№ lp_1_2_47397
File format: docx
Character count: 85493
File size: 124 KB
Technical discussion summary from a 3GPP RAN WG1 meeting presenting company views, assumptions, and proposals regarding feasibility, reliability, and design aspects of Layer 1 signaling for activation and deactivation of cell DTX/DRX mechanisms based on liaison input from RAN2.
Year:
2023
Location:
Incheon, South Korea
Event:
3GPP TSG RAN WG1 Meeting #113
Working Group:
RAN WG1
Agenda Item:
9.7.2
Document Type:
Discussion summary
Source:
Moderator (Intel Corporation)
Organization:
3GPP
Technical Area:
Radio Access Network
Topic:
Cell DTX/DRX mechanisms
Release Context:
Rel-18 (discussion scope)
Related Liaison Statement:
LS from RAN2 R1-2304334
Involved Companies:
Intel, CATT, Xiaomi, Nokia, Spreadtrum, MTK, ETRI, vivo, Apple, Qualcomm, Panasonic, Huawei, ZTE, Ericsson, OPPO, Samsung, Lenovo, China Telecom
Signaling Layer:
Layer 1 signaling
Signaling Methods:
Group-common DCI, UE-specific DCI
Meeting Dates:
May 22–26, 2023
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Chicago, USA
Topic:
Enhancements on cell DTX/DRX mechanism
Document Type:
Discussion Summary
Organization / Institution:
3GPP TSG RAN WG1
Author:
Moderator (Intel Corporation)
Target Audience:
3GPP TSG RAN WG1 Participants
Period of Validity:
November 13th – 17th, 2023
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Xiamen, China
Topic:
Enhancements on cell DTX/DRX mechanism
Document type:
Technical contribution
Organization / Institution:
Intel Corporation
Author:
Moderator
Target audience:
3GPP TSG RAN WG1 participants
Period of validity:
2023-10-09 to 2023-10-13
Approval date:
Not specified
Date of modifications:
Not specified
Context:
A technical document discussing proposed enhancements to the cell DTX/DRX mechanism, including changes to RRC parameters and specifications for cell DTX/DRX operation and signaling.
Year:
2023
Region / city:
Toulouse, France
Theme:
Cell DTX/DRX mechanism
Document type:
Discussion document
Organization:
3GPP TSG RAN WG1
Author:
Moderator (Intel Corporation)
Target audience:
Technical contributors of RAN1 #114 meeting
Period of action:
August 21–25, 2023
Approval date:
Not specified
Date of amendments:
Not specified
Context:
Technical summary of proposed enhancements and observations on the cell DTX/DRX mechanism discussed during the 3GPP RAN WG1 #114 meeting.
Year:
2026
Region / City:
Goa, India
Topic:
Satellite-based positioning in 6G systems
Document Type:
Draft Specification
Organization / Institution:
3GPP
Author:
Xiaonan Shi, Jean Trakinat
Target Audience:
3GPP members, telecommunication professionals
Effective Period:
February 2026
Approval Date:
TBD
Revision Date:
TBD
Year:
2026
Region / City:
Goa, India
Topic:
Data Collection & Consumption
Document Type:
Technical Report
Organization:
3GPP
Author:
Xiaonan Shi, Jean Trakinat
Target Audience:
3GPP members, 6G system developers
Period of Validity:
Ongoing
Approval Date:
TBD
Date of Modifications:
February 2026
Agenda Item:
x.x
Document for:
Approval
Contact:
Xiaonan Shi ([email protected]
Note:
)
Abstract:
Provides initial Table 14.1.5-3 for consolidation discussions on 6G data collection and consumption mechanisms.
Context:
This document is a technical report for discussion and approval of proposed requirements for data collection and consumption within 6G systems, focusing on privacy, security, and data processing.
Date issued:
7 January 2025
Source:
Orange
Subject:
Pfd limits for the protection of IMT Terrestrial Networks (WRC-27 AI 1.13)
Group membership required to read? (Y/N):
N
Summary:
This document provides technical analysis on the pfd limits for the protection of IMT terrestrial networks.
