№ lp_1_29365
File format: docx
Character count: 27005
File size: 105 KB
The document describes a health and safety assessment program for contractors, including criteria for leadership, commitment, roles and responsibilities, and a scoring system for compliance with safety regulations.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
India
Topic:
Financial Regulation, Banking
Document Type:
Consumer Education Literature
Institution:
Reserve Bank of India (RBI), PROSPER HOUSING FINANCE LIMITED (PHFL)
Author:
Not mentioned
Target Audience:
Borrowers, Banking Sector Stakeholders
Effective Period:
Indefinite
Approval Date:
22.05.2023
Date of Last Modification:
22.05.2023
Year:
2018
Region / City:
Australia
Subject:
Asphalt Mix Design and Specifications
Document Type:
Technical Specification
Organization / Institution:
Department of Transport
Author:
Department of Transport
Target Audience:
Contractors, Engineers
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Region / City:
Monterey, MA
Topic:
Conservation, Scenic Mountain Act
Document Type:
Notice of Intent Form
Organization:
Monterey Conservation Commission
Author:
Not specified
Target Audience:
Property owners, project applicants, conservation authorities
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2013
Region / City:
Geneva
Subject:
High Efficiency Video Coding (HEVC) specification
Document Type:
Liaison Statement
Organization / Institution:
ITU-T SG 16
Author:
Gary J. Sullivan, Thomas Wiegand
Target Audience:
3GPP, 3GPP2, ABU, ATSC, CEA, DLNA, DMB, DVB, ECMA, ETSI, IEC TC 100, IETF, IMTC, ITU-R SG 6, OIPF, OMA, SCTE, SMPTE, UCIF, VESA, W3C, WBU, WiFi Alliance
Effective Period:
January 2013
Approval Date:
January 2013
Modification Date:
N/A
Description:
Formal communication on the consent of the High Efficiency Video Coding (HEVC) standard, with emphasis on its technical capabilities and future development.
Year:
2024
Region / city:
Global
Subject:
Applicability of IEC 60079-0 for non-electrical equipment
Document type:
Decision
Organization:
IECEx System
Author:
NEPSI CN
Target audience:
IECEx Certification Bodies, Manufacturers, Regulatory Bodies
Period of validity:
N/A
Approval date:
2024-09
Amendment date:
N/A
Year:
20XX
Region / City:
International
Subject:
Technical changes in IEC 60079-X standard
Document Type:
Technical standard
Organization / Institution:
IEC (International Electrotechnical Commission)
Author:
IEC
Target Audience:
Technical professionals and standard users
Period of validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2025
Region / City:
Kigali, Rwanda
Subject:
Production of IEC materials on gender equality and gender-based violence
Document Type:
Request for Quotation
Organization / Institution:
Health Poverty Action, Rwanda Country Office
Funding Agency:
GIZ
Author / Contact:
Health Poverty Action Procurement Office
Target Audience:
Suppliers of printing and promotional materials
Submission Deadline:
17th November 2025, 05:00 PM
Required Delivery Date:
22nd November 2025
Delivery Location:
HPA Kigali Office
Currency:
Not specified
Validity of Offer:
30 days from submission deadline
Evaluation Criteria:
Compliance to specifications, price, delivery time, prior experience
Included Items:
Books, stickers, banners, certificates, decals, pull-up banners
Compliance Requirements:
HPA Bid Form, General Terms & Conditions, Code of Ethics, Trading License, VAT certificate, Rwanda Revenue Clearance, EBM proof, two references
Contract Conditions:
Award to best value offer; adherence to HPA Code of Ethics
Year:
2025
Region / City:
Omaha, NE, USA
Topic:
Clinical Program Documentation
Document Type:
Standards & Guidelines
Organization:
FACT
Author:
FACT
Target Audience:
Clinical Program Directors, Attending Physicians, Medical and Healthcare Professionals
Effective Period:
From November 10, 2025
Approval Date:
November 10, 2025
Date of Changes:
None
Document URL:
https://www.factglobal.org
Context:
A document outlining the submission requirements for clinical programs under the FACT accreditation process, specifically focused on documentation of immune effector cell programs in clinical settings.
