№ lp_1_2_60332
File format: docx
Character count: 48526
File size: 59 KB
Formed sheet metal work for wall and roof flashing, copings, roof edge metal, fasciae, drainage specialties, and formed expansion joint covers are specified in this section.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Section:
22 05 29 (implied)
Part:
1 – General; 2 – Products; 3 – Execution
Work Included:
Pipe and Equipment Hangers, Supports, Anchors, Sleeves, Seals, Flashing
Related Sections:
22 05 10 Basic Plumbing Requirements; 22 00 19 Plumbing Piping Insulation; 22 10 00 Plumbing Piping; 23 11 23 Facility Natural-Gas Piping; 22 30 10 Plumbing Equipment; 23 21 00 Hydronic Piping; 23 23 00 Refrigerant Piping and Specialties
Document Type:
Technical construction specification
Discipline:
Mechanical / Plumbing
Specified Manufacturers:
B-Line Systems; Grinnell; F and S Central; Other as approved by Architect/Engineer (A/E)
Submittals:
Shop drawings for pipe supports
Materials:
Carbon steel; galvanized steel; cast iron; copper plated steel; stainless steel (316); polyester resin; vinyl ester resin; fiberglass; glass reinforced polyurethane; sheet lead; butyl flashing; silicone sealant
Standards Referenced:
UL Listed fire rated sleeves
Application:
Commercial or institutional building construction
Scope:
Requirements for fabrication, materials, installation, spacing, and support of piping systems including hydronic, plumbing, natural gas, and refrigerant piping
Organization:
Hickman Edge Systems
Address:
4 Commerce Way, Arden, North Carolina 28704
Country:
United States
Phone:
828-676-1700
Website:
HickmanEdgeSystems.com
Email:
[email protected]
Document Type:
Guide specification
Specification Format:
Construction Specifications Institute (CSI) 3-Part Format
MasterFormat Section:
07 71 19.03
Subject:
Manufactured fascia systems with flashing for roofing edges
Related System:
Low-slope roofing edge systems
Reference Standards:
ANSI/SPRI/FM 4435/ES-1 – Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems
Industry Organization Reference:
FM Global; SPRI (Single Ply Roofing Industry)
Manufacturer:
Hickman Edge Systems
Product System:
“Drip Edge” Fascia System
Primary Materials:
Aluminum fascia covers; galvanized steel cleats
Material Thickness Options:
0.040", 0.050", 0.063" aluminum; 24 ga. or 22 ga. galvanized steel
Typical Applications:
Single-ply roofing systems
Wind Warranty Options:
Up to 215 mph lifetime wind warranty or 90 mph 10-year wind warranty
Finish Warranty:
Limited 30-year warranty for prefinished coil-coated steel and aluminum with Kynar 500 colors
Installer Qualification Requirement:
Minimum 5 years of fascia installation experience
Manufacturer Qualification Requirement:
Minimum 15 years manufacturing fascia systems
Sample Requirement:
Minimum 6-inch fascia sample and color chip set
Submittal Types:
Product data, shop drawings, samples, certifications, project references, warranty documentation
Referenced Project Documentation:
Drawings, Division 01 specifications, and roofing sections
Year:
2023
Region / City:
Not specified
Subject:
BIOS flashing
Document type:
Instruction manual
Organization / Institution:
Not specified
Author:
Not specified
Target audience:
Users needing BIOS update
Validity period:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2024
Region / City:
United Kingdom
Subject:
Structural Integrity of Metal Components in Nuclear Industry
Document Type:
Technical Assessment Guide
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Inspector and Principal Inspector
Target Audience:
ONR Inspectors and Nuclear Industry Stakeholders
Effective Period:
2024–2026
Approval Date:
September 2024
Next Review Date:
April 2026
Year:
Not specified
Region / City:
Not specified
Topic:
Sheet Metal Design and Engineering Checklist
Document Type:
Checklist
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Suppliers
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A checklist for engineers to confirm essential items when preparing drawings for custom sheet metal, ensuring compliance with material, design, and manufacturing standards.
