№ lp_2_3_05735
Special provision specification section establishing scope, submittal requirements, construction procedures, measurement, and payment terms for temporary water management facilities in regulated in-water work areas under Oregon Department of Transportation contracts.
Document Code: SP00245
Section Number: 00245
Title: Temporary Water Management
Document Type: Special Provision
Specification Status: Not a Standard Specification
Related Publication: 2024 Book
Bidding Applicability Date: On or after 05-01-25
Last Updated: 01-16-25
Jurisdiction: Oregon
Issuing Agency: Oregon Department of Transportation
Abbreviations: TWM; TWMF; TWMP
Scope: Temporary water management facilities in regulated Work areas
Referenced Sections: 00150.35; 00280.14(a); 00280.15(a); 00290.30(a)(8); 00290.34; 00290.34(c); 00290.34(c)(3); 00290.80; 00290.90; 00390.11; 00445.11; 00820.11; 02340
Required Submittals: Contractor-developed Temporary Water Management Plan; Working Drawings; Pump Capacity Calculations; Water Intake Screen Details; Subcontractor and Superintendent Contact Information
Meeting Requirement: Pre-Work Meeting at Project Site
Measurement Method: Lump Sum; Unit Price per Day for Bypass Pump Monitoring; Time Basis for Monitoring
Payment Terms: Lump Sum for Temporary Water Management Facility; Unit Price for Bypass Pump Monitoring; No Separate Payment for TWMP or Facility Operations
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.