№ files_lp_3_process_9_77496
The procedure outlines the requirements for testing the steady-state reactive power capability of wind farm power stations (WFPS), focusing on both export and absorption of reactive power within the network, as well as safety and operational protocols.
Year: 2019
Region / City: Not specified
Topic: Reactive Power Testing
Document Type: Procedure
Organization / Institution: EirGrid
Author: Not specified
Target Audience: Not specified
Effective Period: Not specified
Approval Date: Not specified
Date of Modifications: Not specified
Test Purpose: To demonstrate the limits of the WFPS reactive power capability curve at the connection point.
Testing Requirements: Safety equipment, site induction, and qualified personnel
Version: 3.0
Revisions: 0.1, 1.0
Connections: HV Bushings of T101 in XX 110kV station
Note: Test Procedure Description
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.