Year:
2012
Region / City:
Botswana
Topic:
Electrical engineering
Document Type:
Notification
Agency:
Botswana WTO-TBT Enquiry Point
Author:
Botswana Bureau of Standards
Target Audience:
Industry professionals, standardization bodies, regulatory authorities
Period of validity:
Not specified
Date of adoption:
To be determined
Date of entry into force:
12 months from publication
Final date for comments:
Two months from circulation
Relevant documents:
IEC 60068-2-2:2007, IEC 60068-2-11:1981, IEC 60068-2-30:2005, IEC 60073:2002, IEC 60085:2007, IEC 60364 (all parts), IEC 60364-4-41:2005, IEC 60364-4-41:2005/AMD1:2017, IEC 60364-5-51:2005, IEC 60364-5-52:2009, IEC 60439 (all parts), IEC 60439 series, IEC 61439 series, IEC 60445:2017, IEC 60447:2004, IEC 60529:1989, IEC 60529 (1989)
Objective and rationale:
National security requirements; Consumer information, labelling; Prevention of deceptive practices and consumer protection; Protection of human health or safety; Protection of the environment; Quality requirements; Harmonization
Description:
IEC 61439-3:2012 outlines the requirements for low-voltage distribution boards (DBOs) operated by ordinary persons, providing technical revisions and aligning with IEC 61439-1:2011.
Year:
2012
Location:
Sunnyvale, California, USA
Organization:
International Electrotechnical Commission
Subcommittee:
62C
Working Group:
1
Reported by:
Geoffrey S. Ibbott, Ph.D
Position:
Convenor, Working Group 1; Chairman, Subcommittee 62C
Activity:
Semi-annual meeting
Countries represented:
USA, Canada, UK, Germany, Sweden, Switzerland, Belgium, Japan, China
Topics discussed:
Radiotherapy equipment safety, accelerator and X-ray therapy standards, gamma beam, ion beam, remote afterloader, IGRT standards
Dates of meeting:
March 28-30, 2012
Subgroup meeting dates:
March 26-27, 2012
Payment:
Travel reimbursement
Next meeting:
October 1-3, 2012, London or Crawley
Meeting type:
Official committee report
Meeting attendance:
28 representatives
Context:
Semi-annual report detailing discussions, approvals, and draft developments of international safety standards for medical electrical equipment used in radiation therapy.
Document section:
Annex
Subject:
Cross references of international and national standards
Country:
Sri Lanka
Field:
Electric vehicle charging systems and components
International standards organization:
International Electrotechnical Commission
National standards organization:
Sri Lanka Standards Institution
Referenced international standards:
IEC 61851, IEC 62196, IEC 61980, IEC 62576, IEC 62840, IEC 62893
Corresponding national standards:
SLS 1801, SLS 1802, SLS 1806, SLS 1807, SLS 1808, SLS 1809
Topic:
Electric vehicle conductive charging, connectors, wireless power transfer, battery swap systems, charging cables, capacitors for hybrid vehicles
Type of document:
Standards cross-reference table
Publication year of national standards:
2024
Structure:
Table mapping IEC standard parts to corresponding Sri Lanka standard parts
Year:
2016
Version:
2 (03/11/2023)
Standard:
IEC 61508-1:2010
Region / Organization:
International / CASS Scheme
Document Type:
Template for Conformity Assessment
Subject:
Functional safety of electrical/electronic/programmable electronic safety-related systems
Target Audience:
Assessors, Functional Safety Managers
Lifecycle Phase:
All phases of E/E/PE safety lifecycle
References:
CASS-508-SLC, CASS-508-SYS, CASS-508-SUB, CASS-508-SW
Purpose:
Support management and assessment of functional safety compliance
Competence Requirements:
Assessor training in functional safety and IEC 61508 standards
Assessment Scope:
TOE (Target of Evaluation) including functional safety management system, safety policy, organisation responsibilities, documentation, techniques and measures, corrective actions, competence evaluation, incident handling
Contextual Description:
Template-based conformity assessment source detailing procedures and responsibilities for managing and evaluating functional safety of electrical, electronic, and programmable electronic systems in line with IEC 61508 standards.