Note:
Year
Year:
2024
Region / City:
Jackson, MI
Subject:
Roofing Replacements
Document Type:
Request for Proposals (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jackson County Parks
Target Audience:
Contractors, Roofing Companies
Period of Action:
2024
Approval Date:
1/19/2024
Date of Changes:
N/A
Authors:
M. P. Browne; C. O’Rourke; Nathan Wells; A. Mills
Affiliation:
School of Chemistry and Chemical Engineering, Queen’s University Belfast
Country:
United Kingdom
Contact email:
[email protected]
Keywords:
Electrochemistry; Sustainable chemistry; Catalysis; Water splitting
Document type:
Scientific research article
Research field:
Electrocatalysis and photoelectrochemistry
Synthesis method:
Adams method using molten sodium nitrate
Materials studied:
RuO2; Mn2O3; Co3O4; NiO
Electrochemical reactions:
Hydrogen evolution reaction; Oxygen evolution reaction
Electrolyte:
1 M NaOH
Electrode preparation:
Solvent-free pressed powder discs with PTFE binder
Energy source:
Silicon solar cell under AM 1.5 G illumination
Source type:
Experimental laboratory study reporting synthesis, characterization, and electrochemical performance of metal oxide catalysts for solar-driven water splitting.
Year:
2026
Region / city:
Australia
Subject:
Roofing systems and associated works
Document type:
Worksection Template / Technical specification
Organization / institution:
NATSPEC, FIELDERS Steel Roofing Pty Ltd
Intended audience:
Engineers, architects, construction companies
Standards referenced:
AS/NZS 1170.2 (2021), AS 4055 (2021), AS/NZS 3500.3 (2021), AS 2312.1 (2014), AS 4312 (2019), AS 1657 (2018), AS/NZS 1170.3 (2003)
Materials covered:
FIELDERS seamed sheet metal, COLORBOND® prepainted steel, roof plumbing, skylights, roof hatches, roof windows, roof ventilators
Environmental considerations:
Bushfire protection, snow load, green roof design, recycled content, corrosion resistance
Responsibilities:
Provide FIELDERS specialised sheet metal roofing system as documented
Design parameters:
Wind pressure, rainfall intensity, R-Value, U-Value
Related worksections:
0193, 0342, 0343, 0411, 0461, 0471, 0472, 0552, 0802, 0423, 0425, 0426, 0427, 0428, 0429, 0311p, 0341p, 0436p, 0437p
Year:
2025
Note:
Region / city
Topic:
Metal fabrication, safety, welding, technical standards
Document type:
Standards
Target audience:
Students, metal fabrication professionals
Effective period:
July 2025
Year:
Not specified
Region / City:
Not specified
Topic:
Metal composite materials, rain screen systems, and performance requirements
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, builders, and engineers involved in construction
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2019
Region / City:
Oakland, CA
Subject:
Architectural Metal Finishes
Document Type:
Specification
Organization:
Móz Designs, Inc.
Manufacturer:
Móz Designs, Inc.
Target Audience:
Architects, Contractors
Warranty:
Yes
Installation Instructions:
Included
Date of Approval:
September 10, 2019
Materials:
Aluminum, Stainless Steel
Thickness:
Various (from .040” to 3/16”)
Finish Options:
Polycoat Gloss, Polycoat Matte, Powder Coat
Custom Options:
Yes
Examination:
Required prior to installation
Humidity Range:
80% or lower
Storage Conditions:
Avoid direct sunlight and moisture
Product Literature:
Yes
Samples:
Required
Year:
2022
Region / City:
N/A
Subject:
Stage 2 Material Solutions
Type:
Learning and Assessment Plan
School:
N/A
Teacher(s):
N/A
Program variant code:
A-W
Credits:
20
Assessment Type 1:
Specialised Skills Tasks – 20%
Assessment Type 2:
Design Process and Product – 50%
Assessment Type 3:
Resources Study – 30%
Endorsement:
Approved by principal or delegate
Date:
N/A
Changes:
Yes, outlined in Addendum
Evaluation method:
Multimodal (4 minutes / 600 words)
Note:
Year
Subject:
Wall Panel Products
Document Type:
Specification Guide
Organ / Institution:
Kingspan Insulated Panels
Target Audience:
Specifiers, Design Professionals
Context:
Guide specification for insulated exterior wall panels composed of IPN QuadCore insulation between metal facings, designed to reduce installation time and provide high-efficiency insulating core, exterior weather barrier, and vapor barrier.
Year:
2020
Region / city:
United Kingdom
Theme:
Climate, Weather, Data, Animation
Document type:
Research Statement
Organization / Institution:
Not specified
Author:
Harry Meadows
Target audience:
Scholars, enthusiasts of climate data, animation, and technology
Period of validity:
Not specified
Approval date:
25th August, 2020
Date of modifications:
Not specified
Note:
Year
Year:
2023
Region / City:
South Portland, Maine
Subject:
Stormwater management
Document Type:
Inspection Report
Institution:
City of South Portland
Author:
Not specified
Target Audience:
Inspectors, City Officials
Period of Validity:
Annual
Approval Date:
Not specified
Date of Changes:
Not specified