№ lp_2_3_05108
Press release detailing the selection of BEUMER Group to engineer and supply a long-distance overland conveyor for the expansion of the Blue Creek Mine, highlighting technical specifications, project challenges, and planned operational timeline.
Year: 2024
Location: Alabama, USA
Topic: Mining, Coal Transportation
Document Type: Press Release
Organization: Warrior Met Coal, BEUMER Group
Author: Verena Breuer, Carsten Otte (Agency)
Project Scope: Design and supply of a single-flight curved overland conveyor for 1,500 STPH capacity
Conveyor Length: 14 km (9 miles)
Expected Operation Start: End of 2025
Target Audience: Industry stakeholders, investors, media
Key Features: 18 horizontal curves, nine load-sharing drives, elevated sections to minimize earthworks
Technology: Troughed belt conveyor, VFDs, MCCs, PLC control systems
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.