Year:
2018
Country:
Pakistan
Notifying Member:
Pakistan
Agency:
Pakistan Standards & Quality Control Authority (PSQCA)
National Enquiry Point:
WTO TBT National Enquiry Point, PSQCA Complex, Gulistan-e-Johar, Karachi
Products:
Uninterruptible Power Systems (UPS)
ICS Number:
33.100.29.200
Language:
English
Pages:
38
Related Documents:
IEC 62040-2-2016
Proposed Adoption Date:
90 days after circulation by the WTO Secretariat
Proposed Entry into Force:
90 days after circulation by the WTO Secretariat
Final Date for Comments:
60 days from notification
Contact Email:
[email protected]
Contact Website:
http://www.psqca.com.pk/
Notifying Member:
Pakistan
Responsible Agency:
Pakistan Standards & Quality Control Authority (PSQCA)
Responsible Unit:
WTO TBT National Enquiry Point
Agency Address:
PSQCA Complex, Gulistan-e-Johar, Karachi, Pakistan
Contact Email:
[email protected]
Website:
http://www.psqca.com.pk/
Standard Title:
Uninterruptible Power Systems (UPS) – Part 4: Environmental Aspects – Requirements and Reporting
Standard Designation:
PS: IEC 62040-4
ICS Classification:
29.200
Document Length:
16 pages
Language:
English
Related International Standard:
IEC 62040-4:2013
Technical Committee:
Power electronics. Industrial-process measurement and control (ESTC-3)
Approving Body:
National Standards Committee for Electronics
Approval Date:
11 November 2014
Product Scope:
Uninterruptible Power Systems delivering single or three-phase fixed-frequency AC output voltage not exceeding 1000 V
Subject:
Environmental aspects and reporting requirements for UPS systems
Document Type:
WTO TBT Notification
Comment Period:
60 days from notification
Proposed Adoption Date:
90 days after circulation by the WTO Secretariat
Proposed Entry into Force:
90 days after circulation by the WTO Secretariat
WTO Technical Barriers to Trade notification describing the adoption in Pakistan of the standard PS:
IEC 62040-4 concerning environmental aspects, requirements, and reporting for uninterruptible power systems across their life cycle.
Year:
1971
Region / City:
UK
Topic:
Temperature Sensors, Thermocouple Connectors
Document Type:
Product Specification
Organization / Institution:
Labfacility
Author:
Labfacility
Target Audience:
Manufacturers, Engineers, Technicians
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
20XX
Region / city:
California Pacific Region
Theme:
Agricultural production, contract farming
Document type:
Survey
Organization / institution:
USDA/NASS
Author:
National Agricultural Statistics Service
Target audience:
Agricultural contractors, producers, and stakeholders
Period of validity:
20XX
Approval date:
N/A
Date of amendments:
N/A
Year:
[XXXX]
Region / City:
Georgia
Topic:
Human services, public assistance
Document type:
Memorandum of Agreement (MOA)
Organ / institution:
Georgia Department of Human Services
Author:
Georgia Department of Human Services
Target audience:
Contractors and state agencies
Period of validity:
Effective Date to [End Date], with potential renewal options
Approval date:
[Approval Date]
Date of amendments:
[Amendment Date]
Document type:
Verification checklist
Related procedure:
Safety and Environmental Requirements for Contractors and Third Parties A2020/L0-SQE-PRO-014
Purpose:
Verification of access and work requirements for third parties and contractors
Responsible organisation:
Metro Trains Melbourne
Intended users:
MTM Responsible Person, third party or contractor, works supervisors
Scope:
Third party and contractor works on MTM premises and rail corridor
Applicable areas:
Rail corridor, stations, depots, sidings, maintenance buildings
Safety framework:
MTM Safety Management System
Associated permits:
Track access, electrical access, excavation, confined space, hot works, working at height
Compliance references:
MTM procedures, work instructions, engineering standards, permits and registers
Source type:
Internal operational compliance document