Priority Classification
Section 3 Priority Levels:
Priority I; Priority II; Priority III; Priority IV; Priority V; Priority VI; Priority VII; None
Federal Forms Referenced:
HUD 5369; HUD 5369-A; HUD 5370
Contractual Attachments:
Attachment H; Attachment N
Addenda Acknowledgement:
Required for all issued addenda
Issuing Authority:
SMHA
Bidder Information Required:
Company Name; Address; Phone; Email; Authorized Agent Name; Authorized Agent Signature
Contract Incorporation:
HUD forms and addenda incorporated into resulting contract
Year:
2020
Region / city:
Australia
Theme:
Sewage pumping station design
Document type:
Template
Organization:
Urban Utilities
Author:
Harald Kemmetmuller
Target audience:
Design and engineering teams, project managers
Effective period:
2020-2025
Approval date:
29/06/2020
Revision date:
28/01/2025
Year:
Not specified
Region / City:
Not specified
Subject:
Industry Trends, Market Sizing
Document Type:
Lesson Plan
Organization / Institution:
Wadhwani Foundation
Author:
Not specified
Target Audience:
Students
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Tender Notice No:
TN. No:2 / TTD-Dr YSRHU/CRS-TPT 2022-23
Date of Commencement of DOWNLOADING OF THE BID DOCUMENT:
29.07.2022 AT 4.00 PM
Last date for receipt of bids:
06.08.2022 AT 2.00 PM
Time and date of opening of Technical and Price bid:
06.08.2022 AT 2.30 PM
Address for Communication:
THE PRINCIPAL SCIENTIST (HORT.) & HEAD, CITRUS RESEARCH STATION, TIRUPATI – 517 502, TIRUPATI DISTRICT, ANDHRA PRADESH
Year:
2022-23
Region / City:
Tirupati, Andhra Pradesh
Theme:
Supply and framing of printed images
Document Type:
Tender
Organization / Institution:
Dr. Y. S. R. Horticultural University, Citrus Research Station
Author:
Dr. Y. S. R. Horticultural University
Target Audience:
Bidders, manufacturers, and authorized representatives
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2021
Region / city:
Cheshire and Merseyside
Topic:
Public Law Family Proceedings
Document type:
Practice Note
Organ / institution:
Family Court
Author:
Judge Steven Parker
Target audience:
Solicitors, experts, and local authority social workers
Effective period:
Ongoing
Approval date:
9th November 2021
Amendment date:
None
Contextual description:
Practice Note addressing limits on document size and bundle contents in public law family proceedings, detailing specific guidelines for compliance with PD27A.
Year:
2023
Region / City:
Connecticut
Subject:
Career and Technical Education
Document Type:
Policy Guidelines
Organization:
Connecticut State Department of Education
Target Audience:
Secondary education institutions, educators, administrators
Period of Validity:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A