№ files_lp_4_process_3_099327
File format: docx
Character count: 1225
File size: 263 KB
Year:
2026
Region / City:
Tacoma, WA
Theme:
Annual Fundraising Event
Document Type:
Event Announcement
Organization:
Tacoma Propeller Club
Author:
Tacoma Propeller Club
Target Audience:
Community Members, Event Attendees
Action Period:
February 21, 2026
Date of Approval:
Not specified
Date of Changes:
Not specified
Description:
Event announcement for an annual fundraising dinner featuring seafood, with details on ticket sales and sponsorship opportunities.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / Location:
Global / Marine Applications
Topic:
Marine Engineering / Propeller Optimization
Document Type:
Technical Guide
Organization / Institution:
Seaboard Marine Resources
Author:
Unspecified forum contributor
Target Audience:
Boat owners and diesel engine operators
Engine Models Covered:
Cummins QSB6.7, QSC 8.3 and similar
Content Focus:
Propeller loading, engine performance, fuel efficiency
Data Reference:
Manufacturer performance reports, personal observations
Practical Application:
Cruise RPM range optimization, real-world engine tuning
Year:
2015
Region / city:
Minneapolis, Minnesota
Industry:
Ventilation Equipment
Document Type:
Specification
Organization:
Twin City Fan & Blower
Author:
Twin City Fan & Blower
Target Audience:
Engineers, Contractors, and Industry Professionals
Period of Validity:
Indefinite
Approval Date:
2015
Amendment Date:
N/A
ISO Certification:
ISO 9001
Warranty Period:
12 months from startup or 18 months from shipment
Product Type:
Adjustable Pitch Propeller Wall Fans
Application:
Commercial and industrial air movement
Fan Type:
Propeller Wall Fans
Power Supply:
Direct or Belt Driven
Dimensions:
24 to 72 inches (610 to 1829 mm)
Fan Performance:
Airflow to 75,000 CFM
Static Pressure:
Up to 1.5 inches wg (373 Pa)
Motor:
Mounted in the airstream, suitable for temperatures up to 140°F (60°C)
Material:
Cast aluminum blades, hot-rolled steel fan shaft
Standard Compliance:
AMCA 204, AMCA 210, AMCA 300
Manufacturer:
Twin City Fan & Blower, Minneapolis MN
End of Product Design:
Yes
Note:
Year
Topic:
Fisheries management
Document Type:
Report
Contextual description:
A report analyzing alternative management measures and gear modifications to reduce bycatch in the South West crab and lobster fishery.
Department:
Department of Marine Resources
Jurisdiction:
State of Maine
Document type:
Regulatory chapter
Subject matter:
Lobster and crab fisheries management
Geographic scope:
Coastal and riverine waters of Maine, including specific islands and management zones
Regulated activities:
Lobster fishing, crab fishing, trap use, bait use, seasonal closures
Referenced law:
12 M.R.S.A. §6175
Administrative authority:
Commissioner of Marine Resources
Includes sections:
Definitions, fishing closures, trap limits, management zones, permit procedures
Year:
2023
Region / City:
Florida, USA
Topic:
Pathology, Mangrove Ecology, Disease Ecology
Document Type:
Research Article
Organization / Institution:
Teesside University, University of Florida, Florida Fish and Wildlife Research Institute, International Potato Centre
Authors:
Jamie Bojko, Amy L. Burgess, Thomas W. Allain, Erica P. Ross, Devon Pharo, Jan F. Kreuze, Donald C. Behringer
Target Audience:
Researchers, Ecologists, Pathologists
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
Not specified
Cuisine Type:
Seafood
Document Type:
Menu
Author:
Not specified
Target Audience:
Customers of Hooper’s Crab House
Period of Validity:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
Shanghai, China; Neijiang, Sichuan, China; Adelaide, Australia
Topic:
Aquaculture, Lipid Metabolism, Myo-inositol
Document Type:
Research Article
Institution:
East China Normal University, Neijiang Normal University, Flinders University
Authors:
Xianyong Bu, Xiaodan Wang, Zhideng Lin, Chunling Wang, Lingyu Li, Shubin Liu, Qingchao Shi, Jian G. Qin, Liqiao Chen
Target Audience:
Researchers, Aquaculture Professionals, Environmental Health Specialists
Period of Study:
56 days
Date of Approval:
Not specified
Date of Modifications:
Not specified
Context:
This scientific article presents research on the effects of myo-inositol supplementation on the growth, antioxidant status, and lipid metabolism of Chinese mitten crabs in aquaculture.