Proposal:
It is proposed to replace the study B by this document
Background:
ECC-PT1 has developed a working document on technical studies for WRC-27 AI 1.13 at its September meeting.
Note:
PFD limits for IMT TN protection
Frequency bands:
694/698-960 MHz, 1 427-1 518 MHz, 1 710-1 785 MHz, 1 805-2 025 MHz, 2 110-2 200 MHz, 2 300-2 400 MHz, 2 500-2 690 MHz.
Pfd value dB(W/(m² · MHz)):
-133.2, -127.7, -124.3
IMT BS non-AAS maximum antenna gain (dBi):
15 dBi, 18 dBi, 18 dBi
Year:
2025
Region / City:
Groningen, The Netherlands
Subject:
Draft CEPT Brief on WRC-27 Agenda Item 1.13
Type of Document:
Brief
Organization / Institution:
CEPT
Author:
CEPT PT1
Target Audience:
ITU-R working parties, regulatory authorities, mobile operators
Date Issued:
2nd July 2025
Date of Approval:
Not specified
Date of Changes:
Not specified
Period of Action:
2025-2027
Note:
Year
Agency:
Secretary of State
Jurisdiction:
South Carolina
Document Number:
5104
Statutory Authority:
1976 Code Sections 26-2-5 et seq.
Subject:
Electronic notaries public
Type of Document:
Administrative regulation
Status:
Final
State Register Publication:
Volume 46, Issue 6
Proposed Publication:
State Register Volume 46, Issue 1
Effective Date:
June 24, 2022
Chapter:
113
Article:
4
Act Reference:
South Carolina Electronic Public Notary Act, Act 85 of 2021
Date Signed into Law:
May 18, 2021
Year:
2017
Country:
India
Notification:
G.S.R. 113 (E)
Division:
Transmission
Scope:
Multiplexing Equipment
Standards:
CISPR 22 (2008), IEC 61000 series, IS 13252 part 1:2010, IS 10437:1986
Type of Document:
Technical Specification
Testing Authority:
Designated CAB of TEC
Certification:
Mandatory Testing & Certification of Telecommunication Equipment (MTCTE)
Interfaces:
2 Wire, 4 Wire, CCB Pay Phone, Hot Line, Telex, 2 Mbps, 8 Mbps, 34 Mbps, 64 Kbps, STM-1/4/16 Optical, GE Optical, PSTN, GPON, SHDSL, ISDN, OTU-1
Safety:
Optical connector protection and laser shutdown requirements
Security:
Inputs from Security Wing, DOT
Year:
2014
Region / City:
New York
Theme:
Crisis Prevention and Recovery
Document Type:
Final Report
Organ / Institution:
UNDP
Author:
Dagmar Kunzmann Briefel
Target Audience:
UNDP staff, donors, and UN partners
Period of Validity:
2000-2013
Approval Date:
June 24, 2014
Date of Changes:
None
Year:
2018
Region / City:
Western Australia
Topic:
Youth Detention Centre Policies
Document Type:
Official Policy
Agency / Institution:
Department of Justice, Western Australia
Author:
Department of Justice
Target Audience:
Custodial Officers, Justice Staff, Official Visitors
Validity Period:
Ongoing
Approval Date:
2018
Amendment Date:
N/A
Year:
2017-2018
Region / City:
Red Bank
Topic:
Forensic Science
Document Type:
Course Syllabus
Organization / Institution:
Syracuse University
Author:
Mrs. Klatt
Target Audience:
High school students enrolled in the course
Period of Validity:
2017-2018
Approval Date:
Not specified
Date of Amendments:
Not specified
Document number:
Doc. CPG(24)024 ANNEX IV-13
Meeting:
CPG27-2
Location:
Prague, Czech Republic
Meeting dates:
10–13 December 2024
Date issued:
10 January 2025
Source:
CPG27-2
Subject:
Draft CEPT Brief on WRC-27 agenda item 1.13
Agenda item:
WRC-27 AI 1.13
Related resolution:
Resolution 253 (WRC-23)
Responsible groups:
ECC PT1; ITU-R WP 4C; ITU-R WP 5D
Frequency range under study:
694/698 MHz – 2.7 GHz
Services concerned:
Mobile-Satellite Service (MSS); International Mobile Telecommunications (IMT)
Type of document:
Draft brief / meeting working document
Status:
Preliminary CEPT position TBD
Year:
2026
Region / City:
Goa, India
Subject:
6G satellite communication
Document Type:
Technical Report
Organization:
3GPP
Author:
Xiaonan Shi, Jean Trakinat
Target Audience:
3GPP members, researchers in satellite communication
Effective Period:
Ongoing
Approval Date:
9-13 February 2026
Date of Changes:
February 2026
Context:
Technical report for 6G satellite communication standardization discussions, focusing on the consolidation of various potential requirements for satellite-based services.
