№ files_lp_4_process_1_25110
File format: docx
Character count: 3628
File size: 20 KB
Guideline for engineers and planners detailing standards for resurfacing, restoring, and rehabilitating rural roads, including lane widths, curvature, superelevation, clearances, bridge criteria, and guardrail requirements.
Year:
2026
Region:
United States
Topic:
Rural road design standards
Document type:
Technical guideline
Organization:
State Department of Transportation
Target audience:
Civil engineers, transportation planners
Design traffic (ADT):
<400, 400-1700, >1700 vehicles/day
Anticipated posted speed:
55 mph
Lane width:
10–11 ft
Combined lane and shoulder width:
12–17 ft
Maximum horizontal curvature:
10–12.25 degrees
Vertical alignment:
Existing grades and sags specified
Superelevation:
0.08 ft./ft. maximum
Clearances:
Horizontal 10–14 ft, vertical 14 ft
Bridge requirements:
Legal loads without posting, minimum width based on ADT
Guardrail standards:
According to EPG 606.1
Culvert and fill slope guidance:
Existing conditions unless safety analysis requires modifications
Exceptions:
Allowed for curves, bridge railings, and design features based on traffic and safety analysis
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Laguna Niguel, California
Subject:
Residential annual resurfacing program
Document Type:
Notice of Invitation for Bids
Agency:
City of Laguna Niguel
Author:
Marissa J. Asistin, City Clerk
Target Audience:
Contractors, Engineering Professionals, and Bidders
Effective Period:
Until April 14, 2025
Approval Date:
March 27, 2025
Amendment Date:
April 3, 2025
Project:
The Resurfacing of Hanna Avenue for the City of Anniston
Owner:
City of Anniston
Bid Deadline:
March 26, 2025, 10:00 AM
Bid Opening Location:
2nd Floor Historic Courtroom, Anniston City Hall, 1129 Noble Street, Anniston, Alabama
Pre-Bid Conference:
March 19, 2025, 10:00 AM (mandatory)
Funding Source:
CDBG funds
Scope of Work:
Resurfacing of Hanna Avenue with 230 tons of ½” wearing surface, asphalt leveling, tack coat placement, manhole risers, and traffic control
Completion Period:
Thirty (30) working days from Notice to Proceed
Bid Security:
Bid Bond or cashier’s check between five (5) percent of Bid Price and $10,000.00
Submission Requirements:
Sealed envelope with bidder’s name, license number, address, and project name
Irrevocability Period:
60 days after submission
Legal Framework:
Title 34, Chapter 8, Article 1 and Title 39, Chapter 3, Code of Alabama 1975, as amended
Licensing Authority:
State Licensing Board for General Contractors
Bidder Registration Requirement:
Registration at SAM.gov
Named Insured:
City of Anniston
Authorizing Official:
Jack Draper, Mayor
Type of Document:
Public works procurement notice
Project Name:
Newport Pagnell Paths Resurfacing Project
Location:
Newport Pagnell, Milton Keynes and surrounding areas
Document Section:
Appendix A
Document Type:
Tender evaluation and submission form
Issuing Body:
Newport Pagnell Town Council
Subject Area:
Public infrastructure maintenance and procurement
Project Scope:
Resurfacing of paths in various parks in Newport Pagnell
Evaluation Structure:
Technical evaluation, financial assessment, and pricing review
Evaluation Rounds:
Round 1 Headline Questions; Round 2 Contract Specific Questions; Round 3 Financial Assessment
Maximum Technical Score:
60 points
Maximum Pricing Score:
40 points
Total Evaluation Score:
100 points
Financial Requirements:
Submission of audited financial statements for the previous three years
Eligibility Conditions:
Contractor experience, health and safety compliance, administrative capacity, and financial stability
Communication Requirements:
Ability to send and receive electronic communications and access remote internet portals
Health and Safety Oversight:
Compliance with Health and Safety Executive regulations and procedures for work in public open spaces
Procurement Context:
Contractor selection for public works contract
Required Supporting Materials:
Method statement, work schedule, references, financial records
Year:
2021
Region / City:
USA
Topic:
Disability evaluation for veterans
Document Type:
Medical / Legal Consultation
Organization:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Veterans, VA staff, healthcare providers
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2018-2020
Region / City:
Superior, WI
Topic:
Environmental Restoration, Beach Management
Document Type:
Project Scope of Work
Organization / Institution:
Wisconsin Department of Natural Resources (WDNR)
Author:
Linda Cadotte, City of Superior; Matt Steiger, WDNR
Target Audience:
Government Agencies, Environmental Researchers, Local Authorities
Effective Period:
May 1, 2018 - November 30, 2020
Approval Date:
Not specified
Date of Modifications:
Not specified
Project Budget:
$672,249
Project Location:
Barkers Island Inner Beach, St. Louis River AOC, Superior, WI
Problem Statement:
The restoration of Barkers Island Inner Beach is necessary due to E. coli contamination, identified from various sources, to remove beneficial use impairments in the St. Louis River AOC.
