№ files_lp_3_process_7_046637
File format: docx
Character count: 3784
File size: 80 KB
Official course announcement detailing objectives, requirements, schedule, registration procedures, and accreditation information for the L-278 National Flood Insurance Program Community Rating System training held in Connecticut in June 2018.
Year:
2018
Program:
National Flood Insurance Program Community Rating System (CRS)
Course Code:
L-278
Organizing Institutions:
Connecticut Department of Energy & Environmental Protection (CTDEEP); Connecticut Association of Flood Managers (CAFM)
Affiliated Agencies:
Federal Emergency Management Agency (FEMA); Emergency Management Institute (EMI); Association of State Floodplain Managers (ASFPM)
Location:
Fort Trumbull State Park, New London, Connecticut
Course Dates:
June 4–7, 2018
Registration Deadline:
April 16, 2018
Registration Fee:
$45.00
Continuing Education Credits:
2.9 CEUs (EMI); 12 CECs (ASFPM)
Target Audience:
Municipal and tribal officials, regional and state officials, FEMA staff, and others providing technical assistance on CRS
Prerequisites:
Two years of floodplain management experience; or completion of E-273/L-273; or Certified Floodplain Manager (CFM) credential
Class Size Limit:
35 students
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / city:
Jakarta, Indonesia
Theme:
Ocean Science, SDGs, Marine Conservation
Document type:
Provisional Agenda
Organ / institution:
IOC Sub-Commission for the Western Pacific
Author:
N/A
Target audience:
IOC Member States
Period of validity:
April 2023
Approval date:
1 March 2023
Date of amendments:
N/A
Context:
Provisional agenda for the Fourteenth Intergovernmental Session of the IOC Sub-Commission for the Western Pacific, covering the organization, discussions, and reports on ocean science, SDGs, and regional cooperation initiatives.
Organization:
Grand Chapter of Wyoming, Order of the Eastern Star
Event:
One Hundred and Twenty-third Annual “Footprints Through Time” Session
Dates:
August 4–7, 2021
Location:
Little America Hotel and Resort, Cheyenne, Wyoming
Headquarters:
Little America Hotel and Resort, 2800 West Lincolnway, Cheyenne, WY 82009
Organized:
September 14, 1898
Registration Fee:
$25.00 (dues receipt required)
Registration Deadline:
July 1, 2021
Reserved Room Block:
“Eastern Star Grand Chapter of WY, OES” (until July 12, 2021)
Worthy Grand Matron:
Amber Mathisen
Worthy Grand Patron:
John Kenfield, Jr.
Grand Secretary:
Margie George, PM
Program Theme:
Footprints Through Time
Sessions:
Vesper Service, Informal Opening, Formal Opening, Annual Reports, Election of Grand Officers, Installation of 2021–2022 Grand Officers
Social Events:
Advance reservations required
Year:
2025
Event dates:
August 4–7, 2025
Location:
Tokyo, Japan
Event name:
ICCCN 2025 – The 34th International Conference on Computer Communications and Networks
Edition:
34th
Type of document:
Conference technical program
Organizing event:
International Conference on Computer Communications and Networks
Content includes:
Keynotes, technical sessions, invited sessions, workshops, panels, posters, reception and banquet
Main topics:
Computer communications, networking technologies, IoT, cyber-physical systems, artificial intelligence in networking, wireless communications, 6G, security, privacy, edge and cloud computing
Venues mentioned:
Sakura Room, Fuji Room, Asakaze, Hatsukaze, Matsukaze
Audience:
Researchers, academics, industry professionals in computer communications and networking
Language:
English
Year:
2026
Region / City:
New England, USA
Theme:
Historical Tourism, American Revolution
Document Type:
Travel Itinerary
Organizing Body:
Tour Company
Author:
Not specified
Target Audience:
Tour participants
Period of Activity:
May 4–7, 2026
Key Locations:
Plymouth Plantation, Lexington, Concord, Boston Freedom Trail, Salem Witch Museum, House of Seven Gables, John F. Kennedy Presidential Library
Included Meals:
Breakfast, lunch, dinner, pizza party
Transport:
Bus, flights
Security:
Hotel security provided
Year:
2023
Region / City:
Geneva, Switzerland
Study Period:
2022–2024
Type of Document:
Liaison Statement
Source / Organization:
ITU-T Focus Group on Metaverse (FG-MV)
Approval:
FG-MV meeting, 7 December 2023
Contact:
Shin-Gak Kang, FG-MV Chair, [email protected]
Audience:
TSAG, ITU-T Study Groups SG2, SG3, SG5, SG9, SG11, SG12, SG13, SG15, SG16, SG17, SG20
WG Involved:
PLEN
Deliverables Completed:
FGMV-01 to FGMV-15 technical reports and specifications
Upcoming Meetings:
5th FG-MV Meeting, 5–8 March 2024, Queretaro, Mexico
Definition Included:
Yes, definition of metaverse
Content Scope:
Technical requirements, interoperability, accessibility, security, ethics, economic and regulatory aspects, sustainability, AI for child protection
Invitation for Navdeep Shiroya to Attend WEDA Dredging Summit & Expo 2019 in Chicago, June 4–7, 2019
Date:
April 1, 2019
Document Type:
Invitation Letter
Event:
WEDA Dredging Summit & Expo 2019
Organizing Organization:
Western Dredging Association (WEDA)
Location of Event:
Hilton Chicago, Chicago, Illinois, USA
Event Dates:
June 4–7, 2019
Travel Period:
June 1–10, 2019
Invitee:
Navdeep Shiroya
Passport Number:
P6341302
Country of Invitee:
India
Profession of Invitee:
General Contractor
Author:
Thomas P. Cappellino
Author Position:
Executive Director
Organization Contact Email:
[email protected]
Purpose:
Participation in international conference, seminars, workshops, and technical sessions related to dredging, navigation, and marine construction
Financial Support:
No financial assistance provided by the organizing organization
Related Websites:
https://www.dredging-expo.com
; https:
//www.westerndredging.org
Year:
2018
Location:
Fukuoka, Japan
Subject:
Pacific Bluefin Tuna Conservation Management
Document type:
Meeting schedule
Organization:
Western and Central Pacific Fisheries Commission (WCPFC)
Audience:
Committee members and IATTC representatives
Period of validity:
4–7 September 2018
Sessions:
First, Second, Third
Joint meetings:
NC and IATTC
Dates of sessions:
4 September, 5 September, 6 September, 7 September
Time slots:
08:30–17:00
Year:
2020
Grades:
3-5
Week:
May 4 – May 7
Subjects:
Science, Coding, Engineering, Art, Social Emotional Learning
Type of document:
Educational activity schedule
Target audience:
Elementary school students
Format:
Weekly plan with daily activities
Sources referenced:
Origami Way, FoldnFly
Skills emphasized:
Creativity, problem-solving, fine motor skills, teamwork, coding basics
Year:
2018
Region / city:
Wales
Topic:
Sustainable Drainage Systems (SuDS), Surface Water Management
Document Type:
Guidance
Organ / institution:
Pembrokeshire County Council
Author:
Not specified
Target audience:
Developers, planners, and environmental officers
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2024
Region / City:
Ethiopia
Theme:
Disaster Risk Management, Flood Risk Management
Document Type:
Aide Memoire
Organization / Institution:
World Bank, Ministry of Water and Energy, Ethiopian Disaster Risk Management Commission
Author:
Saurabh Dani, Si Gou, and others
Target Audience:
Government of Ethiopia, World Bank staff, disaster management professionals
Action Period:
September 2-6, 2024
Approval Date:
August 14, 2024
Amendment Date:
N/A
Year:
2024
Region / City:
N/A
Theme:
Procurement Process, Grievance Redressal System, Call Center Services
Document Type:
Meeting Minutes
Organization / Institution:
HRU PIU-IFRAP
Author:
HRU PIU-IFRAP Team
Target Audience:
Bidders, Procurement Participants
Period of Validity:
N/A
Date of Approval:
2nd October 2024
Date of Changes:
N/A
Year:
2020
Region / City:
California
Topic:
Floodplain Management, Building Codes
Document Type:
Ordinance
Institution:
Local Government
Author:
Not specified
Target Audience:
Local Governments, Urban Planners, Building Authorities
Period of Action:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2023
Region / City:
East Sussex
Theme:
Flood Risk Management
Document Type:
Job Description
Organization:
East Sussex County Council
Author:
NJC
Target Audience:
Job applicants, professionals in flood risk management
Period of Validity:
Ongoing
Approval Date:
March 2023
Date of Amendments:
March 2023
Year:
2025
Region / City:
Ethiopia
Thematic Area:
Flood Risk Management, Disaster Risk Management
Document Type:
Implementation Support Mission Report
Organization / Institution:
World Bank, Government of Ethiopia
Author:
World Bank Implementation Support Mission
Target Audience:
Ethiopian Government Officials, World Bank Stakeholders
Period of Validity:
April 1 - 9, 2025
Approval Date:
March 20, 2025
Amendment Date:
N/A
Year:
2026
Region / city:
Milton, FL
Subject:
Floodplain management, stormwater, infrastructure improvement
Document type:
Public notice
Agency / organization:
City of Milton
Author:
City of Milton
Target audience:
Public, governmental entities
Period of validity:
Ongoing
Approval date:
January 14, 2026
Date of amendments:
Not specified
Année:
2024
Pays:
Indonésie
Projet:
National Urban Flood Resilience Project (NUFReP)
Numéro de projet:
P173671
Phase du projet:
Mise en œuvre
Financement IDA/IBRD:
USD 400 millions
Décaissements IDA/IBRD:
USD 5,34 millions (1,34 %)
Date d’approbation par le conseil:
19 décembre 2022
Date de début de mission:
29 juillet 2024
Date de fin de mission:
19 août 2024
Date de la dernière mission:
22 janvier 2024
Date d’efficacité:
12 avril 2023
Visite de site:
1 août 2024
Responsables de mission:
Jie Li, Evi Hermirasari
Objectif de développement du projet:
Résilience urbaine aux inondations
Composantes principales:
Analyse et planification des risques d’inondation, mesures de résilience urbaine aux inondations
Problèmes clés:
Retard des décaissements, acquisition foncière coûteuse, retards dans les projets NbS
Parties prenantes:
Ministère des Travaux publics et du Logement, Bappenas, Ministère de l’Intérieur, Ministère des Finances, gouvernements locaux
Type de document:
Compte rendu de mission de suivi
Annexes:
Liste des personnes rencontrées, cadre de résultats, avancement détaillé du projet, état des conventions légales, gestion des risques environnementaux et sociaux, questions fiduciaires, questions techniques, résumé des sous-projets des années 1 à 3
Year:
2021
Region / City:
Stoke-on-Trent
Subject:
Flood risk assessment
Document Type:
Final Report
Organization / Institution:
Stoke-on-Trent City Council
Author:
Joanne Chillingworth, Louise Goode, Edmund Mumford
Target Audience:
Local government, urban planners, developers
Period of Action:
2021
Approval Date:
December 2021
Date of Changes:
Not specified
Context:
This report is a detailed flood risk assessment for proposed development sites in the Stoke-on-Trent City Council area, providing recommendations for flood risk management and sustainable drainage systems.
Year:
2025
Region / City:
Blackwater Estuary
Subject:
Natural Flood Management, Hydrodynamics, Coastal Flood Defences
Document Type:
Tender
Organization:
RSPB
Author:
James Dunn
Target Audience:
Suppliers, Contractors
Period:
March 2025 to March 2027
Approval Date:
11 March 2025
Amendment Date:
N/A
Year:
2023
Region / City:
Henrico County, VA
Theme:
Floodplain management, hydrology, hydraulic analysis
Document Type:
Template, Technical Report
Organization / Institution:
Henrico County
Author:
Henrico County Engineering Department
Target Audience:
Engineers, Developers, Floodplain Administrators
Period of Effect:
N/A
Approval Date:
N/A
Amendment Date:
N/A