Year:
1791
Region / city:
United States
Theme:
American History, Constitutional History
Document Type:
Lecture Notes
Institution:
Not specified
Author:
Not specified
Target Audience:
Students
Period of validity:
Not specified
Approval Date:
Not specified
Date of changes:
Not specified
3GPP TSG-RAN WG4 Meeting #113 Topic Summary for [113][317] IoT_NTN_TDD, Orlando, 18–22 November 2024
Organization:
3GPP TSG-RAN WG4
Meeting number:
#113
Location:
Orlando, US
Meeting dates:
18–22 November 2024
Agenda item:
7.28.3
Source:
Moderator (Qualcomm Incorporated)
Document type:
Technical meeting contribution (information)
Work item:
IoT_NTN_TDD
Related agenda items:
7.28.1 General aspects and work plan; 7.28.2 Study of impact due to periodic pattern
Technical scope:
NB-IoT NTN TDD mode and new operating band specification
Target frequency band:
1616–1626.5 MHz MSS allocation
Satellite scenarios:
LEO @600 km and @1200 km, set-1 satellite parameters (TR 36.763)
Baseline TDD periodicity:
N = 9 radio frames
Baseline DL consecutive subframes (D):
8
Baseline UL consecutive subframes:
8
Channel bandwidth:
200 kHz
Deployment assumptions:
Standalone NB-IoT with anchor and non-anchor carriers; Earth fixed tracking area; Earth fixed or Earth moving cells for NGSO
Responsible groups:
RAN1, RAN2, RAN4
Study phase start:
RAN1 from Oct 2024; RAN4 from Nov 2024
Checkpoint:
RAN#106 completion of study phase
Key aspects under study:
Periodic UL/DL pattern impact on UE synchronization, RRM, RF requirements, demodulation, higher layer impacts
Exclusions:
No NTN-NTN coexistence study; reuse of existing RAN4 RF emission requirements
Year:
2020
Location:
Cotswold, Gloucestershire, UK
Event Type:
Triathlon
Organizer:
113 Events
Target Audience:
Competitors of the Cotswold 113 Triathlon
Date of Event:
20th September 2020
Race Schedule:
20th September 2020
Registration Details:
Pre-race registration and on-site check-in
Medical Coverage:
First aid provided
Special Notes:
Covid-19 specific rules in place
Start Time:
07:00 AM
Wave Start Times:
07:00-08:30
Parking Fees:
£5 (cash only)
Course Details:
Swimming, cycling, and running course sections
Prize Information:
No competitive prizes
Medical Emergency Contact:
Graeme Hardie, Nicci Hardie, Steve Dutton
Note:
Event Type
Middle Distance Triathlon
Year:
2020
Region / city:
Global
Theme:
Biodiversity, Conservation
Document Type:
Evaluation Report
Agency / Institution:
United Nations Development Programme (UNDP)
Author:
José Galindo
Target audience:
Stakeholders in conservation and biodiversity
Period of validity:
2016-2020
Approval date:
October 2015
Date of amendments:
Not specified
Year:
2024
Region / city:
European Union
Topic:
Public Sector Loan Facility, Just Transition Mechanism
Document Type:
Annual Report
Organ / institution:
European Commission
Author:
European Commission
Target Audience:
European Parliament, Council of the European Union, public sector entities, stakeholders in Just Transition Mechanism
Period of validity:
2024
Date of approval:
Not specified
Date of changes:
Not specified