Proposed Work:
The project involves removing impervious surfaces, creating buffer zones, and enhancing beach facilities to reduce contamination and improve water quality.
Collaboration with Partners:
WDNR collaborated with local and state agencies, as well as universities and community organizations.
Timetable:
May 1, 2018 - November 30, 2020
Deliverables:
Quarterly reports, competitive bidding, construction completion, monitoring and maintenance through November 30, 2020
Outcomes:
Improved water quality, reduced beach closures, and long-term maintenance planning for the restored beach
Description:
A document outlining the scope, timeline, and objectives for the restoration of Barkers Island Inner Beach to address water quality issues and enhance public recreation facilities.
Year:
2020
Region / city:
Online
Topic:
Conservation and Restoration of the Bukhara Deer
Document Type:
Template for Submission of National Reports
Organ / institution:
CMS Secretariat
Author:
UNEP/CMS
Target Audience:
Range States, conservation agencies, NGOs, government bodies
Period of Validity:
From 19 June 2020 to 22 October 2020
Approval Date:
19 June 2020
Date of Changes:
N/A
Year:
2020
Region / city:
Isle of Vilm, Germany
Topic:
Conservation and Restoration of the Bukhara Deer
Document Type:
Report Template
Organization / institution:
UNEP/CMS Secretariat
Author:
UNEP/CMS Secretariat
Target Audience:
Signatories of the Memorandum of Understanding
Period of validity:
From: dd/mm/yyyy To: dd/mm/yyyy
Approval Date:
19 October 2020
Date of changes:
N/A
Year:
2024
Region / city:
New Forest
Theme:
Environmental Restoration, Freshwater, Wetlands
Document Type:
Report
Organization / Institution:
New Forest Freshwater and Wetland Restoration Forum
Author:
New Forest Freshwater and Wetland Restoration Forum
Target Audience:
Environmental Scientists, Restoration Practitioners, Ecologists
Period of Validity:
2024 and ongoing
Approval Date:
2024
Date of Changes:
N/A
Year:
2024-2025
Region / city:
Colorado
Theme:
Wetland and Riparian Restoration, Enhancement, & Creation
Document Type:
Request for Applications (RFA)
Organ / institution:
Colorado Parks and Wildlife
Author:
Colorado Parks and Wildlife
Target audience:
Local governments, other state and federal land management agencies, tribes, non-profit habitat conservation organizations, private companies
Action period:
2024-2025
Approval date:
Not specified
Date of modifications:
Not specified
Year:
2023
Region / City:
Chesapeake Bay Watershed
Topic:
Stream Restoration, Forest Management
Document Type:
Program Report
Organization / Institution:
Chesapeake Bay Program (CBP), Chesapeake Bay Trust (CBT)
Author:
Not specified
Target Audience:
Government agencies, researchers, environmental stakeholders
Period of Implementation:
Short-Term, Mid-Term, Long-Term
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Region / City:
Georgia
Theme:
Land Degradation Neutrality, Pastureland Management, Sustainability
Document Type:
Project Identification Form
Organization / Institution:
GEF, MEPA
Target Audience:
Stakeholders in environmental management, local communities, governmental bodies
Period of Action:
36 months
Context:
This document outlines a project proposal aimed at achieving land degradation neutrality in Georgia through the restoration and sustainable management of degraded pasturelands, as part of the GEF initiative.