Year:
2019
Region / City:
Aleutian Islands, Alaska
Topic:
Fisheries management, crab population modeling
Document type:
Report
Organization:
Alaska Department of Fish and Game, Division of Commercial Fisheries
Author(s):
M.S.M. Siddeek, J. Zheng, C. Siddon, B. Daly, M.J. Westphal
Target Audience:
Fisheries scientists, management agencies, policy makers
Period of validity:
May 2019
Approval date:
Not specified
Date of changes:
Not specified
Year:
2024
Institution:
University of Washington – Tacoma
School:
School of Engineering and Technology
Course:
TCSS 462/562 Software Engineering for Cloud Computing
Type of document:
Tutorial
Version:
0.11
Software required:
Ubuntu 24.04, Docker
Target audience:
Students of TCSS 462/562
Platform:
Amazon EC2 c6i.large spot instance
Purpose:
Introduction to Docker, cgroups, and container resource isolation
Instructions:
Complete tasks and submit answers as PDF on Canvas
Date:
March 10, 2023
Region / City:
Tacoma, Pierce County
Topic:
Disabilities, Community, Accessibility
Document Type:
Meeting Minutes
Organization:
Tacoma Area Commission on Disabilities
Author:
Not specified
Target Audience:
Community members, disability advocates, local government officials
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Document Number:
DA 24-373
Release Date:
April 22, 2024
Applicant:
Tahoma Preservation
Location:
Tacoma, Washington
Agency:
Federal Communications Commission
Bureau:
Media Bureau
Division:
Audio Division
Facility ID:
787979
Application File Number:
0000231404
Pleading File Number:
0000238844
Type of Document:
Order
Subject:
Petition for Reconsideration
Service:
Low Power FM (LPFM)
Relevant Rule Sections:
47 CFR §§ 73.807, 73.870
Related Legislation:
Local Community Radio Act of 2010
Decision:
Petition Denied
Signatory:
Albert Shuldiner
Title of Signatory:
Chief, Audio Division
Year:
Not specified
Jurisdiction:
City of Tacoma
Region:
Tacoma, Washington
Country:
United States
Document Type:
Certification application form
Issuing Body:
City of Tacoma Community and Economic Development Department Housing Division
Legal Framework:
24 CFR Part 92 (HOME Program)
Federal Authority Referenced:
U.S. Department of Housing and Urban Development (HUD)
Regulatory References:
24 CFR 92.208; Internal Revenue Code Section 501(c)(3) and 501(c)(4); 2 CFR Part 215.21
Subject:
Certification requirements for Community Housing Development Organizations (CHDOs)
Purpose:
Qualification for CHDO set-aside HOME funds
Eligibility Criteria:
Organizational, legal, financial, board composition, and development capacity requirements
Required Attachments:
Staff and Board Roster; Low-Income Representative Certification; Public Official or Employee Certification
Application Submission Requirement:
Must be submitted with NOFA application
Geographic Scope:
Geographic area served by applicant organization
Intended Applicants:
Private nonprofit housing development organizations
Year:
2026
Region / City:
Tacoma
Topic:
Disabilities, Accessibility, Community Engagement
Document Type:
Meeting Minutes
Organization:
Tacoma Area Commission on Disabilities
Author:
Lucas Smiraldo, Chair Hester, Vice Chair Edick, and Commissioners
Target Audience:
Local Community, Disability Advocates, Government Entities
Period of Activity:
January 2026
Approval Date:
January 8, 2026
Date of Changes:
N/A
Date:
Saturday, February 11, 2024
Time:
10:00 AM - 3:00 PM
Location:
Tacoma Municipal Building, 747 Market Street, Conf. Room 248, Tacoma, WA 98402
Meeting Type:
Remote Online Meeting Via Zoom
Chair:
Hester
Facilitators:
Lucas, Mariama
Note:
Agenda Items
Participants:
Commissioners of Tacoma area Commission on Disabilities
Languages:
English, Lushootseed (Acknowledgement)
Session Type:
Advisory meeting
Next Steps:
Confirming Strategic Plans for 2024-25
Product:
REDARC Tow Pro Elite (EBRH-ACCV3-NA)
Vehicle:
2024 Toyota Tacoma
Components:
REDARC 13ft Remote Head Wiring Kit (RHWK-004); REDARC Square Switch Blank (TPSI-011); REDARC Encapsulated Protection Device (EPDK-001); 7-Pin Gooseneck Trailer Harness
Required Materials:
