№ lp_1_2_57811
The document provides guidelines and procedures for conducting surveys required for highway construction projects in Alabama, detailing methods for control surveys, property surveys, and data collection.
Year: 2021
Region / City: Alabama
Topic: Surveying Requirements
Document Type: Manual
Organization: Alabama Department of Transportation (ALDOT)
Author: Alabama Department of Transportation
Target Audience: Surveyors, Contractors, Project Managers
Period of Validity: N/A
Approval Date: 07/13/2021
Date of Revisions: 07/13/2021
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.