Year:
2023
Region / City:
Singapore
Theme:
Heritage Preservation
Document Type:
Application Form
Organization / Institution:
Preservation of Sites and Monuments (PSM)
Author:
National Monuments Fund (Restoration)
Target Audience:
Individuals or organizations applying for grants for monument restoration
Effective Period:
Annual (Deadline for submissions: 31 October)
Approval Date:
Not specified
Date of Changes:
Not specified
Date:
June 25, 2025
Project:
Concrete Restoration Project
Update number:
49
Organization:
NAC
Role of author:
Project coordinator
Author:
Eliot
Geographic scope:
Residential condominium buildings
Buildings covered:
5, 6, 7, 8, 12, 15, 17
Audience:
Residents and homeowners
Project aspects:
balcony restoration, walkway demolition, enclosure installation, painting, inspections
Communication policy:
Centralized communication through project coordinator
Status period:
Weekly update
Year:
2024
Region / City:
Kazakhstan
Theme:
Environmental Restoration, Climate Change Mitigation
Document Type:
Implementation Support Mission Report
Organization / Institution:
World Bank
Author:
World Bank Team
Target Audience:
Project stakeholders, Government officials, Environmental experts
Period of Validity:
October 14-18, 2024
Approval Date:
June 14, 2021
Amendment Date:
October 21, 2024
Country:
Rwanda
Year:
2024
Month:
March
Project name:
Rwanda Emergency Connectivity Restoration Project (RECOR)
Project code:
P504023
Document type:
Stakeholder Engagement Plan
Sector:
Transport infrastructure
Implementing agency:
Rwanda Transport Development Agency
Supervising ministry:
Ministry of Infrastructure
Development partner:
World Bank
Regulatory framework:
National laws of Rwanda and World Bank Environmental and Social Standards
Geographic scope:
National
Target stakeholders:
Project-affected people, local communities, government institutions, private sector, civil society organizations
Related mechanisms:
Grievance Redress Mechanism, stakeholder consultation and disclosure processes
Policy context:
Vision 2050, National Strategy for Transformation 2017–2024
Year:
2025
Region / City:
Cape Shores
Topic:
Construction, Restoration
Document Type:
Project Update
Organization / Institution:
Cape Shores Board
Author:
Eliot
Target Audience:
Residents of Cape Shores
Effective Period:
June 9, 2025 - ongoing
Approval Date:
June 9, 2025
Modification Date:
N/A
Year:
2022
Country:
United Republic of Tanzania
City / Region:
Dar es Salaam, Lower Msimbazi Basin
Project:
Dar es Salaam Metropolitan Development Project
Subproject:
Lower Msimbazi Upgrading Project
Document type:
Draft Resettlement Action Plan and Livelihood Restoration Plan
Status:
Draft
Client:
President’s Office, Regional Administration and Local Government
Implementing authority:
Government of Tanzania
Tender number:
ME/022/2020/2021/HQ/C/09
Financing:
IDA Credit No. 5585-TZ
Consultants:
CDR International; NORPLAN Tanzania Ltd; DASUDA; Deltares
Authors:
D. Sungusia; B. Van de Sande
Revision:
V2.1
Document code:
B1903-06-R004
Preparation dates:
January–March 2022
Associated plans:
Msimbazi Opportunity Plan; Lower Msimbazi Upgrading Project Feasibility Study
Year:
2023
Region / City:
New Jersey
Topic:
Energy Taxes, Municipal Government Funding
Document Type:
Resolution
Author:
[Insert Name of Municipality]
Target Audience:
State policymakers, Municipal officials
Period of Validity:
SFY 2024, SFY 2025, SFY 2026
Approval Date:
[Insert Date]
Amendment Date:
[Insert Date]
Organization:
East Sussex County Council
Department:
CET – Adult College for Rural East Sussex
Job title:
Accredited Tutor
Grade:
Single Status 7
Reporting to:
Business Development Coordinator; Learning & Development Coordinators
Region:
Rural East Sussex
Sector:
Adult education
Role type:
Accredited teaching role
Target learners:
Adult students
Key responsibilities:
Course design and planning; delivery and facilitation of inclusive learning; assessment and feedback; learner progress recording; compliance with safeguarding, equality, health and safety, GDPR, JCQ and awarding body requirements; collaboration with support staff; professional development
Required qualifications:
QCF Level 3 or Level 4 subject qualification; QCF Level 2 English and Maths; relevant teaching qualification
Required skills:
Teaching and curriculum expertise; assessment practice; digital and IT skills; communication and teamwork
Employment context:
Adult community and further education provision