№ files_lp_4_process_3_124858
File format: docx
Character count: 33379
File size: 140 KB
Technical specification change request outlining L1 measurement requirements for NW A when MUSIM gaps are configured, detailing parameters, formulas, and conditions affecting radio resource measurement reporting.
Year:
2023
Region / City:
Xiamen, China
Document type:
Change Request
Source:
Huawei, HiSilicon
Work item code:
NR_DualTxRx_MUSIM-Core
Release:
Rel-18
Category:
B
Date submitted:
2023-09-19
Clauses affected:
9.5.4.1, 9.5.4.2, 9.8.4.1, 9.13.4.1
Proposed change affects:
UICC apps, ME, Radio Access Network, Core Network
Revision history:
Detailed L1-RSRP measurement configurations for MUSIM gaps
Consequences if not approved:
Requirements for MUSIM gaps are incomplete
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2022
Region / city:
Online, February 21 – March 3, 2022
Topic:
MUSIM network switching
Document type:
Technical report
Organization / institution:
Samsung
Author:
Sangyeob Jung (Samsung)
Target audience:
Industry professionals in telecommunications
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Organization:
3GPP TSG-CT WG1
Meeting:
#133-bis-e
Document number:
Rev_C1-220272E-meeting
Specification:
3GPP TS 27.007
CR number:
0759
Revision:
1
Current version:
17.4.0
Release:
Rel-17
Category:
B (addition of feature)
Work item code:
MUSIM
Source to WG:
Apple
Source to TSG:
C1
Date:
2022/01/08
Affected clauses:
10.1.X (New Clause), Annex B
Affected areas:
ME, Core Network, Test specifications, O&M Specifications
Implementation status:
Optional
Year:
2022
Region / City:
Electronic, 10 – 19 October 2022
Theme:
MUSIM Solutions for Rel-18
Document Type:
Discussion Document
Organization / Institution:
Qualcomm Incorporated
Author:
Qualcomm, MediaTek, Intel, Ericsson, Huawei, ZTE, OPPO, vivo, Samsung, LGE
Target Audience:
Technical experts in mobile network standards
Period of validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2025
Location:
Dallas, USA
Type:
Change Request
Work item code:
NR_ATG_enh-Perf
Category:
B
Release:
Rel-19
Source to WG:
CMCC
Source to TSG:
R4
Date submitted:
2025-10-27
Clauses affected:
5.1.1.7.8, 5.1.1.12, A.3.2.1.1, A.3.2.2.2
Related specifications:
TS 38.521-4, TS 38.101-1, TS 38.306
Purpose:
Introduce applicability and test rules for ATG CA and DL MIMO, and reference measurement channels
Consequences if not approved:
Rel-19 ATG specification incomplete
Revision history:
First change and next change detailed with tables for test applicability
Year:
2025
Location:
Dallas, USA
Document type:
Change Request (CR)
Work item code:
DC_R19_xBLTE_yBNR
Release:
Rel-19
Category:
B (addition of feature)
Source to WG:
Nokia, CHTTL, LG Electronics
Source to TSG:
RAN WG4
Affected specifications:
TS 38.101-3, TS 38.521-3, TS/TR related CRs
Clauses affected:
5.3B.1.1, 5.3B.1.2, 5.5B.2, 5.5B.2a, 5.5B.3, 5.5B.4, 5.5B.4a.3, 5.5B.4a.4, 5.5B.5.3, 5.5B.5.4, 5.5B.5a.3, 5.5B.5a.4, 6.2B.1.1, 6.2B.1.3, 6.2B.4.2.3, 6.5B.3.3, 7.3B.2.1, 7.3B.2.3.5, 7.3B.3.3
Current version:
19.3.0
Date of submission:
2025-11-25
Revision history:
includes updates from RAN4#116bis and RAN4#117 meetings
Affected network components:
UICC apps, Mobile Equipment (ME), Radio Access Network, Core Network
Year:
2025
Region / city:
Gothenburg, Sweden
Topic:
UICC apps, Radio Access Network, Core Network
Document Type:
Change Request
Organization / institution:
3GPP
Author:
Nokia
Target Audience:
TSG-RAN4, WG members
Validity period:
Not specified
Approval date:
2025-01-30
Date of changes:
Not specified
Year:
2026
Region / City:
Gothenburg, Sweden
Topic:
Accuracy requirements for CSI-RS based L1-RSRP and L1-SINR
Document Type:
Change Request
Organization:
3GPP
Author:
OPPO
Target Audience:
3GPP members, radio network engineers, and standardization bodies
Period of Validity:
Until approval
Approval Date:
Not specified
Modification Date:
Not specified
Release:
Rel-19
Work Item Code:
NR_duplex_evo-Perf
Category:
B (Addition of feature)
Affected Clauses:
10.1.19.2, 10.1.20.2, 10.1.27, 10.1.28
Other Specifications Affected:
TS 38.533
Test Specifications Affected:
TS/TR ... CR
Other Core Specifications Affected:
Not specified
Other Comments:
Revision history included
Year:
2024
Region / City:
Haiti
Theme:
Security, International Cooperation
Document Type:
Report
Author:
Ambassador Stuart Savage, Permanent Representative of Canada
Target Audience:
International partners, security agencies, UN organizations
Date of Approval:
22 March 2024
Date of Last Change:
22 March 2024
Year:
2024
Region / city:
Liberia, Monrovia
Theme:
Climate Information System, Resilience, Vulnerable Communities
Document Type:
Terms of Reference
Organization:
Environmental Protection Agency (EPA)
Author:
Environmental Protection Agency (EPA), United Nations Development Program (UNDP)
Target Audience:
National Consultants
Period of Implementation:
30 days
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Context description
Year:
2023
Region / City:
ASEAN region
Topic:
Trafficking in Persons, National Referral Mechanisms
Document Type:
Report
Organization / Institution:
ASEAN Intergovernmental Commission on Human Rights (AICHR), International Organisation for Migration (IOM)
Author:
Not specified
Target Audience:
Government officials, civil society organizations, practitioners in human rights, trafficking prevention
Period of validity:
Ongoing, related to consultations in 2023
Approval Date:
Not specified
Date of amendments:
Not specified
Year:
2022
Meeting:
3GPP TSG-RAN WG2 Meeting #119-e
Agenda item:
6.10.3.2.1
Document type:
Technical meeting report
Source organization:
Intel Corporation
Working group:
3GPP TSG-RAN WG2
Topic:
NR-NTN SMTC and measurement gaps
Release:
Rel-17, Rel-18
Related specifications:
3GPP TS 38.331, 3GPP TS 38.306
Contributing organizations:
Intel Corporation; Huawei; HiSilicon; Nokia; Nokia Shanghai Bell; Xiaomi; Samsung Research America; OPPO
Intended purpose:
Discussion and decision
Meeting format:
E-Meeting
Meeting dates:
August 17–29, 2022
Deadlines:
August 18, 2022
Year:
2023
Region / City:
NA worldwide
Theme:
Virtual meetings, generational differences, technology integration
Document Type:
Workshop Agenda
Author:
NA World Services
Target Audience:
NA members, workshop participants
Period of Application:
2023 and beyond
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
England
Theme:
Vision Impairment, Education
Document type:
Research report
Organization / institution:
RNIB
Author:
RNIB
Target audience:
Local authorities, education professionals, policymakers
Period of validity:
2023-2024
Approval date:
Not specified
Date of changes:
Not specified
Year:
2019
Region / city:
New Zealand
Topic:
Potato disease, biosecurity
Document type:
Research report
Organization / institution:
New Zealand Institute for Plant and Food Research Limited
Author:
Professor Richard E Falloon
Target audience:
New Zealand potato industry, biosecurity authorities
Period of validity:
Ongoing
Date of approval:
April 2019
Date of changes:
N/A
Year:
2022
Region / City:
Global
Topic:
Measurement gaps for NTN
Document type:
Report
Organization / Institution:
Intel Corporation
Author:
Intel Corporation
Target Audience:
Industry professionals, engineers, and organizations working on NTN and 5G networks
Period of validity:
N/A
Approval date:
N/A
Date of amendments:
N/A
Note:
Year
Subject:
Computational Chemistry, Molecular Properties
Document Type:
Research Supplementary Material
Target Audience:
Researchers in Computational Chemistry
Year:
2022
Region / City:
Chapel Hill-Carrboro, North Carolina
Topic:
Education, Racial and Ethnic Achievement Gaps
Document Type:
Thesis
Institution:
University of North Carolina at Chapel Hill
Author:
Anupama Joy
Target Audience:
Educators, Policymakers, Academics
Period of Study:
2018-2021
Approval Date:
April 26, 2022
Date of Last Update:
April 26, 2022
Gaps and Needs Committee Minutes 5/6/2021 | Balance of State Gaps and Needs Committee – Zoom Meeting
Date:
5/6/2021
Time:
9:32 am
Location:
Zoom
Committee members present:
Sara K., Elizabeth K-S., Bailey B., Isabel K., Jen B., Sandra R., Brianna Jones, Meredith McCoy, Julie M
Excused:
Michelle F.
Agenda items discussed:
2021 provider survey draft, updates on survey questions, 2021 WIBOSCOC client survey, inquiry from Marinette, WI
Next meeting:
June 3rd @ 9:30 am
Link to 2021 provider draft survey:
https://www.surveymonkey.com/r/2021Providers
Link to 2021 client draft survey:
https://www.surveymonkey.com/r/2021Clients
Link to Gaps and Needs Committee Match Form:
https://docs.google.com/forms/d/e/1FAIpQLSdR9ZhfiEcRy0v9MjAVR6JqlTAMQDueG7FojLYSR7bzF6-SOQ/viewform?usp=sf_link
Committee discussions:
Updates to questions in surveys, including changes for clarification and adding new questions; discussion on data capture for PowerPoint presentation.
Committee decisions:
Review final drafts of surveys, and members to take the survey for flow review.
Action items:
Meredith to check with Carrie Poser regarding sharing information with outside coalition.
Meeting adjourned:
10:35 am
Year:
2021
Region / City:
Puducherry, India
Topic:
Mental Health, Suicide Prevention, Mobile Clinic
Document Type:
Research Article
Organization / Institution:
Trust for Youth and Child Leadership (TYCL)
Author:
Siva Mathiyazhagan, Sakshi Nikhil Shah, Kartika Fitrianingsih, Hilaria Preethi, Yuvayazhini P, Rasaiya Govindhasamy
Target Audience:
Mental health professionals, youth workers, policymakers
Period of Validity:
N/A
Approval Date:
November 2020
Date of Changes:
N/A