12ga blue, black, and white wires (12’ each); fuse holder with 25 amp fuse; wire connectors; wire loom; zip ties; screws
Tools:
Philips screwdriver; wire strippers; wire crimpers; wire cutters; panel removal tools; power drill; razor blade or utility knife; fiberglass rods; circuit test device
Electrical Connection:
Direct battery connection with inline fuse or connection to internal fuse block
Installation Areas:
Engine bay; passenger footwell; driver and rear door trim panels; A-pillar; rear storage compartment; frame rail
Procedure Sections:
Power wiring; Remote head installation; Trailer brake wire integration; Brake light signal connection; Controller mounting
Wiring Modifications:
Integration with factory harness; insertion of blue trailer brake wire; connection through rubber grommets; splice into light green gR3 brake signal wire
Mounting Location:
Driver side rear storage frame
Year:
Not specified
Region / City:
Tacoma, WA
Topic:
Facility Specifications
Document Type:
Specification Sheet
Organization / Institution:
The Mountaineers
Author:
Not specified
Target Audience:
Event planners, organizations looking for venue rental
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Organization:
CJK Community Homes (CJK)
Founder:
Noemi Cagatin-Porter
Year founded:
Not specified
Region / City:
Pierce County and City of Tacoma, Washington
Country:
United States
Type of document:
Organizational profile and narrative overview
Legal status:
Non-profit organization
Field:
Housing stability and homelessness services
Target population:
Marginalized residents, economically challenged individuals, and people experiencing housing instability
Programs mentioned:
Path to Home Ownership program
Affiliations:
Pierce County Consortium; Tacoma Housing Commission
Awards and recognition:
Empowerment Award at the 5th Annual Gala by Tacoma Urban League
Media coverage:
Puget Sound Business Journal; Tacoma Weekly
Year:
2017
Date:
June 8, 2017
Time:
4:00–5:45 PM
City:
Tacoma, Washington
Venue:
TACID, 6315 S. 19th, Tacoma, WA 98466
Document Type:
Meeting Agenda
Organizing Body:
Tacoma Area Commission on Disabilities
Related Institutions:
Office of Equity & Human Rights; City Council Community Vitality and Safety Committee; Pierce Transit
Key Topics:
ADA Transition Plan; Closed Captioning Initiative; Social Equity for Persons with Disabilities; Homeless Crisis; Accessible Taxi Services
Named Individuals:
Lucas Smiraldo; Krystal Monteros; Todd Holloway; Roxanne Miles; Luke Byram; JoAnne Fritsche; Devon Myers
Projects:
City-Led Project Liaisons; Commission Projects; Anti-Stigma Campaign; Closed Captioning in Public Establishments
Public Participation:
Public Comment Session Included
Organization:
Tacoma Creates
Region / City:
Tacoma, Washington
State:
Washington
Country:
United States
Thematic Focus:
Public funding for arts, culture, heritage, and science
Document Type:
Communication guidelines and sample messaging
Program Type:
Cultural Access Program under RCW 36.160
Approval Date of Initiative:
November 2018
Funding Mechanism:
Sales tax of one-tenth of one percent
Distribution Data:
$5.6 million distributed to 65 organizations in one year
Program Year Referenced:
2022–23
Target Audience:
Non-profit cultural organizations receiving Tacoma Creates funding
Purpose:
Standardized public acknowledgment and impact communication
Related Institutions Mentioned:
Tacoma Public Schools, Tacoma Public Library
Year:
2026
Region / City:
Tacoma, Washington
Topic:
Organizational Funding Application
Document Type:
Application Worksheet
Organization:
Various arts organizations applying for funding
Intended Audience:
Nonprofit organizations seeking Tacoma Creates support
Deadline:
March 9, 2026, 11:59 PM
Sections Included:
Organization Contact Information, Funding Eligibility, Organization Background, Work Samples, Attendance Summary, Budget Documentation
Submission Method:
Online via tacomaarts.submittable.com
Optional Sections:
Work Samples, Budget Clarifications, Additional Budget Documentation
Purpose:
To gather organizational information and prepare responses for Tacoma Creates funding applications